Loading...
2 Chestnut St - C of A - chimney cap Date Stamp RECEIVED a' AUG 07 2018 . DE PT. OF PLANNING & Salem Historical Commission COMMUNITY DEVELOPMENT 120 wASHNG T aN STREET SAi EM,MASSACHUS67TS 01970 For Office Use Only t978;819.5685 Fox'978s 740-0404 APPLICATION FOR A CERTIFICATE OF APPROPRIATENESS Pursuant to the Historic District's Act (M.G.L. Chapter 40C) and the Salem Historical Commission Ordinance, application is hereby made for issuance of a Certificate of Appropriateness for: ❑ New Construction ❑ Moving 0 Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Sign ❑ Other District: ❑Derby Street ❑Lafayette Street ❑✓ McIntire ❑Washington Square Address of Property: 2 Chestnut Street Salem MA 01970 p - - - Name of Record Owner(s): William Raye,Edward Jacobs,David Salanis,Patricia Russo,David Russo Owner Mailing Address: 2 Chestnut Street Salem MA 01970 Description of Work Proposed Please type or przrnt clearly.Attach additional sheets, as necessary. 1.New Asphalt Shingle Roof on Main part of the house. The shingles will match original Shingle 3- Tab 2.New Rubber Roof on back part of the house- (Will match what is already there) 3.New Chimney Remove the chimney from the roof top; Rebuild new chimney with new bricks matching the original. Repoint new chimney with a mix of 5 sand, 1 light dragon and 1/2 lime. Install new fuel in the chimney; Install new chimney cap; Wash with magic masonry detergent. (Brick will match what is originally there) All of the work we are having done is "in kind", and matches the existing in terms of design, materials, dimensions, color and outward appearance. Name of Applicant-,William Raye [E Owner❑Contractor❑Tenant❑Other: Signature: Date:August 7,2018 Tel. #: 617-953-7959 E-mail Address: William.Raye@raveis.com Certificate will be mailed to the owner unless otherwise indicated here: Certificate should be mailed to: Name Mailing address: City: State:_Zip: Ms Estimate 8e9w.rz$ w"omy a crow Date Estimate# 100 Stockton St#89 2/12/2018 75 Chelsea,MA, 02150 Name/Address William Raye 2 Chestnut St. Salem,MA,01970 Description Qty Total Install all necessary pipe staging and install debris net to protect the sidewalk; 6,370.00 Scrap the existing asphalt shingle roof; Install new ice water; Install new shingle roof, Install new flashing. Remove the existing rubber roof; 7,525.00 Install new insulation; Install new rubber roof, Install new flashing; Clean up and remove the debris. Remove the chimney from the roof top; 7,820.00 Rebuild new chimney with new bricks; Install new fuel in the chimney; Install new chimney cap; Wash with magic masonry detergent; Repoint small wall from roof overhang. Thank you for your business. Total $21,715.00 • 5 � { 1rt ` :. liii r " y � - �.1 �" °fit+=• -; l 4EA84D1 YI{4ti1 Ef DK - 46 [ ��' gtl/HY1 . r . An i 9 i r r- -r ..1 I Salem Historical Commission 120 WASHINGTON STREET, SALEM,MASSACHUSETTS 01970 (978)619-5685 FAX(978)740-0404 CERTIFICATE OF NON-APPLICABILITY It is hereby certified that the Salem Historical Commission has determined that the proposed: ❑ Construction ❑ Moving ✓ Reconstruction ❑ Alteration ❑ Demolition ❑ Painting ❑ Signage ❑ Other Work as described below does not involve an exterior architectural teature or involves a feature covered by the exemptions or limitations set forth in the Historic District's Act(M.G.L. Ch. 40C) and the Salem Historic Districts Ordinance. District: McIntire Address of Property: 2 Chestnut Street Name of Record Owner: William Raye, Edward Jacobs, David Salanis, Patricia Russo, David Russo Description of Work Proposed: • Replace existing 3 tab shingle roof inkind to match existing color; • Replace existing rubber roof on back ell to match existing; and • Reconstruct chimney from roofline. Reuse existing brick or replace with in-kind brick to match color, dimension, bond pattern, and outward appearance. Mortar to be type N mortar: 11116 mix (Portland cement, hydrated lime and sand) to match existing color, grain size, texture and pointing technique. NOTE: Request to install new chimn_ev c_at?_will be considered at the Commission meeting,; on September 5,2018. - There will be no changes in color, material, design, location or outward appearance. Non-applicable due to being in-kind repair. Upon completion of above work,please notify Historical Commission staff as final sign-off is required to document compliance with this Certificate and approved plans. Dated: August 16 2018 COMMISSION :71STORICAL �. The homeowner has the option not to commence the work(unless it relates to resolving an outstanding violation). All work commenced must be completed within one year from this date unless otherwise indicated. THIS IS NOT A BUILDING PERMIT. Please be sure to obtain the appropriate permits from the Inspector of Buildings (or any other necessary permits or approvals)prior to commencing work.