BOA_2 Howard Street - Decision (Stamped) :. CITY OF SALEM, MASSACHUSETTS
BOARD OF APPEALS
98 WASHINGTON STREET♦ SALEM,MASSACHUSETTS 01970
TEL:978-619-5685
KIMBERLEY DRISCOLL
MAYOR (nrn
�,
r-
February 1, 2021 M-< ,
Decision
City of Salem Board of Appeals `1' `-°
ca
Petition of OCELOT OPERATIONS, LLC for a special permit per Section 3.3.3
Nonconforming Structures of the Salem Zoning Ordinance from maximum height of
buildings (stories) to expand an existing,nonconforming multifamily dwelling at 2
HOWARD STREET (Map 35,Lot 153) (R2 Zoning District).
A public hearing on the above Petition was opened on January 20,2021 pursuant to M.G.L Ch.
40A, 5 11 and closed on that date with the following Zoning Board of Appeals members present:
Mike Duffy (Chair),Rosa Ordaz, Paul Viccica, Carly McClain (Alternate),and Steven Smalley
(Alternate).
The petitioner seeks to expand an existing,nonconforming multifamily dwelling by extending the third
story.
Statements of Fact:
1. In the petition date-stamped December 22,2020, the petitioner requested a special permit
per Section 3.3.3 Nonconforming Structures to, "add an addition at the third story to create
larger units on that level'.
2. 2 Howard Street is owned by Ocelot Operations,LLC.The petitioner was represented by
Sanir Lutfija of Seger Architects,LLC,and Mike Becker.
3. 2 Howard Street is a multifamily dwelling located in the Residential Two-Family (R2) zoning
district.
4. The property is nonconforming to dimensional requirements including at least minimum
depth of rear yard.
5. Multifamily Dwelling is a nonconforming use in the Residential Two-Family (R2) zoning
district.
6. The proposal is to extend the third story to create larger units on that story.The extension
will be located on the rear of the building if looking at the building from Howard Street. The
existing structure is three stories, and the proposed extension would not increase the current
height in feet or height in stories.
7. In the petition date-stamped December 22, 2020,the petitioner writes that the proposed
extension,"will not be exceeding the current height and number of stories," and the
extension "will not extend past the existing footprint and will align new walls vertically".
City of Salem Board of Appeals
February 1,2021
Project:2 Howard Street
Page 2 of 3
8. Due to the ongoing COVID-19 pandemic and related precautions and Governor Baker's
March 12, 2020 Order Suspending Certain Provisions of the Open Meeting Law, G.L. c.
30A, §18,and the Governor's March 15, 2020 Order imposing strict limitations on the
number of people that may gather in one place,the January 20, 2020 meeting of the Board
of Appeals was held remotely,via the online platform Zoom.
9. At the January 20,2020 public hearing,representatives Sanir Lutfija and Mike Becker
discussed the proposal. Mr. Lutfija described how the proposed extension would be built on
top of an existing portion of the structure that was an addition constructed around 1900. He
explains the proposal it to expand existing units, and the extension will not exceed the
existing footprint or height. Mr. Lutfija stated the building provides the city with affordable
units,and the extension will include some life safety improvements. He explained the
addition would expand existing units, facilitating egress for both units on the third floor. The
exterior of the proposed extension would match the existing structure. Mr. Lutfija and Mr.
Becker emphasized the undesirable conditions of the existing third floor units and stated the
proposal would expand those units and relieve those conditions.
10. Mr.Viccica asked for details on what would go in the interior space created by this
extension.The plans provided with the original application do not show any details for the
interior of the extension. Mr. Becker acknowledged that there is not a final plan for the
interior space. He reiterated that it will be used to expand existing units.
11. At the January 20, 2021 public hearing,no (0) members of the public spoke in favor of or in
opposition to the petition.
12. At the January 20,2021 public hearing there were no other questions from the Board.
13. At the January 20,2021 public hearing, Chair Duffy discussed how the proposal meets the
criteria for special permit (as noted below).
The Salem Board of Appeals, after careful consideration of the evidence presented at the public
hearings, and after thorough review of the petition, including the application narrative and plans,
makes the following findings that the proposed project meets the provisions of the City of Salem
Zoning Ordinance:
Special Permit Findings:
The Board finds that the proposed modifications will not be substantially more detrimental than the
existing nonconforming structure to the neighborhood:
1. Social, economic, or community needs are served by this proposal: The current structure
provides low-income housing in the downtown area. The proposed addition would improve
the existing units.
2. Traffic flow and safety, including parking and loading: The number of units and bedrooms
will not increase, so there are no expected negative impacts.
3. Adequate utilities and other public services already service the structure.
4. Impacts on the natural environment,including drainage: No negative impact is expected.
5. Neighborhood character:The project is in keeping with the neighborhood character and is in
keeping with the existing building.
City of Salem Board of Appeals
February 1,2021
Project:2 Howard Street
Page 3 of 3
6. Potential fiscal impact,including impact on City tax base and employment:There is a potential
positive fiscal impact, including enhancing the City's tax base by improving these existing
units.
On the basis of the above statements of fact and findings, the Salem Board of Appeals voted five (5)
in favor (Paul Viccica,Steven Smalley, Carley McClain,Mike Duffy (Chair), and Rosa Ordaz) and
none (0) opposed to grant to Ocelot Operations,LLC a special permit per Section 3.3.3
Nonconforming Structures of the Salem Zoning Ordinance from maximum height of buildings (stories)
to expand an existing,nonconforming multifamily dwelling at 2 Howard Street, subject to the
following terms, conditions, and safeguards:
Standard Conditions:
1. Petitioner shall comply with all city and state statutes, ordinances,codes and regulations.
2. All construction shall be done as per the plans and dimensions submitted to and approved
by the building commissioner.
3. All requirements of the Salem Fire Department relative to smoke and fire safety shall be
strictly adhered to.
4. Petitioner shall obtain a building permit prior to beginning any construction.
5. Exterior finishes of the new construction shall be in harmony with the existing structure.
6. Certificate of Occupancy is to be obtained.
7. Petitioner is to obtain approval from any City Board or Commission having jurisdiction
including, but not limited to, the Planning Board.
8. All construction shall be done per the plans and dimensions, submitted to and approved by
this Board, as amended. No change,extension,material corrections,additions, substitutions,
alterations,and/or modification to an approval by this Board shall be permitted without the
approval of this Board,unless such change has been deemed a minor field change by the
Building Commissioner in consultation with the Chair of the Board of Appeals.
7;pk Ea44 / /-N
Mike Duffy, C
Board of Appeals
A COPY OF THIS DECISION HAS BEEN FILED WITH THE PLANNING BOARD AND THE CITY CLERK.
Appeal from this decision,if any, shall be made pursuant to Section 17 of the Massachusetts General
Laws Chapter 40A, and shall be filed within 20 days of filing of this decision in the office of the City
Clerk. Pursuant to the Massachusetts General Laws Chapter 40A, Section 11,the Variance or Special
Permit granted herein shall not take effect until a copy of the decision bearing the certificate of the
City Clerk has been filed with the Essex South Registry of Deeds.