Keolis 2021 Yearly Operational Plan Keolis Commuter Services 2021 Yearly Operational Plan, prepared in accordance with the Massachusetts
Rights-of-Way Management Regulations (333 CMR 11.00), can be found at:
FDCErailroadvegetation.com RECEIVED
t� KEOLIS Commuter Services
==* Environmental Monitor Notice APR 21 2021
mmo, 2021 Yearly Operational Plan
mm* "YOUR MUNICIPALITY' CITY OF SALEM
==* Right-of-Way Maps BOARD OF HEALTH
The Integrated Vegetation Management activities proposed in the 2021 Yearly Operational Plan (YOP) for the
Commuter Rail includes both mechanical and chemical controls. The mechanical controls (brush and tree
clearing, trimming, removal), stump and basal treatments, vegetation clearing from Right-of-Way track drainage
ditches, post emergent (non-sensitive areas) and touch up of herbicide is scheduled throughout the year. The
ROW pre-emergent chemical application is scheduled weather depending from May 1 through June 30, 2021.
The Right-of-Way (ROW) Maps for each city/town reflect the herbicide application zones approved through the
five-year Vegetation Management Plan permit issued for 2021-2025. The identification on the maps of private
drinking water supply wells remains an ongoing process. Please notify Fair Dermody Consulting Engineers,
Keolis, and the Department of Agricultural Resources of any omissions and or new private drinking
water supply wells.
Please review your mailing address and the ten-digit police department emergency telephone number listed in
the Plan and notify us of any revisions. Hard copies of all documents are available upon request, please email
Matt@FDCEngineers.com.
EM
`Fair Dermody Consulting Engineers $5.86 US POSTAGE19 OCEAN AVE UNIT 5 FIRST-CLASSPORTLAND ME 04103-5745 Apr 192021USPS CERTIFIED MAIL Mailed from ZIP 04103
1 oz First-Class Mail Letter N
+1923275
062SO012913542
9414 8118 9876 5896 7295 58
Salem Board of Health
120 WASHINGTON ST
SALEM MA 01970-3545
I'I'�IIIII'lll'lllllllllllll'III'I'll�ll�111l1lllll'IIII'IIIIJill