Loading...
20 COMMERCIAL STREET - PROPERTY CARD DATE OF PERMIT PERMIT No. OWNER LOCATION ,()iP 6/ 10/59 I 11171 JOHN F. KAISER CO. I 20 COMMERCIAL STREET �J STRUCTURE MATERIAL DIMENSIONS No.OF STORIES No:OF FAMILIES WARD COST $ 15,000 BUILDER C.H. CARLSON Ist 100x32' metal bldg for office & leather processing) BOARD OF APPEAL-RANTED WITH CONDITIONS-3/ 17/69-Variance to erect addition to existing fabricating shop (Owner-Salem Welded products Co. ) BOARD OF APPEAL-GRANTED-9/30/69-Variance to erect addition to existing building on under size lot with insufficient side and rear yard setbacks. 7/9/71-11244 (Owner-D.P. D'Aprile) Erect addition to existing structure to be used for a welding and Metal smith shop ($ 16,000) BOARD OF APPEAL-GRANTED-8/ 16/77-Variance to Jeannette Realty Trust Addition 9/21/77 11401 (Owner-Jeantte Realty Trust) Add to present building: increase storage area and install new office space. 10/26/78 BOARD OF APPEAL-DENIED-Petition submitted by Bergeron Bath &Kitchen seeking a sign permit to allow installation of a 30'x3' sin flush against the building 9/24/79 11411 (Owner Jeannette Realty Trust) Ereect 9'x8' free standing sign. 6/8/82 11197 Erect 8'x8' sign BOARD OF APPEAL-GRANTED-9/29/82-Variance for petition for side & rear yard density to erect an addition. (Certificate of Occupancy Issued-Retail and Manufacturing 4/ 18/80) UUc� 2/25/93 453-93 Alterations tooffice & stock room cost $2,763. fee $23.00 (OWNER -PETER G. HOLLAND) L.E.T. 1153-93 Inspected & Approved by L.E.T. BOARD OF%APPEAL: 11/17/99 - GRANTED - SPECIAL PERMIT Under section 9-4 to allow a change from one nonconforming use to another (Veteinary Office ) BOARD OF APPEAL: 03/21/01 - GRANTED - Variance from front setback and side setback to construct the proposed entryway and side stair tower (Elizabeth Bradt) BOARD OF APPEAL: 11/14/01 - GRANTED , Request for a six (6) month extension of the Special Permit granted in 11/17/99 BOARD OF APPEAL: 3/20/02 - GRANTED - Variance from front,side_ and reari;setback & Variance from buffer zone to allow constuction of a new building and Extension of the Special Permitcgranted for six months