20 COMMERCIAL STREET - PROPERTY CARD DATE OF PERMIT PERMIT No. OWNER LOCATION ,()iP
6/ 10/59 I 11171 JOHN F. KAISER CO. I 20 COMMERCIAL STREET �J
STRUCTURE MATERIAL DIMENSIONS No.OF STORIES No:OF FAMILIES WARD COST
$ 15,000
BUILDER
C.H. CARLSON
Ist 100x32' metal bldg for office & leather processing)
BOARD OF APPEAL-RANTED WITH CONDITIONS-3/ 17/69-Variance to erect addition to existing
fabricating shop (Owner-Salem Welded products Co. )
BOARD OF APPEAL-GRANTED-9/30/69-Variance to erect addition to existing building on under
size lot with insufficient side and rear yard setbacks.
7/9/71-11244 (Owner-D.P. D'Aprile) Erect addition to existing structure to be used for a
welding and Metal smith shop ($ 16,000)
BOARD OF APPEAL-GRANTED-8/ 16/77-Variance to Jeannette Realty Trust Addition
9/21/77 11401 (Owner-Jeantte Realty Trust) Add to present building: increase storage area
and install new office space.
10/26/78 BOARD OF APPEAL-DENIED-Petition submitted by Bergeron Bath &Kitchen seeking a
sign permit to allow installation of a 30'x3' sin flush against the building
9/24/79 11411 (Owner Jeannette Realty Trust) Ereect 9'x8' free standing sign.
6/8/82 11197 Erect 8'x8' sign
BOARD OF APPEAL-GRANTED-9/29/82-Variance for petition for side & rear yard density to erect
an addition. (Certificate of Occupancy Issued-Retail and Manufacturing 4/ 18/80)
UUc�
2/25/93 453-93 Alterations tooffice & stock room cost $2,763. fee $23.00
(OWNER -PETER G. HOLLAND) L.E.T.
1153-93 Inspected & Approved by L.E.T.
BOARD OF%APPEAL: 11/17/99 - GRANTED - SPECIAL PERMIT Under section 9-4 to allow a change
from one nonconforming use to another (Veteinary Office )
BOARD OF APPEAL: 03/21/01 - GRANTED - Variance from front setback and side setback to
construct the proposed entryway and side stair tower (Elizabeth Bradt)
BOARD OF APPEAL: 11/14/01 - GRANTED , Request for a six (6) month extension of the
Special Permit granted in 11/17/99
BOARD OF APPEAL: 3/20/02 - GRANTED - Variance from front,side_ and reari;setback & Variance
from buffer zone to allow constuction of a new building and Extension
of the Special Permitcgranted for six months