Loading...
CONS. CONT. PROGRESS CHECKLIST 02/12/2021 Construction Control Progress Checklist } Alf To be submitted at completion of required site reviews for �l r' �; a construction progress per the 9th edition of the • Massachusetts State Building Code,780 CMR,Section 107 Project Title: 65 Washington Street,4th and 5th Floors Date: February 12,2021 Property Address: 65 Washington Street,4th and 5th Floors,Salem,MA I,Eric A.Cummings, MA Registration Number: 53348 Expiration date:6/22 am a registered design professional and I or my designee have observed the following work,and to the best of my knowledge,information,and belief the construction work indicated below has been performed in a manner consistent with the approved plans and specifications: Required Site Review and Documentation for Portions or Phases Construction'6 (to be performed by the appropriate registered designprofessional or his/her designee or M.G.L.c 112§81R contractor) Site Review and Documentation X Site Review and Documentation X Soil condition and analysis Energy Efficiency Requirements Footing and Foundation,including Reinforcement and Z Foundation attachment Fire AlarmInstallation Concrete Floor and Under Floor Fire Suppression Installation Lowest Floor Flood Elevation Field Reports Structural Frame—wall/floor/roof Carbon Monoxide Detection System' Lath and Plaster/Gypsum Seismic reinforcement Fire Resistant Wall/Partitions framing Smoke Control Systems(Special Inspection per Sections 909.3 and 909.18,8) Fire Resistant Wall/Partitions finish attachments Smoke and Heat Vents Above Ceiling inspection Accessibility(521 CMR) Fire Blocking/Stopping System Other: Plumbing-Sovent Systemfor dth and 5th floors Only Emergency Lighting/Exit Signage Means of Egress Componenets Special Inspections(Section 1704): Roofmg,coping/System Venting Systems(kitchen and cleanouts,chemical,fume) Mechanical Systems 1.Indicate with an'x'the work you reviewed for compliance with the approved plans and specifications and describe in detail below. 2.Include NFPA 72 test and acceptance documentation 3.Include applicable NFPA 13,13R,13D,14,15,17,20,241,etc.-test and acceptance documentation. 4.Include NFPA 720 Record of Completion and Inspection and Test Form 5.Include field reports and related documentation 6.Nothing contained within construction control shall have the effect of waiving or limiting the building official's authority to enforce this code with respect to examination of the contract documents,including plans,computations and specifications,and field inspections. Description of Construction Work Observed'Sovent system directly conforms to our design drawings. Enter in the space to the right a"wet"or tN OF MgScI electronic signature and seal: �` (73 Ric H Phone number:978 568 2616 Email:cummingseng®comcast.netZ Vt11MIN08 wANIC Building Official Use Only No.53 �p Building Official Name: Date: � ;t FQ , EP �S1W' Version 06 11 2012