Loading...
254 CANAL STREET - PROPERTY CARD J DATE OF PERMIT PERMIT No. OWNER' LOCATION 4132-0060 1 2/2/72 #29 Gardner Mattress I 254 Canal Street STRUCTURE MATERIAL DIMENSIONS No. OF STORIES No.OF FAMILIES WARD I COST BUILDER Install sign 21x81x6 lighted mounted flush against building 4/18/74 #91 Put post from floor to ceiling,scab new floor joist,re-form opening,replan any bearding where needed fire damage. 7/14/76 #266 Reside (3) sides of factory with masonite siding,new gutters,new fascia boards and new windows. 8/21/90 #435-90 Reroof. J.S. Est. 6,050.-fee 20. 1 /7/91 117-91 Repair fire-damage to existing building , cost $30 , 000 . fee$1_'8'5 . 00 ( Inspector James Santo) (Over) BOARD OF APPEAL: 10/16/96 - GRANTED - Petition of Gardner Mattress requesting a Variance from lot area, front yard, side yard and rear setbacks to allow construction of a new warehousing/manufactruing facility. 1/7/97 419-97 Demolish condemned storage building,,. �AddressrPeraAs`sessor:est. 3500. fee 29. L.T 1/17/97 /139-97 ,Installfoundationionly:as-per plans<25'2=Cana7l'ZSt: est. 19,000 fee 120. 3,/5,/_9.7, L.T. 9/19/97 CERTIFICATE OF OCCUPANCY ISSUED, ON PERMIT #108-97. K.G.G. BOARD OF APPEAL: 5/20/98 - GRANTED - Variance on rear setback to allow new enclosure of a loading dock for Gardner Mattress 9/24/98 FOUNDATION ONLY. est. 15,000.00 fee 95.00 T.J.S. 11/25/98 111040-98 ERECT STEEL CONNECTOR PER PLANS SUBMITTED. est. 15,000.00 fee 95.00 T.J.S. 2/17/00 #1013-00 ALTERATIONS TO 1ST FLOOR PER PLANS SUBMITTED. est. 14,000.00 fee 145.00 FRD 9/25/00 #198-00 HANDICAP RAMP/EMPLOYEE ENTRANCE. PLANS SUBMITTED. est. 12,000.00 fee 120.00 fee t.j .s.