Loading...
12 Carpenter St - C of NA application - 3-tab roof r• RECEIVED Salem Historical Commis ' APR 2 5 2010 0fiPT. OF PLANNING 8& 120 WASHINGTON STREET SALEM.MASSACHUSET S 0197000MMUNITY DEVELOPMENT 978j 619-5685 FAX f978E 740-0404 APPLICATION FOR A CERTIFICATE OF NON-APPLICABILITY Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Non-Applicability as described below for: ❑ New Construction ❑ Moving ❑ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Sign ❑ Other TJis*�ict: ❑Derby Street ❑Lafayette Street ❑McIntire ❑Washington Square Address of Property: 1 QL r W (- Sl Name of Record Owner(s): �% ra i_ (31C-D U C_ ` Owner Mailing Address: la C A- T e-- 97-. Description of Work Prolaosed: Qern,nve ( � -�` ��� s L*L�S �P- � � °`��e S"'ce Applications must include photos of existing conditions, taken from all public wways. Name o-f7ApplicantTb �RN S't ❑Owner contractor ❑Tenant ❑Other: Tel. #: ! S0 (k�f E-mail Address: V,;f2 Certificate will be mailed to the owner unless otherwise indicated here: Certificate should be mailed to: Name ' e,- Mailing address: 19 CIA r I oigol f-&- City: State" Zip: L A 0A 0 • , qb Constructioll GAFMATERIAW 49IDIIVOF RDDFIIVG, CORPORATION WINDOWS and MUCH MORE l! 781-520-1699 04103118 Mr William Grover, 12 Carpenter St Salem Ma 01970 978-745-6370 857-272-5722 The following is an estimate for work to be completed at the above address in a timely, clean, and Professional manner. Permit and waste disposal is included A) Tarp around the whole home. B) Strip off existing roof shingle down to the wood sheathing. (Up to 3 layers included) C) Repair/replace up to 32 sq ft of sheathing as needed D) Install new white drip edge to the perimeter of the roof. E) Cover the entire roof surface with ice and water shield on the tat side due to possible solar installation.Left side to receive 2 rows=6ft of ice and water shield. F) Re lace all vent pipe boots.Install ice and water shield around the chimneys and skylights G) Cover the rest of the roof surface with O/C synthetic underlayment. II) etame rc a e ra s g an a olor. (�At. s'a veC"t w I) Install cap shingle to the peak of the roof. Clean and secure gutters. rr J) Clean allgroundr and use rolling magnet to pick up any loose nails. �Tf1b The total investment amount for the above project is$6,750.00 Payment is due upon completion. This is a 1 day project and I can have it completed as soon asyou are ready. Please call me with any questions ere' E s h a �6wski 10 YEAR LEA ONALL LAB�Df R