BUILDING JACKET_11 DODGE STREET_3/4/2021 6:39:00 PM_AGGREGATE_FILE rrtm• . CITY OF SALEM, MASSACHUSETTS
BUILDING DEPARTMENT
120 WASHINGTON STREET,3RD FLOOR
TEL: 978-745-9595
KIMBERLEY DRISCOLL FAX: 978-740-9846
MAYOR
THOMAS ST.PIERRE
DIRECTOR OF PUBLIC PROPERTIES/BUILDING COMMISSIONER
February 20, 2020
11 Dodge Street
Salem Ma. 01970
To Whom It May Concern
I am granting early start times at 11 Dodge Street to place concrete
The start time will be 4:30 am on the 2 Dates listed .
2/21/20
2/24/20
-titf
Stephen Cummings
Local Building Inspector
(978)-619-5643
GEOPIEFt Geopier Foundation Company
"�" 8 s 165 Taylor Road
Colchester,CT 06415
Tel:(860)531-9137
Cell:(860)373-3542
www.geopier.com
September 17,2018 GNE-00998
Jason Blois
Opechee Construction Corporation
I l Corporate Drive
Belmont,NH 03220
Subject: Geopier Modulus Test Results
Washington at Dodge, Salem,MA
Dear Jason:
This letter transmits the results of our Geopier" modulus test performed at the above referenced project. The test
pier was conducted centered between piers 253 and 254, closest to boring B-107. Test pier installation
characteristics are as follows:
Ground Surface Elevation: El 15.0
Top of pier depth below grade: 2.5 ft.
Pier shaft length: 15.5 ft.
Pier diameter: 25.0 in.average diameter
Number of lifts of 3/4"stone: 18 lifts,total 61.8 CF
Shaft Construction: Pull 47 Push 3'
Ramming Pressure: 180 bars Static,Approximately 140 bars dynamic
Bottom Stabilization Test results 1/8-in.at 16 ft.
A test pier installation log and plot of the test results are attached to this letter. The test results indicate a top of pier
deflection of 0.315 in. and a bottom of pier deflection of 0.031 at the design top-of-Geopier stress of 19.75 ksf. In
addition, test data indicates a Geopier Stiffness Modulus (Kg) of 435 Pei, which exceeds the design Geopier
Stiffness Modulus of 175 pci and thereby indicates acceptable results.
As a result of this test, the piers that have been constructed for the project using the materials and construction
procedures that were used to construct the successful test pier are satisfactory pending review and approval of
Quality Control Records to be submitted shortly. In the meantime, please do not hesitate to contact us if you have
any further questions.
Sincerely,
GEOPIER FOUNDATION COMPANY
Benjamin M.Cote, PE
Region Engineer
Attachment: TP-01 Modulus Test Results
cc: Scott Smith(McPhail Associates,LLC)—via email
Mike Pockoski(Geopier Foundation Co.)—via email
GEOPIEW
--- - - --- - - — - -- - Geopier Foundation Company
Tel�� � 165 Taylor Road
Colchester,CT 06415
Tel:(860)531-9137
Cell:(860)373-3542
www.geopier.com
September 17,2018 GNE-00998
Jason Blais
Opechee Construction Corporation
11 Corporate Drive
Belmont,NH 03220
Subject: Geopier Quality Control Records
Washington at Dodge, Salem,MA
Dear Jason:
This letter transmits our field Quality Control Records for Geopier elements installed at the above referenced
project.Design documents and modulus test data have been forwarded to you previously.
These data indicate that the Geopier elements constructed for the project have been constructed in general
accordance with the requirements included in our Geopier Design submittal, and in a manner consistent with the
materials and procedures that were used to construct the test pier that was tested and found to verify the assumptions
upon which the Geopier Design submittal was based.
Please note that in accordance with the requirements included in our Geopier Design Submittal, the following
information must be submitted to us for our information,review and files:
1. Confirmation from the Geotechnical Representative that all foundation excavation, subgrade preparation,
and subsequent backfill placement was completed in general accordance with the requirements included in
the Geopier Design submittal and other applicable project specification requirements.
Upon receipt of this information, Helical Drilling, Inc. and the Geopier Foundation Company can accept the
responsibility for the performance of the ground support system to be consistent with the design criteria upon which
the Geopier Design Submittal was prepared. As such, we encourage you to provide this outstanding information to
us as soon as possible.
Please don't hesitate to contact us if you have any questions or need further clarifications. Thank you again for
inviting us to work with you on the project.
Sincerely,
GEOPIER FOUNDATION COMPANY
64—
Benjamin M. Cote, PE
Region Engineer
Attachment: Geopier Quality Control Records
cc: Scott Smith(McPhail Associates,LLC)-via email
Mike Pockoski(Geopier Foundation Co.)-via email
g
is
W az
a E
W
as
E bb�
s _ _
UNIAN 9 Nxn n5ry n 999---n 1E2nm# �nrr�A« FPS
a aLNnyn� NN�'vi vinN NFL Nm N..N...
�' o- u4 nug gi Ji f+f+9iaaaem;eaeaannnv mnvrnm n,�ry mr°�N gnav�sa�v
L
�R�r r'ei:v�Nnrvi'.e'dAaeNrlNNrvrv:Nriv v'uio
3
} °F
CQ ug 5�'
CC [
C b b> L
a..vmaa...aeammmmm aavo:
z -$
OU ze $$$$$a$3aaa$$ $aa$$a$a$$$$aann$nnnnnnnnnnnn$$a$aae
J g2 emmnmmbmmmmbn mn nmmmmmnmmnn
Q E E
m4nn
mm�nnmmnmmmnnnmmmm
i -
� _= m r
Ep E.
a i $
I--
m mmmm m mm���sss���ON-- ss �r aa Ea'�a�`a
(7
o''b d mb
� s;g$$$$R$$$av`i$000SSSu4$$$S$iaa$n$'mm�'.R.m RZ�',b2,n�F4S$a$$'d u^dmm Q agso NnnNnNNN�o o'tl d6aaaac
W R- mb0000 mrrnmwmnmmmrrbrnnnbbbbmmmm
bl_ s�aovoob0000'o'e00000000000>0 oaa000 a'o 0000
3O. F' E � S� vm rvNNwo�evoowaaw mNm�rwnmowtirnu
h {aygo 9m RFo:ou'aa
Ca Ep kEi EIS wNNm'm Nr�o^�'Nwaamc�c�n s m'n
G F
LE
W Fm y° �MNNNNyNn�rym o,o,o6 NN�N�N�'.ev m'n NNNN��Oe�'�6
W � 've'eb'6666 o'bd000>6cc m'600'o'oo'e'e 6m'66bn�nbidno666 o'bdecd6d6
5
m v v naaannnnmmmmav4nnvnmbnbmmmnnn
Sms
Z 'E522v on'�uoq nNrmi'co�d�b�ppgg6oeo��NN��v
--------nn uoim uminnubi'n gN�nm a'vmry�'m'ry a'a nm'm'n maor'n uof
i S mu66 m'u =.....-.��.«.
R
2 Nd mn Wubvmi'nn n'nnWuor uo.nNrvrvnaNruoi NN.mvrvrvrvrvrvnNNNv
imiE b000000 mmoboom000mmm 3
g um �%mmme��m.e�tivi uia::::in Nui vi uin
V $mm
E n�vag$a$a$$$$os.sass$$$ssa$a$$$$annnnnammmpn$$aaa$
pNNNnNNNNN�Nppggqbbu mi p
R sy� mu fr
L
«iy j 8¢,ease$$$aaaaaaa$$$$$aaaaaaaa$$asaaasaaaaaa$aaaaa$$$
om
w WE 1XINWM "A
&' rcea rccrceaarcrcrcrcarcaaaa¢a�pprcrcaaaarcrcrc ��
� gm
a g
W A
�p Uq F A
m � sm ¢ mu �ma mm�_o. vrvvmm m mF. ¢¢mmvWN m¢
„PRRnr r,�� Rpgx M.;ftE n��xpAppp
r«(CP x
Sc
Z3LNeudNoa JJ m-'N Nw{N�nNN� ry mOO'N�Nvw
V 6S a��ava$:nnxmmvvmmmm m�i nrmN
L�
baQm 6�m rv' uNnNNNadr3NVN:uni'momni°mi'r rvni r:nNnmi�N
a
Y
K `o Fs zmmF3m.]F«�E7�Ar,'.N^«.�.mo�^ommm��mr�m�mmm°.NNm
N2 EE
3 =dad""'aG��grap2ffiFR2:9�AaSm �22:2:SS:S:ex9aS�F
F _ _
Z $
U iE"ASS ogoS��Rffi�3.A422
}U �$
j
D its
Q a ¢am
s
Cf e
E
a'8v
wvm vvvvvvvvaaaaaaaaavavvavvvvvavvavavvvvavvvvvvvvv r'
a
W omm000000
a. oo o e eeedeeaoo oo
U'
U sE '2222228„288888,888888E 8222222222a 222 aaa 222 aaa 222222
Q d^ edewmNmuee eeeuemmmeemememee���
xI' � �oo 'o'e'o'ea'o'o'o'o`oo"o'o oo oo oo oo o oe 000 R o 0
o o o 0000
e odd., 0
eweem�wme�m.eodrvre'.e
Q "e; ge 8gem
a ip I. mN ---------------
Wm `- .........e.e
LU
O RORReeoo
192 SEE oo888B888882Sx22"mmmoo�0000eoonono o'°e`n`ode
4
y° is
z�Eo
;m � E � ibWmWamiNmrvrvivrvnnR o,R RRo
0
'.....
E �2 � .rvrv�m
i3E o .........o0000000 000mR 000m0000...... oR o Y
m 4Sf WWw om,n:: '::::ddviivvvui Nuiuurow�u�c ro.ro r2 ui vi c:N NviNnNnmwNW'w g
o �
x �
°sm �^ 2222SSS2288888888888oS822m2^^^22^22222222222222222
J c ry V� �§Vm dm6tl66NNN«N�f«���Y��iJY�NNN
Q Z=6 �O yV
w a3a8SIP 88829882 S 8 S S S S 22S 822222 S 2282E S SSSS8S28882222222 LS
♦—»� ow
vr
¢¢Q¢tt¢¢¢¢¢¢¢¢¢¢¢ ¢ ¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢
FFXq 2°4r�,R2 22E22e82� maaam 2xmaaxa2�xax
�XiV ¢Y
W :a
W
$ eorvRS,rRrvR�RRRFnF`Rrvrv« 'R YJRRpAAnnmmmmmmmmFRRR"PnRRR,Cry
a wna.n ssadaa„oh "' RitgW���m3s ^age
v>
z 3m rH��e�
K o�am gp
Q as
to u
O ~ 4�MMMNuiNMMMMifiMMN v a'o..v v v v v rmS rS vm.vi a sao a oed.v v v.vv
Z 3•
i "mmmmmmmmmmmmmm$$$a$$$$$$$$$$$mmmmmmm m mm m$$$o"$$$$
Eb �t�m
W =„s
aE� mmm mmmmmmmmmm bmmmmmmmmm mmmmmm m mmm
F
a a 'aS'a�€'a��a5a'a a�aa'a`aa`a`a�`aaa`a a��aa5�'aaS'a'a�'a'a'a'a as"a`a'a a`aa
W aoo omm000000
'o'eeaeaae.... me'me'o
U
01
a a`n sm '4 NuObWrrn✓m.umina�v'SN SN�goB$8SSm�m$mmmm,S,m.�.�SnM aN iR N$N
m_ a
K� y as $n VWip MNMNN
F jo
aE¢ gg ���m mNNN��vmi vmi'umi'W umi'tiNti
d f9pa ui.........- �NNWr6uMN�ryN.mi'N nM.'v
W
'a
s'0000000000000000000e°eeee'vov0000aoo�oe'o'eooeooe oao
� �as�cecr;cccc«ccssassca$$aa$aeeaaSscmac;e,^,s$aaaass$$
E~SMriN MriNri riM riMMMM66d66�tltltl«<NN«���N
yk E G
3 Cyo wWwrumi'N iNNNN�'n Miumausodbnomn m'uN�i---
_ . ao
______mmm_________________
I
------n'n uivnm -----o �N_�N_ $$S�S$$SS$i S m SSSga mmmS$SSS$SS$$
Nv mNNP' $$$$$ $$$s 8"«'<"< °aa�4�r ¢C¢K ¢¢¢ ¢¢ttKK ¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢¢- dSaaSaa9 CRmRrpaammsmR$ amxmmmmms----------
c
LY
a = z
Gz
g oo a�G
W rvN m 33
p� o0
am �A d o 0 0
ffi & Fg gg
A
nor„£r„R,W 8P88 %idRP„Pr8mm8mR R. E3pRR�RN '.RRRRAFG � ry8„
8
m :rr' r8.. 'mmmwwr:�A�AR�mmmm.wwmRSl .,wRB�'
t�
.22
agQ� m%�mmn�mrym7:mmNmmomam memmaaw�Nm:�,���Nan mmmm
F
Sy pg'"n n�m`maa`m navaannanan�.n�i u�nnnavanNanni voin numi
J 8 �
• a oa o<oa''n v ov'e
Z ow000000000000m000
O Ee $$`w8ossssgg'Rfmmm�"o;m� „8s UMw SSmmt%;8a88
U $6
H
J till,
mmmm mmmm
w ^'
_; 'head ON pig
��������������r���
~ Em asaaaaaaaa`a`aaaaaa'aaaaaaaaaaaaaaaaa'a a'a a'aaaaaa as"a 'a as Q
WA do oomo mmw o0000000000000m000000
� ���o 000eoaoe oe eee ma eoeoddeeeeoeooeeeodoo
C'1
C7 ? £-MM=======^^^^^88888888888888$88888888888R888 888
Q a� riNNeam'w uNro vMrt
� 3 �IfI oow mo oe o mo wo o wo o oo wo oo oo oo oo oe oe
EY 'o yy„� 'e om`m om��m�me oamr9 'g mm
IL Ea =P y� G� �RRRRR RRRR---rva'------nnnNnrvrrrvrvrvrvNnnrvvv ��o
C iK Z
L oy gf
Sd�` ro�mooaoe����w��wvr6u 6uu mmm m'u m'uoi'N uic wuriarvn
W
'a
°w o.e��0000°e>e>oov000:oo
O N6,-$HB8888$8 g mesas saa$$$sssssssamea8 sas
�~ 5NNNNnnNN««�O mmam1�n'w'w m'u gvi ui viN aenn
vi30
L Lg a
f 8 A. mON...
g og og:: .moo oo oo armor
^ E q � mNvin n'a evvvmnnrvrvNNNNvoi'n'
O =
� A000000000aaaa000000aoo ewe
5 3f�RRRRRRRRRRRRRRRRRama�m aam'y RRRRm''o�°mmemmmm`m_re�m _
y jai
E _ ' $000,o,o,o o,o,o,o 000m000000000 S
o00 0000o.o w j
o pp,tlRrRrvrvr^,P,^.R^„^„R�dr£1^.,^.prpCp.c MUMrRaWammmmee�m
A $fr Q v
e Qom �._ R�w nnn^nnnnnnnnn�goo$$$$e�$$$$$$ooeeeeeg$$$$rv•$e 8S$ ¢
amR U' § i4R u6uoLuatlRR«o tlNNdNNNNNNNNNNNNNNNNriNNNNva m�i O$
IM
- u a a s:
«=y � a��ssssas$$$sss$ssssssssammmmsesssxssssas$mmm$ss s$$ '�
W
� w � s� MEN°��4�p333�3°a3°e@444�&443@4�g��g��@4@444"<"<ww384 �e
rca¢aaaaaarcrcarcarcrcprcrcrc¢aarcarcarcrcrcooarca
--- m----------
GEOPIER IMPACT""RAMMED AGGREGATE PIER QUALITY CONTROL SUMMARY G EO PI E R°
HELICRL
ProlMName: Wes"gon at Deep MpeU Use Oevekgnent Hammer: MRZV-20VJ ONE 100998
LecaYan: Salem,MA RI9 Trip. 13H6
Dkc ul.ul8 Rev6lon 1 8R9/8
S.Gralapon W41n.man. heal Mane Mcppet Values 65 of Volume of Measurement 111 Top Goat El.: NA
Groat Mr NA Mancel Olameler 14 in EI Gmul Poll NA
Pkr Gs O's" as",9Yrlsa Mariam P,AapPn Pala Maef hPact So Tep el paalpn AeIUY MYYI WnaMalmMq VYumaa InyMl ROCg6 pCane 3 IVolume.[I Pler MCMnY gangka
NO. Type Cap. Faellnp reses. if BOUompe G Temporal. ... Top 9aan GmN a6M Gmof "a Up Dean AWrepals Time W. 322
HMDfII AbeV! VOIYma.Me M.q PYmee ... %annN .... . Mr.. R.n p,R MnpM.q 6LR La ns "Pri ... atmM Iare A, GraOe et DO,in
199RAP 80 tam 20.019D 15.0 14.p 1.00 DO 5.0 ISO 130 0.0 13.00 0..0 Slimes 3 2 W.0 4.018 95 505 25]200 RAP W t9.t] 20.0 200 15.0 ISO em 00 5.0 19.2 14.2 00 14.t] DO W1Y1018 3 2 NO 4.016 8A 516 25.1"I RAP 80 IS1i NO NO 16.0 ISO ON DO 5.0 19.2 142 0.0 - p0 W13/A10 3 2 G0.0 4.0t5 ].9 521 252
M RAP W 19.1i 210 20.0 t&0 15.0 0.83 OD 6.0 19.2 1A2 00 14,1] 0.0 WIWDIS 3 2 SOO 401] S3 5D] 24.9
Zol RAP 80 t9.W 21.0 20.D 16.0 ISO 033 0.0 5.0 19] 14) DO 146] DO 9I1YN18 3 2 W.0 4.0li 9.0 510 2&02M OEL ONYetlin DezNisNO RAP 80 199 22.0 WD 1&0 R0 1,60 0.0 6.0 195 9 -FO0.0 13t] 00 &tY2p18 3 2 35D 4.0t) 8.] 513 25.92W RA➢ 80 1950 21D WO 120 9.0 150 0.0 Its NO 95 DO ON 00 WWD18 3 2 35.0 AO0 28 322 243
A]RAP 80 20.Cp 2t0 20o tOD 9.0 p.0a 0.0 HO 20,0 9p 00 9C0 0.0 W1Y1p18 J 2 35.0 AO9 14 316 2S4
2DO RAP 60 19.9 nO NO 15.0 UO 1,83 00 ]0 19.2 122 0.D 121] 00 9139D18 3 2 WO 0.D19 1p.0 50..0 26.5209 RAP 00 ISOO 14.0 14S 120 120 0.D0 0.0 2.0 140 120 OD 1200 00 WIWD18 4 2 `5DO 5.020 IDS 39.524.8210 RAP 80 15 W AO 140 12.0 lZD Ow DO 2.0 14.0 12D 0.0 1200 00 WIM018 4 2 W.0 5019 9.i 40.3 24.8
211 RAP 8o t5W 14.0 140 11.0 11.0 0.00 OD 3.0 14.0 11D DO 11.00 0.0 WIMO18 4 2 W.0 502D 9.8 40.2 2&9
212 RAP 8015.W ND . III 110 .. DD 30 14.0 11D 0.0 1100 DO 9/1mes 4 2 NO 5.01] i.8 422 2&5
213 RAP 60 15.W ISO 140 I10 8.0 00) DO 6.0 14.0 8.0 0.0 1100 0.0 910.2018 4 2 35.0 50 40 12 42 30.0 ME ENre acme ad conditions S 4.R.I.I
214 RAP 80 15 W ISO 14.0 11.0 7.0 0.a0 D.0 7.0 14.0 ].0 DO 11.00 DO Solmul8 4 2 35.0 5.0 50 11 4.2 30.8 28.4 Repot
215 RAP BO 15W ISO 14.0 110 1Do 000 DO 40 140 10D 0.0 I1.00 00 W1M1018 4 2 35.0 40 49 a 29 32.1 24.3 837:0 9'CST,0 10'
216 RAP 00 ism t50 tlp 10.0 90 O.W 0.0 5.0 14.0 90 DO 10..00 0.0 9/t00018 4 2 35.0 4.0 48 IS 35 31.5 25.3
29 RAP 80 i5W 14.0 14.0 120 120 Om 0.0 2.0 140 120 0.0 1200 DO 9/]ROtB 4 2 50.0 20 5O 19 7.2 428 E.S CST 12'
218 RAP 80 i5W 140 14.D 110 11.0 O.W 00 30 W.0 11.0 00 11A0 0.0 9/1201. 4 2 40.0 40 45 15 46 35.4 24.3 Pisa ran S9'.
219 RAP BO i5W 14.0 rail 110 110 0GO DO 30 14.0 110 00. 11,W 0.0 99=18 4 3 W.0 40 $2 19 28 522 29.5 ROT:O 10'CST:O t1'PeRmmanceteM
2A RAP BO t5W 140 14.0 10.0 100 000 0.0 4.0 14.0 100 0.0 tO.W 0.0 91R018 0 3 WD 10 52 1B ],4 426 2&D
VI RAP 80 i5W 140 14,0 100 100 Due 0.0 4.0 W.0 100 0.0 l0.W 0.0 9O/N18 3 2 NO 3.0 54 21 9.3 40.7 2i.3
WRAP 00 15W ISO 140 10.0 9.0 D0 0.0 50 14.0 SO DO 10.W 0.0 912018 4 2 ADS 10 43 15 42 35.8 NO Oeme M 3.B.".Petlarmance lal
22J RAP W 15.W 15.0 140 100 7.0 600 0.0 70 14.0 i.p Do oW 0.0 M2018 4 2 40.0 3.0 52 9 7.0 33.0 294 EMreme creme 9'.Bolnd ReM1YN
nal RAP 80 1SW 150 1A0 MID 9.0 DO 00 5.0 14.0 OD 00 10.W 00 9tWM18 4 2 35.0 40 49 8 2.9 321 256
2lS RAP W 150p 15.0 140 10.0 9.0 DO 0.0 5.0 t4.p 90 0.0 tOW 0.0 9t62018 4 2 35.0 40 49 9 3.3 31] 25.4 BST:O 6L6T:p 9
236 RAP W 1500 15.0 140 9.0 10.0 D00 0.0 4.0 RO 10.0 0.0 900 00 9/I2018 4 2 400 40 50 15 5.7 34.3 25.1 89T:0 6PUMa Dan 69.Pea0rmance kM
227RAP m ism 15.0 14.0 8.0 7.0 D
O0.0 ]0 14.0 i.D 0.0 BW 00 9/I2018 4 3 NO 10 W 22 12.0 380 31.5
me RAP SO 15.00 ISO 140 00 i.0 0.0 )0 140 ]0 00 ON 0.0 9I2018 4 3 NO 10 62 22 12.8 37.2 31.2 EST,0 6 CST.D TPerfamaxe lent
zie Al,R SO 15W 15.0 14.0 8.0 7.0 DOD0.0 7.0 14.0 7.0 00 aSO 0.D 912018 3 2 NO 10 52 20 S2 410 33A
230 RAP W 15,00 150 14.0 8.0 70 0.0 7.0 140 TO 0.0 BW 00 WQ018 4 2 NO 30 52 20 03 410 33.1
231 RAP W 15.00 1&0 W,0 0.0 6.0 0.0 8.0 14.0 6.0 00 O.W DO 9fl/N18 4 2 400 30 52 19 7.0 322 31A Rental.Filrtmel aeustl2
232 RAP W 15.00 15.0 14,0 0.0 7.0 0.p ].0 t4.0 TO 00 B.W 0.0 WtW201B 4 2 350 0.p 55 14 BA 2&6 ZL9
233 RAP SO ISM 150 140 ]0 &0 00 80 14.0 &0 00 TOO DO 9iWN10 4 3 350 4.0 58 16 8.2 28,8 286
234 RAP 80 15.W 16.0 14.0 7.0 50 00 9.0 t4.0 5.0 0.0 &W DO Oil 10 4 2 350 AD 50 16 82 280 314
235 RAP 80 15.00 ISO 14.0 20 6,0 0.0 80 14.0 6..0 0.0 BW 0.D W10.2018 4 2 350 0.D 55 14 6.4 288 29.6
235 RAP 00 13.58 16D 12.0 90 5.0 00 TO t2D 5o DO 658 DO 910.2010 4 2 35.0 10 W 21 115 235 29.4
237RAP SO 1358 ISO 12.0 9.0 SO OD Tp f2D 5.0 0..0 6.58 OD W10.2at6 4 3 36..0 10 59 22 11.6 214 29.3
23e RAP SO lase 160 12.0 9.0 3.0 0.p 9O In 30 0.0 8.58 DO W102018 4 2 $5.0 10 W 21 ME 23.5 37.9 Relual
239 RAP 00 1150 16D 12.0 9.0 50 OD 7.0 12O 5O 0.0 8.58 0.0 W10.Rp10 4 2 35.0 30 W 19 10.4 M.8 30.1
240 RAP SO 13.50 ISO t20 90 40 OD 8D 12D 4.0 D.O 650 OD W10120i8 0 2 35.0 30 59 20 tO5 245 33.5 Relual
241 RPP W 13.SS ISO 12.0 9.0 3.0 DO SO 12O 3.0 0.0 6.50 OD W10.2010 4 3 35,0 3.0 W 21 11.5 215 3].9
M2 RAP SO t3.5S 16.0 R.0 9.0 3.0 OD 9.0 12O 3.0 0.0 See DO WiW20i8 4 3 35.0 IS W 19 104 HB US
243 RAP SO 13.50 16.0 12.0 9.0 3D 00 90 120 30 0.0 See; OD Wf62010 4 2 ]5.0 4.0 80 30 10.9 N.1 30.4 Relual
249 RAP W t358 160 12.0 8.0 4.D Op Bp 12D 4.0 0.0 6.Y 0.p Wf0.2pt8 4 3 ]5.0 30 W 25 13.8 2tA 31.3 Relual
245 RAP 00 1358 180 12.0 9.0 5.0 t42 Op Tp f2D 5.0 0.0 6.58 0.0 W10.2018 4 2 35.0 30 Si 20 9.8 25,3 3D4
ME RAP W 13.58 1&0 12.0 80 30 t42 00 9.p 120 3.0 0.0 8.58 0.0 9/1WNt8 4 2 35.0 10 W 20 10.9 2U 38.4 Relual
247 RAP 80 13.58 1&O 12.0 9.0 3.0 142 O.p 9p 120 3.0 0.0 6.50 0.0 W10.20t0 4 2 35.0 20 59 20 10.5 215 30] Relual
248 RAP W i8W 15.0 15.0 1)0 23.0 O.W 00 -90 15p 23.0 p.0 1).W 0.D W1220i8 4 2 ]00 40 5) 3 15 6R5 23.4 9aM maMrel meraM
ONE Drum,Duane RapmaenMlVe OwmYs Uually Assurance Rapn nameless
Tom ft...IHOII Pape 5 of]
Dylan LocYe IMCPRaII Aaaoclatesl
gWN a��m �d" -3m nn nn-o.Jkk ddduk- kttos a " -a =
AAALyyAmA u mNsuu� u AAAAAAAAAAAA AAA aR
30 8$$$bbgbb'ZBb86bb8$b�$�$g�b'°gBb�Bgb$b88�Bb8BbbbB t BI $ { r
dz ssssssssssssssssssssssssssssssssssssssssssssssssss:;Y nJI
fIy
�.f
p p w pxy m
oe_ NAL 000oAo'p'wg'.'p'm p'9;,'w'mm,'w,'a,'m,'m m m'm'y.,'m,a 'p,'m , A' 0� �P o3? r
-$$$$8$$88$e$oo' 08888888$8$$$$888888$=3 m>
.
zoxe ti 2a8 u m e e e;ma eee e m e��Za��a� �H Z; oaa�.ZA au ao >e
'3 9
'+tiU Z9'''o � En t
a E_Sy 3
i
p pcppgw;
s 8888888888�8888888888888888888888888e8'88o008888$8S= °� O
aga m
oolg
e �
p ypmu-1m nanauuuuuwNuunuuun+Nu Ia •A
o Obo'000 'o bbobbbbbb000000003-
o tg8' c�'°'m'm'umu'u z'n udum'm uw,'u y'n,'u,o'u u,m mm,.'nu'u'u,'u.�'nuuTv jR y3 y o bccbobabee 3S- 8n 0
8 4 wY i,'a no NVu'','n n"s ' Pi qn '�GN
oppopooa0000 opo oo oo0 00000fsol Ids; O< m
00000000e000o00000000000eo000000000............0... =ry O
N u,'w P u'm'u='A,-'a','w,�'i'n w'u'u'a,-'i u i+'u�'o'n'u'a'n'u W,'n,'o i,'n j a P P ,-' P,'u P�v'm'n'u,'u,�'i •p D
��$$$$$$$$$$$$eo$$$o$$$$$$$$$$$O'$$$$$$$$$$$$$$$$;=a8
X
o p0000"o oppopo eg� A
m
D
OWN
a D
Na r
b8 O
$�Sffi$$so SSeffi$oo8���8ae$�$am $��l6$S$00000000000$s•j� O
rE Z
»co.eseveosoes000p.ova 7J
=s1c O
- = r
$s�'eommo 9�'�'9���m®$9o;e oai9 w9o;=mN�giPo s C
33 3
3
�3 <
m�p��mppop�..o„pe;pm wpm owNpm.oump g�`e
3
4
NN <
P�m�Pimn>±>±NNo» SI"snpoomo�)�°PA+ +i.u...o u a.WNNk:C,L°'j Eg
$
7 Wtl��H�N:xppY��2M�d�����Bt�tza�tl����xuseveaxea���.:Np'-a �
:dNA sA
¢ _ o
a y:
3y
9
i A
mm
na m
GEOPIER°
a GEOPIER IMPACT°4 RAMMED AGGREGATE PIER QUALITY CONTROL SUMMARY
HELICRL
protectNama: WasONbWn at Dc00e Mixed Use 0w ,mra Hammer: MRZV-2
,Location: spier,MA RI9 Type. M6 GNE i fiPo30
Date: M1NN18 Rmflm 1 e 18
stone GrWaBon W4 ln.unilmmamehad Gone Hopper Volume 650 Volume a/MeasurameM 1ct Top GIaN EI. NA
Grout NA MaMrtI D'nmeler 1qm Est Grin Rred NA
Plar pes, ENlnn Orounq 8m12a MenOM 0.nNrNbn Me Fnpml FpM FnOM TOp el 0.elpn AWY popen rNnOnl BinYaR yyMma el InaW11 flxFS II DOm $OII VOIYme.tl PtM XnminY RamprYa
NO. Tyq Cap. iool6p EMVNMn,R BWemp M,R ie ,R 9oXom TeD 8RM 4KY1 66M 6mM pXe YD 0.vn X9D�ate Tlma BORem HN9M AEOI! VONMI, PNr
tlDa E4R PWnmq ACIm1 ganeeE AeWY plmnM XnluN EI,R p,IL bn ELR L M VpLel. 9imb Blab min qa„M, M. Gretle q DIL.M X9 RAP 00 2S67 23.0 20.0 tD0 ]0 0.00 0.0 13.p 20.0 ].pR 00 10.W 00 9ItYM18 3 2 35.0 0.0 50 fl 12 30.8 20q
300 RV 60 18,00 180 190 tl0 150 000 p.0 40 t8.p00 14M 0.0 9912018 q 3 60,0 4.0 50 tq ].1 529 2Sq 301 RM 00 16M 18.0 18.0 RO 150 OM 0.0 00 180 iq.0 0.0 Koa 0.0 AY)/1018 q 3 60.0 q.0 60 iq ].6 529 Yv.3 302 RA➢ 00 tB.DJ 19.0 190 t50 i5p DM 0.0 45 160 1q.0 00 N.M 0.0 9/tyN18 q J ap.0 90 57 17 04
51,8 25.t M3 RPP 80 16M 190 19.0 15.0 15.0 pM 0.0 00 I- MO 00 MM o.0 9/122016 q J M.o 00 59 15 >.9 521 451 ID9 RM 00 19.1] it0 20.0 150 tq.0 p03 00 60 19,2 132 0.0 131] 00 9/12Y20tB 3 2 M.0 q.0 58 1] 0.] StJ 25.9
335 RM 00 191 21.0 2D0 15.0 MO D&t 0.8 6.0 192 132 0,0 1117 0.0 .1J(1018 3 2 600 a0 60 17 3..3 99,8 26.3
ENE pualN9 Control Raprmen ,,m,
Tom$.as(14D11 Pape]of l Oxnep 3 WYlty Aesuranu RegexMNlva
DYMM LaFe 1McPRNI Asaodalexl
CITY OF SALEM, MASSACHUSETTS
/ ONDi \T ASSESSING DEPARTMENT
93 WASHINGTON STREET
SALEM, MA 01 970
TEL. 978-745-9595
.....D� FAX. 978-744-2069
ASSESSORS@SALEM.COM
MAYOR DIRECTOR
KIMBERLEY DRISCOLL DEBORAH A. JACKSON
BOARD OF ASSESSORS
ROBERT F. MILLERICK
RICHARD W. JAGOLTA, JR,
TINA ZELANO
October 1, 2020
Ilene Simons
City Clerk
City Hall
Salem, MA 01970
Dear Ms. Simons:
RE: new buildings located in a range of numbers of 221-251 Washington
Street and 11 Dodge Street— despite being connected we have 2 cards to
separate out the hotel from the remaining units.
Map 34 Lot 0406
Please be advised that there will be additional addresses for the commercial
spaces due to the combination of 4 lots.
Card 1 is the retail stores on the first level and residential on the upper
levels.
On the residential address front, we have 56 residential units which are as
follows: All at 231 Washington Street with separate units numbers below:
302 401 409 501 509 601 609
304 402 410 502 510 602 610
305 403 411 503 511 603 611
306 404 412 504 512 604 612
310 405 413 505 513 605 613
312 406 414 506 514 606 614
314 407 415 507 515 607 615
316 408 416 508 516 608 616
Commercial units:
221, 223, 225 and 227 Washington Street
Card 2 is The Hampton Hotel is located at 11 Dodge Street
Ve truly yours,
Deborah Jackson
Director of Assessing
Cc: Postmaster
Chief Jerry Guinta, Fire Dept.
Eric Duffy, Water Dept.
Thomas St.Pierre, Building Inspector
Captain Dennis King, Police Dept. 911 Officer
John Giardi , Electrical
Paul Nutting MassGIS notify911address@state.ma.us
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 40CUBIC YARDS:
SET 1 LOCATION:Footing: Line 1 at A.4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M723 4.00 x 8.00 12.57 Good 10/02/18 10/09/18 7 28,000 2,230 1
M724 4 x 8 12.57 Good 10/02/18 10/16/18 14
M725 4 x 8 12.57 Good 10/02/18 10/30/18 28
M726 4 x 8 12.57 Good 10/02/18 10/30/18 28
M727 4 x 8 12.57 Good 10/02/18 10/30/18 28
Slump (in.)5
Air Temp. (F.)55
Conc Temp (F)67
Truck No.1861
Ticket No.9758
Time 9:30
Unit Wt lbs/cu ft
Air Content (%)5.9
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Matthew Hannigan No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
FIELD SUMMARY REPORT
Total Pour:Footing: Line A.4-C
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 40CUBIC YARDS:
SET 1 LOCATION:Footing: Line 1 at A.4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M723 4.00 x 8.00 12.57 Good 10/02/18 10/09/18 7 28,000 2,230 1
M724 4.00 x 8.00 12.57 Good 10/02/18 10/16/18 14 40,000 3,180 1
M725 4 x 8 12.57 Good 10/02/18 10/30/18 28
M726 4 x 8 12.57 Good 10/02/18 10/30/18 28
M727 4 x 8 12.57 Good 10/02/18 10/30/18 28
Slump (in.)5
Air Temp. (F.)55
Conc Temp (F)67
Truck No.1861
Ticket No.9758
Time 9:30
Unit Wt lbs/cu ft
Air Content (%)5.9
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Matthew Hannigan No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
FIELD SUMMARY REPORT
Total Pour:Footing: Line A.4-C
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 40CUBIC YARDS:
SET 1 LOCATION:Footing: Line 1 at A.4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M723 4.00 x 8.00 12.57 Good 10/02/18 10/09/18 7 28,000 2,230 1
M724 4.00 x 8.00 12.57 Good 10/02/18 10/16/18 14 40,000 3,180 1
M725 4.00 x 8.00 12.57 Good 10/02/18 10/30/18 28 51,000 4,060 1
M726 4.00 x 8.00 12.57 Good 10/02/18 10/30/18 28 53,500 4,260 2
M727 4.00 x 8.00 12.57 Good 10/02/18 10/30/18 28 53,000 4,220 1
Slump (in.)5
Air Temp. (F.)55
Conc Temp (F)67
Truck No.1861
Ticket No.9758
Time 9:30
Unit Wt lbs/cu ft
Air Content (%)5.9
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Matthew Hannigan No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018Compressive Strength Report - Concrete
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
FIELD SUMMARY REPORT
Total Pour:Footing: Line A.4-C
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-02-2018
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-03-2018Concrete Field Report
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported one set of cylinders cast on 10/02/2018 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Michael Doucette No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Concrete Plant Report
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan - Wakefield plant
CLASS CONCRETE:3000# 3/8" L/W*CUBIC YARDS:243
Dry Unit of
Weights Quantity Measure Materials Description
Cement 600 lbs./cu.yd.Brand Name LaFarge, type II
Fine Aggregate 1400 lbs./cu.yd.Source Hefferon - Wilmington, MA
Coarse Aggregate 820 lbs./cu.yd.Source Norlite - NY - 3/8" lightweight
Admixture 1.3 ozs./cu.yd.Brand Name W.R. Grace - Darex II
Admixture 33 ozs./cu.yd.Brand Name W.R. Grace - Daracem-55 (MRWR)
Water 30.2 gals/cu.yd.Source Town of Wakefield
Result PLANT GRADATIONSDescription
SAND COARSE AGGREGATEMoisture in Sand (%)3.8
Moisture in Coarse Aggregate (%)13 F. M.2.79 F. M.5.59
ProbeNumber of Determinations Sieve Size % Passing Sieve Size % Passing
YesWeights Adjusted to Compensate for Moisture #200 #8 3.0
OKSand Colormetric Test #100 4.0 #4 38.0
#50 20.0 3/8"100.0
#30 43.0 1/2"100.0
#16 67.0 3/4"100.0
#8 88.0 1"100.0
#4 99.0 1 1/2"
GENERAL REMARKS:*pump with MRWR.
Inspector Premium Travel
Name Time Hours Time
J. Viera No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-06-2019IFC FIRESTOPPING INSPECTION
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:11:30 AM
CONTACT:Jeff Daignault
SUMMARY:
Attached is the IFC firestopping inspection report prepared by UTS inspector Eric McFadden for the
above project.
GENERAL REMARKS:IFC Firestopping Inspection
Inspector Premium Travel
Name Time Hours Time
Eric McFadden No 4.00 .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
UTS of Massachusetts, Inc. Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-06-2019
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-06-2019
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-06-2019
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-06-2019
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-06-2019
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 7
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-06-2019
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 8
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-06-2019
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Reinforcing Steel Report
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:12:00 pm
TIME OF CONCRETE PLACEMENT:1:00 pm
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R-5
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
V-10 - M1 Foundation wall
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Max Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Reinforcing Steel Report
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-25-2019Steel Inspection Report
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:11:30 AM
CONTACT:Jeff Daigneault
SUMMARY:
Attached is the steel inspection report prepared by UTS inspector Tom Harkins for the above project.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
T. Harkins No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
UTS of Massachusetts, Inc. Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-25-2019
Report No.1
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-10-2020Structural Steel Inspection Report
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Jeff Daigneault, OpeecheeContacts:
Description Of Details Inspected:Bolts, welds, studs, deck;
Area Reviewed:Level #3: lines 7 to 27, H to W;
Specification Reference
Contract Drawing Reference GS3.03
05120Project Specification Reference:
Shop Drawing Reference:
Sketch Reference:
AWS D1.1-18Code Reference:
Other:
Inspection Method
X Visual
Other:
Type of Inspection:
Verify:Studs/Deck Bolts/Weld
Status Complete In Process
Qualifications yes
Material Specification yes
Material Grade yes
Material Type yes
Size yes
Length yes
Surface Preparation yes
Coating yes
Spacing yes
Quantity yes
X The details in the above described area(s) were complete/in process at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Marking Method:
GENERAL REMARKS:Studs and decking were complete and in compliance with contract drawings. Welds and
bolts were inaccessible at the time of this inspection due to exterior walls,
interior sheetrock, and fireproofing previously placed.
Inspector Premium Travel
Name Time Hours Time
M. Morelle No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-10-2020Structural Steel Inspection Report
Report No.1
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:1 48CUBIC YARDS:
SET 1 LOCATION:Footing, column line 4 at G
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H402 4.00 x 8.00 12.57 Good 11/15/18 11/22/18 7 31,000 2,470 2
H403 4.00 x 8.00 12.57 Good 11/15/18 11/29/18 14 41,000 3,260 1
H404 4.00 x 8.00 12.57 Good 11/15/18 12/13/18 28 54,500 4,340 1
H405 4.00 x 8.00 12.57 Good 11/15/18 12/13/18 28 57,500 4,570 2
H406 4.00 x 8.00 12.57 Good 11/15/18 12/13/18 28 56,000 4,460 2
Slump (in.)4 1/2
Air Temp. (F.)45
Conc Temp (F)67
Truck No.241
Ticket No.027594
Time 1:45
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR; Cylinders received on 11/20/2018.
Inspector Premium Travel
Name Time Hours Time
Jason Clark No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines 4 at E-U, D3-G at 2-16
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018
Report No.10
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:1 48CUBIC YARDS:
SET 1 LOCATION:Footing, column line 4 at G
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H402 4.00 x 8.00 12.57 Good 11/15/18 11/22/18 7 31,000 2,470 2
H403 4.00 x 8.00 12.57 Good 11/15/18 11/29/18 14 41,000 3,260 1
H404 4 x 8 12.57 Good 11/15/18 12/13/18 28
H405 4 x 8 12.57 Good 11/15/18 12/13/18 28
H406 4 x 8 12.57 Good 11/15/18 12/13/18 28
Slump (in.)4 1/2
Air Temp. (F.)45
Conc Temp (F)67
Truck No.241
Ticket No.027594
Time 1:45
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR; Cylinders received on 11/20/2018.
Inspector Premium Travel
Name Time Hours Time
Jason Clark No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines 4 at E-U, D3-G at 2-16
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018
Report No.10
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:1 48CUBIC YARDS:
SET 1 LOCATION:Footing, column line 4 at G
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H402 4.00 x 8.00 12.57 Good 11/15/18 11/22/18 7 31,000 2,470 2
H403 4 x 8 12.57 Good 11/15/18 11/29/18 14
H404 4 x 8 12.57 Good 11/15/18 12/13/18 28
H405 4 x 8 12.57 Good 11/15/18 12/13/18 28
H406 4 x 8 12.57 Good 11/15/18 12/13/18 28
Slump (in.)4 1/2
Air Temp. (F.)45
Conc Temp (F)67
Truck No.241
Ticket No.027594
Time 1:45
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR; Cylinders received on 11/20/2018.
Inspector Premium Travel
Name Time Hours Time
Jason Clark No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018Compressive Strength Report - Concrete
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines 4 at E-U, D3-G at 2-16
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-15-2018
Report No.10
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-03-2018Concrete Field Report
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 3 sets of cylinders cast on 11/30/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Alex Garcia No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Reinforcing Steel Report
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:11:00 AM
TIME OF CONCRETE PLACEMENT:Unscheduled
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R-4, R-6
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Exterior foundation walls-elevations 1 and 3;
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Ron Hanisco No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Reinforcing Steel Report
Report No.10
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:3 144CUBIC YARDS:
SET 1 LOCATION:Footing, column line V at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H831 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 31,000 2,470 2
H832 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 39,500 3,140 1
H833 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 51,000 4,060 3
H834 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 49,500 3,940 2
H835 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 50,500 4,020 1
Slump (in.)5 1/2
Air Temp. (F.)43
Conc Temp (F)63
Truck No.242
Ticket No.027621
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)5.6
SET 2 LOCATION:Footing, column line W at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H826 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 30,000 2,390 1
H827 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 38,500 3,060 2
H828 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 49,000 3,900 1
H829 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 48,000 3,820 2
H830 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 50,000 3,980 1
Slump (in.)6
Air Temp. (F.)42
Conc Temp (F)60
Truck No.231
Ticket No.027626
Time 11:00
Unit Wt lbs/cu ft
Air Content (%)5.6
SET 3 LOCATION:Footing, column line X at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H926 4 x 8 12.57 Good 11/16/18 11/23/18 7 32,000 2,550 1
H927 4 x 8 12.57 Good 11/16/18 11/30/18 14 41,000 3,260 3
H928 4 x 8 12.57 Good 11/16/18 12/14/18 28 48,000 3,820 2
H929 4 x 8 12.57 Good 11/16/18 12/14/18 28 51,000 4,060 1
H930 4 x 8 12.57 Good 11/16/18 12/14/18 28 52,500 4,180 3
Slump (in.)5
Air Temp. (F.)40
Conc Temp (F)67
Truck No.254
Ticket No.027633
Time 12:10
Unit Wt lbs/cu ft
Air Content (%)5.2
SET 4 LOCATION:Footing, column line Y at A
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H846 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 27,000 2,150 1
H847 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 34,500 2,740 2
H848 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 51,000 4,060 2
H849 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 50,500 4,020 1
H850 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 49,500 3,940 1
Slump (in.)5 1/2
Air Temp. (F.)40
Conc Temp (F)60
Truck No.244
Ticket No.027639
Time 1:55
Unit Wt lbs/cu ft
Air Content (%)6.0
GENERAL REMARKS:*MRWR; cylinders received on 11/21/2018.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines V-Y.3 at A
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 +/- 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018
Report No.11
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:3 144CUBIC YARDS:
SET 1 LOCATION:Footing, column line V at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H831 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 31,000 2,470 2
H832 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 39,500 3,140 1
H833 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 51,000 4,060 3
H834 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 49,500 3,940 2
H835 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 50,500 4,020 1
Slump (in.)5 1/2
Air Temp. (F.)43
Conc Temp (F)63
Truck No.242
Ticket No.027621
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Footing, column line W at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H826 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 30,000 2,390 1
H827 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 38,500 3,060 2
H828 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 49,000 3,900 1
H829 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 48,000 3,820 2
H830 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 50,000 3,980 1
Slump (in.)6
Air Temp. (F.)42
Conc Temp (F)60
Truck No.231
Ticket No.027626
Time 11:00
Unit Wt lbs/cu ft
Air Content (%)5.6
SET 3 LOCATION:Footing, column line X at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H846 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 32,000 2,550 1
H847 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 41,000 3,260 3
H848 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 48,000 3,820 2
H849 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 51,000 4,060 1
H850 4.00 x 8.00 12.57 Good 11/16/18 12/14/18 28 52,500 4,180 3
Slump (in.)5
Air Temp. (F.)40
Conc Temp (F)67
Truck No.254
Ticket No.027633
Time 12:10
Unit Wt lbs/cu ft
Air Content (%)5.2
GENERAL REMARKS:*MRWR; cylinders received on 11/21/2018.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines V-Y.3 at A
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 +/- 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018
Report No.11
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:3 144CUBIC YARDS:
SET 1 LOCATION:Footing, column line V at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H831 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 31,000 2,470 2
H832 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 39,500 3,140 1
H833 4 x 8 12.57 Good 11/16/18 12/14/18 28
H834 4 x 8 12.57 Good 11/16/18 12/14/18 28
H835 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)5 1/2
Air Temp. (F.)43
Conc Temp (F)63
Truck No.242
Ticket No.027621
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Footing, column line W at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H826 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 30,000 2,390 1
H827 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 38,500 3,060 2
H828 4 x 8 12.57 Good 11/16/18 12/14/18 28
H829 4 x 8 12.57 Good 11/16/18 12/14/18 28
H830 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)6
Air Temp. (F.)42
Conc Temp (F)60
Truck No.231
Ticket No.027626
Time 11:00
Unit Wt lbs/cu ft
Air Content (%)5.6
SET 3 LOCATION:Footing, column line X at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H846 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 32,000 2,550 1
H847 4.00 x 8.00 12.57 Good 11/16/18 11/30/18 14 41,000 3,260 3
H848 4 x 8 12.57 Good 11/16/18 12/14/18 28
H849 4 x 8 12.57 Good 11/16/18 12/14/18 28
H850 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)5
Air Temp. (F.)40
Conc Temp (F)67
Truck No.254
Ticket No.027633
Time 12:10
Unit Wt lbs/cu ft
Air Content (%)5.2
GENERAL REMARKS:*MRWR; cylinders received on 11/21/2018.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines V-Y.3 at A
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 +/- 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018
Report No.11
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:3 144CUBIC YARDS:
SET 1 LOCATION:Footing, column line V at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H831 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 31,000 2,470 2
H832 4 x 8 12.57 Good 11/16/18 11/30/18 14
H833 4 x 8 12.57 Good 11/16/18 12/14/18 28
H834 4 x 8 12.57 Good 11/16/18 12/14/18 28
H835 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)5 1/2
Air Temp. (F.)43
Conc Temp (F)63
Truck No.242
Ticket No.027621
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Footing, column line W at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H826 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 30,000 2,390 1
H827 4 x 8 12.57 Good 11/16/18 11/30/18 14
H828 4 x 8 12.57 Good 11/16/18 12/14/18 28
H829 4 x 8 12.57 Good 11/16/18 12/14/18 28
H830 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)6
Air Temp. (F.)42
Conc Temp (F)60
Truck No.231
Ticket No.027626
Time 11:00
Unit Wt lbs/cu ft
Air Content (%)5.6
SET 3 LOCATION:Footing, column line X at A
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H846 4.00 x 8.00 12.57 Good 11/16/18 11/23/18 7 32,000 2,550 1
H847 4 x 8 12.57 Good 11/16/18 11/30/18 14
H848 4 x 8 12.57 Good 11/16/18 12/14/18 28
H849 4 x 8 12.57 Good 11/16/18 12/14/18 28
H850 4 x 8 12.57 Good 11/16/18 12/14/18 28
Slump (in.)5
Air Temp. (F.)40
Conc Temp (F)67
Truck No.254
Ticket No.027633
Time 12:10
Unit Wt lbs/cu ft
Air Content (%)5.2
GENERAL REMARKS:*MRWR; cylinders received on 11/21/2018.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Compressive Strength Report - Concrete
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines V-Y.3 at A
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 +/- 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018
Report No.11
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-05-2018Concrete Field Report
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 3 sets of cylinders cast on 12/4/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Alex Garcia No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Reinforcing Steel Report
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault of Opechee Construction
TIME OF INSPECTION:12:45 pm
TIME OF CONCRETE PLACEMENT:1:00 pm
SPECIFICATION:ASTM A615 Grade 40 Grade 60 x Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:S1.01, S2.01
REVISION NUMBER:DATED:
SHOP DRAWING(S):
PROJECT SPECIFICATIONS:03300
OTHER:
DRAWINGS STAMPED:YES NO
AREA REVIEWED:
Pier Footings: column line 2.3 at 10;
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x
Clearance x
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x
Bar Supports x
Bar Spacing x
Bar Quantity x
Placement and tying x
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Charles Lanier No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Reinforcing Steel Report
Report No.11
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:2 50CUBIC YARDS:
SET 1 LOCATION:Wall, column lines J16-J15
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
K254 4.00 x 8.00 12.57 Good 11/27/18 12/04/18 7 27,000 2,150 2
K255 4.00 x 8.00 12.57 Good 11/27/18 12/11/18 14 40,500 3,220 2
K256 4.00 x 8.00 12.57 Good 11/27/18 12/25/18 28 60,500 4,810 1
K257 4.00 x 8.00 12.57 Good 11/27/18 12/25/18 28 59,000 4,690 1
K258 4.00 x 8.00 12.57 Good 11/27/18 12/25/18 28 60,000 4,770 2
Slump (in.)6 1/2
Air Temp. (F.)43
Conc Temp (F)67
Truck No.253
Ticket No.161505
Time 2:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall, column lines 7.1-7.3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
K249 4.00 x 8.00 12.57 Good 11/27/18 12/04/18 7 25,000 1,990 1
K250 4.00 x 8.00 12.57 Good 11/27/18 12/11/18 14 34,500 2,740 2
K251 4.00 x 8.00 12.57 Good 11/27/18 12/25/18 28 46,500 3,700 1
K252 4.00 x 8.00 12.57 Good 11/27/18 12/25/18 28 50,000 3,980 2
K253 4.00 x 8.00 12.57 Good 11/27/18 12/25/18 28 46,000 3,660 2
Slump (in.)6 1/2
Air Temp. (F.)43
Conc Temp (F)68
Truck No.236
Ticket No.7783
Time 3:51
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 11/28/2018; Same day call in.
Inspector Premium Travel
Name Time Hours Time
Chris King No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, column line J16-J15, 7.1-7.3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2 - 6 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:Ticket numbers on batch slips had duplicate numbers, the superintendent was
notified.
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018
Report No.12
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:2 50CUBIC YARDS:
SET 1 LOCATION:Wall, column lines J16-J15
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
K254 4.00 x 8.00 12.57 Good 11/27/18 12/04/18 7 27,000 2,150 2
K255 4.00 x 8.00 12.57 Good 11/27/18 12/11/18 14 40,500 3,220 2
K256 4 x 8 12.57 Good 11/27/18 12/25/18 28
K257 4 x 8 12.57 Good 11/27/18 12/25/18 28
K258 4 x 8 12.57 Good 11/27/18 12/25/18 28
Slump (in.)6 1/2
Air Temp. (F.)43
Conc Temp (F)67
Truck No.253
Ticket No.161505
Time 2:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall, column lines 7.1-7.3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
K249 4.00 x 8.00 12.57 Good 11/27/18 12/04/18 7 25,000 1,990 1
K250 4.00 x 8.00 12.57 Good 11/27/18 12/11/18 14 34,500 2,740 2
K251 4 x 8 12.57 Good 11/27/18 12/25/18 28
K252 4 x 8 12.57 Good 11/27/18 12/25/18 28
K253 4 x 8 12.57 Good 11/27/18 12/25/18 28
Slump (in.)6 1/2
Air Temp. (F.)43
Conc Temp (F)68
Truck No.236
Ticket No.7783
Time 3:51
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 11/28/2018; Same day call in.
Inspector Premium Travel
Name Time Hours Time
Chris King No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, column line J16-J15, 7.1-7.3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2 - 6 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:Ticket numbers on batch slips had duplicate numbers, the superintendent was
notified.
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018
Report No.12
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:2 50CUBIC YARDS:
SET 1 LOCATION:Wall, column lines J16-J15
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
K254 4.00 x 8.00 12.57 Good 11/27/18 12/04/18 7 27,000 2,150 2
K255 4 x 8 12.57 Good 11/27/18 12/11/18 14
K256 4 x 8 12.57 Good 11/27/18 12/25/18 28
K257 4 x 8 12.57 Good 11/27/18 12/25/18 28
K258 4 x 8 12.57 Good 11/27/18 12/25/18 28
Slump (in.)6 1/2
Air Temp. (F.)43
Conc Temp (F)67
Truck No.253
Ticket No.161505
Time 2:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall, column lines 7.1-7.3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
K249 4.00 x 8.00 12.57 Good 11/27/18 12/04/18 7 25,000 1,990 1
K250 4 x 8 12.57 Good 11/27/18 12/11/18 14
K251 4 x 8 12.57 Good 11/27/18 12/25/18 28
K252 4 x 8 12.57 Good 11/27/18 12/25/18 28
K253 4 x 8 12.57 Good 11/27/18 12/25/18 28
Slump (in.)6 1/2
Air Temp. (F.)43
Conc Temp (F)68
Truck No.236
Ticket No.7783
Time 3:51
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 11/28/2018; Same day call in.
Inspector Premium Travel
Name Time Hours Time
Chris King No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Compressive Strength Report - Concrete
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, column line J16-J15, 7.1-7.3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2 - 6 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:Ticket numbers on batch slips had duplicate numbers, the superintendent was
notified.
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018
Report No.12
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-10-2018Concrete Field Report
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 3 sets of cylinders cast on 12/7/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Sam Ally No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Reinforcing Steel Report
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault/Jason Blaise
TIME OF INSPECTION:11:00 AM
TIME OF CONCRETE PLACEMENT:12:00 PM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R-7, rev. #1, dated 08/24/2018
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Footing, column lines 34-41;
Pier, column lines F16-F28
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Reinforcing Steel Report
Report No.12
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Inspector Premium Travel
Name Time Hours Time
Marquisse Silva No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-20-2018Compressive Strength Report - Concrete
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:2 44CUBIC YARDS:
SET 1 LOCATION:Footing: Line I at 17-20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
I235 4.00 x 8.00 12.57 Good 11/20/18 11/27/18 7 31,000 2,470 2
I236 4.00 x 8.00 12.57 Good 11/20/18 12/04/18 14 38,500 3,060 2
I237 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 43,000 3,420 1
I238 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 46,000 3,660 2
I239 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 45,000 3,580 2
Slump (in.)5
Air Temp. (F.)39
Conc Temp (F)70
Truck No.250
Ticket No.7730
Time 11:45
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Footing: Line I at 27-30
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
I240 4.00 x 8.00 12.57 Good 11/20/18 11/27/18 7 28,000 2,230 1
I241 4.00 x 8.00 12.57 Good 11/20/18 12/04/18 14 34,000 2,700 1
I242 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 42,000 3,340 2
I243 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 43,500 3,460 2
I244 4.00 x 8.00 12.57 Good 11/20/18 12/18/18 28 45,000 3,580 1
Slump (in.)5
Air Temp. (F.)39
Conc Temp (F)63
Truck No.239
Ticket No.7736
Time 2:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR. Cylinders received on 11-26-18.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-20-2018Compressive Strength Report - Concrete
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-20-2018Compressive Strength Report - Concrete
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footings: Line I at 17 to 39
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 +/- 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-20-2018
Report No.13
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-20-2018Compressive Strength Report - Concrete
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:2 44CUBIC YARDS:
SET 1 LOCATION:Footing: Line I at 17-20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
I235 4.00 x 8.00 12.57 Good 11/20/18 11/27/18 7 31,000 2,470 2
I236 4.00 x 8.00 12.57 Good 11/20/18 12/04/18 14 38,500 3,060 2
I237 4 x 8 12.57 Good 11/20/18 12/18/18 28
I238 4 x 8 12.57 Good 11/20/18 12/18/18 28
I239 4 x 8 12.57 Good 11/20/18 12/18/18 28
Slump (in.)5
Air Temp. (F.)39
Conc Temp (F)70
Truck No.250
Ticket No.7730
Time 11:45
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Footing: Line I at 27-30
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
I240 4.00 x 8.00 12.57 Good 11/20/18 11/27/18 7 28,000 2,230 1
I241 4.00 x 8.00 12.57 Good 11/20/18 12/04/18 14 34,000 2,700 1
I242 4 x 8 12.57 Good 11/20/18 12/18/18 28
I243 4 x 8 12.57 Good 11/20/18 12/18/18 28
I244 4 x 8 12.57 Good 11/20/18 12/18/18 28
Slump (in.)5
Air Temp. (F.)39
Conc Temp (F)63
Truck No.239
Ticket No.7736
Time 2:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR. Cylinders received on 11-26-18.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-20-2018Compressive Strength Report - Concrete
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-20-2018Compressive Strength Report - Concrete
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footings: Line I at 17 to 39
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 +/- 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-20-2018
Report No.13
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-28-2018Concrete Field Report
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 11/27/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Jordan Foster No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Reinforcing Steel Report
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:12:00PM
TIME OF CONCRETE PLACEMENT:1:00PM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 x Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):
PROJECT SPECIFICATIONS:03300
OTHER:
xDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Wall: Column Line X.1-32 at X.1-41 Footing: Column Line X.1-42 at 2.5-51
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x
Clearance x
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x
Bar Supports x
Bar Spacing x
Bar Quantity x
Placement and tying x
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Chris King No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Reinforcing Steel Report
Report No.13
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS:
SET 1 LOCATION:Wall: Line Y.3 at 39.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L853 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 21,000 1,670 1
L854 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 34,500 2,740 2
L855 4.00 x 8.00 12.57 Good 11/30/18 12/14/18 14 40,500 3,220 2
L856 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 51,500 4,100 1
L857 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 48,500 3,860 2
L858 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 52,000 4,140 1
Slump (in.)5
Air Temp. (F.)45
Conc Temp (F)71
Truck No.249
Ticket No.0742
Time 1:45
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall: Line 44 at X.1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L847 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 18,500 1,470 2
L848 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 33,500 2,670 1
L849 4.00 x 8.00 12.57 Good 11/30/18 12/14/18 14 39,500 3,140 2
L850 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 51,500 4,100 2
L851 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 51,000 4,060 1
L852 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 48,500 3,860 2
Slump (in.)6 1/2
Air Temp. (F.)40
Conc Temp (F)69
Truck No.257
Ticket No.7851
Time 3:20
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Wall: Line X.1 at 45
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L841 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 20,000 1,590 2
L842 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 29,000 2,310 2
L843 4.00 x 8.00 12.57 Good 11/30/18 12/14/18 14 35,000 2,780 1
L844 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 43,500 3,460 1
L845 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 45,000 3,580 2
L846 4.00 x 8.00 12.57 Good 11/30/18 12/28/18 28 41,500 3,300 2
Slump (in.)6
Air Temp. (F.)40
Conc Temp (F)68
Truck No.255
Ticket No.7853
Time 4:15
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 12-3-18. Same day call in.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Inspector Premium Travel
Name Time Hours Time
Colin Begin No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Walls: Line Y.3 at 39-45, 37-39 at X.1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018
Report No.14
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS:
SET 1 LOCATION:Wall: Line Y.3 at 39.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L853 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 21,000 1,670 1
L854 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 34,500 2,740 2
L855 4.00 x 8.00 12.57 Good 11/30/18 12/14/18 14 40,500 3,220 2
L856 4 x 8 12.57 Good 11/30/18 12/28/18 28
L857 4 x 8 12.57 Good 11/30/18 12/28/18 28
L858 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)5
Air Temp. (F.)45
Conc Temp (F)71
Truck No.249
Ticket No.0742
Time 1:45
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall: Line 44 at X.1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L847 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 18,500 1,470 2
L848 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 33,500 2,670 1
L849 4.00 x 8.00 12.57 Good 11/30/18 12/14/18 14 39,500 3,140 2
L850 4 x 8 12.57 Good 11/30/18 12/28/18 28
L851 4 x 8 12.57 Good 11/30/18 12/28/18 28
L852 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)6 1/2
Air Temp. (F.)40
Conc Temp (F)69
Truck No.257
Ticket No.7851
Time 3:20
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Wall: Line X.1 at 45
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L841 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 20,000 1,590 2
L842 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 29,000 2,310 2
L843 4.00 x 8.00 12.57 Good 11/30/18 12/14/18 14 35,000 2,780 1
L844 4 x 8 12.57 Good 11/30/18 12/28/18 28
L845 4 x 8 12.57 Good 11/30/18 12/28/18 28
L846 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)6
Air Temp. (F.)40
Conc Temp (F)68
Truck No.255
Ticket No.7853
Time 4:15
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 12-3-18. Same day call in.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Inspector Premium Travel
Name Time Hours Time
Colin Begin No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Walls: Line Y.3 at 39-45, 37-39 at X.1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018
Report No.14
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS:
SET 1 LOCATION:Wall: Line Y.3 at 39.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L853 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 21,000 1,670 1
L854 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 34,500 2,740 2
L855 4 x 8 12.57 Good 11/30/18 12/14/18 14
L856 4 x 8 12.57 Good 11/30/18 12/28/18 28
L857 4 x 8 12.57 Good 11/30/18 12/28/18 28
L858 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)5
Air Temp. (F.)45
Conc Temp (F)71
Truck No.249
Ticket No.0742
Time 1:45
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall: Line 44 at X.1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L847 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 18,500 1,470 2
L848 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 33,500 2,670 1
L849 4 x 8 12.57 Good 11/30/18 12/14/18 14
L850 4 x 8 12.57 Good 11/30/18 12/28/18 28
L851 4 x 8 12.57 Good 11/30/18 12/28/18 28
L852 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)6 1/2
Air Temp. (F.)40
Conc Temp (F)69
Truck No.257
Ticket No.7851
Time 3:20
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Wall: Line X.1 at 45
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L841 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 20,000 1,590 2
L842 4.00 x 8.00 12.57 Good 11/30/18 12/07/18 7 29,000 2,310 2
L843 4 x 8 12.57 Good 11/30/18 12/14/18 14
L844 4 x 8 12.57 Good 11/30/18 12/28/18 28
L845 4 x 8 12.57 Good 11/30/18 12/28/18 28
L846 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)6
Air Temp. (F.)40
Conc Temp (F)68
Truck No.255
Ticket No.7853
Time 4:15
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 12-3-18. Same day call in.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Inspector Premium Travel
Name Time Hours Time
Colin Begin No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Walls: Line Y.3 at 39-45, 37-39 at X.1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018
Report No.14
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS:
SET 1 LOCATION:Wall: Line Y.3 at 39.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L853 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 21,000 1,670 1
L854 4 x 8 12.57 Good 11/30/18 12/07/18 7
L855 4 x 8 12.57 Good 11/30/18 12/14/18 14
L856 4 x 8 12.57 Good 11/30/18 12/28/18 28
L857 4 x 8 12.57 Good 11/30/18 12/28/18 28
L858 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)5
Air Temp. (F.)45
Conc Temp (F)71
Truck No.249
Ticket No.0742
Time 1:45
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall: Line 44 at X.1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L847 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 18,500 1,470 2
L848 4 x 8 12.57 Good 11/30/18 12/07/18 7
L849 4 x 8 12.57 Good 11/30/18 12/14/18 14
L850 4 x 8 12.57 Good 11/30/18 12/28/18 28
L851 4 x 8 12.57 Good 11/30/18 12/28/18 28
L852 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)6 1/2
Air Temp. (F.)40
Conc Temp (F)69
Truck No.257
Ticket No.7851
Time 3:20
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Wall: Line X.1 at 45
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L841 4.00 x 8.00 12.57 Good 11/30/18 12/04/18 4 20,000 1,590 2
L842 4 x 8 12.57 Good 11/30/18 12/07/18 7
L843 4 x 8 12.57 Good 11/30/18 12/14/18 14
L844 4 x 8 12.57 Good 11/30/18 12/28/18 28
L845 4 x 8 12.57 Good 11/30/18 12/28/18 28
L846 4 x 8 12.57 Good 11/30/18 12/28/18 28
Slump (in.)6
Air Temp. (F.)40
Conc Temp (F)68
Truck No.255
Ticket No.7853
Time 4:15
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 12-3-18. Same day call in.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Inspector Premium Travel
Name Time Hours Time
Colin Begin No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018Compressive Strength Report - Concrete
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Walls: Line Y.3 at 39-45, 37-39 at X.1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-30-2018
Report No.14
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-03-2019Concrete Field Report
Report No.14
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 1/2/19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Charles Lanier No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-04-2018Compressive Strength Report - Concrete
Report No.15
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:3 99CUBIC YARDS:
SET 1 LOCATION:Wall, column line Y.3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M921 4.00 x 8.00 12.57 Good 12/04/18 12/11/18 7 35,500 2,820 2
M922 4.00 x 8.00 12.57 Good 12/04/18 12/18/18 14 46,000 3,660 1
M923 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 55,000 4,380 1
M924 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 52,000 4,140 2
M925 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 56,000 4,460 1
Slump (in.)5
Air Temp. (F.)36
Conc Temp (F)74
Truck No.253
Ticket No.161508
Time 12:45
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall, column line Y.3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M931 4.00 x 8.00 12.57 Good 12/04/18 12/11/18 7 39,500 3,140 3
M932 4.00 x 8.00 12.57 Good 12/04/18 12/18/18 14 49,000 3,900 1
M933 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 60,500 4,810 3
M934 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 58,000 4,610 2
M935 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 57,000 4,530 1
Slump (in.)5
Air Temp. (F.)36
Conc Temp (F)68
Truck No.231
Ticket No.161508
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Wall, column line Y.1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M926 4.00 x 8.00 12.57 Good 12/04/18 12/11/18 7 37,000 2,940 1
M927 4.00 x 8.00 12.57 Good 12/04/18 12/18/18 14 48,000 3,820 2
M928 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 60,000 4,770 3
M929 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 57,000 4,530 2
M930 4.00 x 8.00 12.57 Good 12/04/18 01/01/19 28 59,000 4,690 1
Slump (in.)5
Air Temp. (F.)35
Conc Temp (F)73
Truck No.253
Ticket No.161508
Time 3:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR; Cylinders received on 12/05/2018.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-04-2018Compressive Strength Report - Concrete
Report No.15
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-04-2018Compressive Strength Report - Concrete
Report No.15
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, column lines Y.3 35-53, Y.1 at 36-38
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)5 +/- 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-04-2018
Report No.15
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-18-2019Concrete Field Report
Report No.15
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 1/16/19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
D. Lent No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS:
SET 1 LOCATION:Wall: Line Z at .451
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P449 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 26,000 2,070 1
P450 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 34,500 2,740 1
P451 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 43,000 3,420 2
P452 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 46,500 3,700 2
P453 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 43,500 3,460 1
Slump (in.)5 1/2
Air Temp. (F.)38
Conc Temp (F)62
Truck No.164
Ticket No.0431
Time 12:10
Unit Wt lbs/cu ft
Air Content (%)7.0
SET 2 LOCATION:Wall: Line W at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P459 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 27,000 2,150 1
P460 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 35,500 2,820 1
P461 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 48,000 3,820 2
P462 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 42,000 3,340 2
P463 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 45,000 3,580 1
Slump (in.)4 1/2
Air Temp. (F.)38
Conc Temp (F)63
Truck No.191
Ticket No.0439
Time 1:15
Unit Wt lbs/cu ft
Air Content (%)6.8
SET 3 LOCATION:Wall: Line Z at 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P454 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 28,000 2,230 2
P455 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 36,500 2,900 2
P456 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 46,000 3,660 1
P457 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 48,000 3,820 3
P458 4.00 x 8.00 12.57 Good 12/07/18 01/04/19 28 49,500 3,940 3
Slump (in.)5
Air Temp. (F.)38
Conc Temp (F)60
Truck No.246
Ticket No.0445
Time 2:10
Unit Wt lbs/cu ft
Air Content (%)6.5
GENERAL REMARKS:Cylinders received on 12-11-18.
Inspector Premium Travel
Name Time Hours Time
Sam Ally No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall: Lines Z at .451 to W at 18
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneXX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018
Report No.16
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS:
SET 1 LOCATION:Wall: Line Z at .451
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P449 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 26,000 2,070 1
P450 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 34,500 2,740 1
P451 4 x 8 12.57 Good 12/07/18 01/04/19 28
P452 4 x 8 12.57 Good 12/07/18 01/04/19 28
P453 4 x 8 12.57 Good 12/07/18 01/04/19 28
Slump (in.)5 1/2
Air Temp. (F.)38
Conc Temp (F)62
Truck No.164
Ticket No.0431
Time 12:10
Unit Wt lbs/cu ft
Air Content (%)7.0
SET 2 LOCATION:Wall: Line W at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P459 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 27,000 2,150 1
P460 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 35,500 2,820 1
P461 4 x 8 12.57 Good 12/07/18 01/04/19 28
P462 4 x 8 12.57 Good 12/07/18 01/04/19 28
P463 4 x 8 12.57 Good 12/07/18 01/04/19 28
Slump (in.)4 1/2
Air Temp. (F.)38
Conc Temp (F)63
Truck No.191
Ticket No.0439
Time 1:15
Unit Wt lbs/cu ft
Air Content (%)6.8
SET 3 LOCATION:Wall: Line Z at 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P454 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 28,000 2,230 2
P455 4.00 x 8.00 12.57 Good 12/07/18 12/21/18 14 36,500 2,900 2
P456 4 x 8 12.57 Good 12/07/18 01/04/19 28
P457 4 x 8 12.57 Good 12/07/18 01/04/19 28
P458 4 x 8 12.57 Good 12/07/18 01/04/19 28
Slump (in.)5
Air Temp. (F.)38
Conc Temp (F)60
Truck No.246
Ticket No.0445
Time 2:10
Unit Wt lbs/cu ft
Air Content (%)6.5
GENERAL REMARKS:Cylinders received on 12-11-18.
Inspector Premium Travel
Name Time Hours Time
Sam Ally No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall: Lines Z at .451 to W at 18
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneXX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018
Report No.16
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:3 88CUBIC YARDS:
SET 1 LOCATION:Wall: Line Z at .451
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P449 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 26,000 2,070 1
P450 4 x 8 12.57 Good 12/07/18 12/21/18 14
P451 4 x 8 12.57 Good 12/07/18 01/04/19 28
P452 4 x 8 12.57 Good 12/07/18 01/04/19 28
P453 4 x 8 12.57 Good 12/07/18 01/04/19 28
Slump (in.)5 1/2
Air Temp. (F.)38
Conc Temp (F)62
Truck No.164
Ticket No.0431
Time 12:10
Unit Wt lbs/cu ft
Air Content (%)7.0
SET 2 LOCATION:Wall: Line W at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P459 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 27,000 2,150 1
P460 4 x 8 12.57 Good 12/07/18 12/21/18 14
P461 4 x 8 12.57 Good 12/07/18 01/04/19 28
P462 4 x 8 12.57 Good 12/07/18 01/04/19 28
P463 4 x 8 12.57 Good 12/07/18 01/04/19 28
Slump (in.)4 1/2
Air Temp. (F.)38
Conc Temp (F)63
Truck No.191
Ticket No.0439
Time 1:15
Unit Wt lbs/cu ft
Air Content (%)6.8
SET 3 LOCATION:Wall: Line Z at 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P454 4.00 x 8.00 12.57 Good 12/07/18 12/14/18 7 28,000 2,230 2
P455 4 x 8 12.57 Good 12/07/18 12/21/18 14
P456 4 x 8 12.57 Good 12/07/18 01/04/19 28
P457 4 x 8 12.57 Good 12/07/18 01/04/19 28
P458 4 x 8 12.57 Good 12/07/18 01/04/19 28
Slump (in.)5
Air Temp. (F.)38
Conc Temp (F)60
Truck No.246
Ticket No.0445
Time 2:10
Unit Wt lbs/cu ft
Air Content (%)6.5
GENERAL REMARKS:Cylinders received on 12-11-18.
Inspector Premium Travel
Name Time Hours Time
Sam Ally No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018Compressive Strength Report - Concrete
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall: Lines Z at .451 to W at 18
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneXX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-07-2018
Report No.16
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-18-2019Concrete Field Report
Report No.16
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 01-16-19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Gary Plante No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 48CUBIC YARDS:
SET 1 LOCATION:Pier Footing Column Line 10
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W616 4.00 x 8.00 12.57 Good 01/02/19 01/09/19 7 38,500 3,060 1
W617 4.00 x 8.00 12.57 Good 01/02/19 01/16/19 14 45,000 3,580 1
W618 4.00 x 8.00 12.57 Good 01/02/19 01/30/19 28 48,000 3,820 2
W619 4.00 x 8.00 12.57 Good 01/02/19 01/30/19 28 49,000 3,900 1
W620 4.00 x 8.00 12.57 Good 01/02/19 01/30/19 28 52,000 4,140 2
Slump (in.)5 1/2
Air Temp. (F.)34
Conc Temp (F)61
Truck No.187
Ticket No.0911
Time 1:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinder Received on 1-4-19
Inspector Premium Travel
Name Time Hours Time
Charles Lanier No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:8 Pier Footings along Column Line 2.3, 4 Pier Footings along Column Line 10
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
OtherX Plastic Bags
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019
Report No.17
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 48CUBIC YARDS:
SET 1 LOCATION:Pier Footing Column Line 10
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W616 4.00 x 8.00 12.57 Good 01/02/19 01/09/19 7 38,500 3,060 1
W617 4.00 x 8.00 12.57 Good 01/02/19 01/16/19 14 45,000 3,580 1
W618 4 x 8 12.57 Good 01/02/19 01/30/19 28
W619 4 x 8 12.57 Good 01/02/19 01/30/19 28
W620 4 x 8 12.57 Good 01/02/19 01/30/19 28
Slump (in.)5 1/2
Air Temp. (F.)34
Conc Temp (F)61
Truck No.187
Ticket No.0911
Time 1:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinder Received on 1-4-19
Inspector Premium Travel
Name Time Hours Time
Charles Lanier No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:8 Pier Footings along Column Line 2.3, 4 Pier Footings along Column Line 10
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
OtherX Plastic Bags
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019
Report No.17
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 48CUBIC YARDS:
SET 1 LOCATION:Pier Footing Column Line 10
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W616 4.00 x 8.00 12.57 Good 01/02/19 01/09/19 7 38,500 3,060 1
W617 4 x 8 12.57 Good 01/02/19 01/16/19 14
W618 4 x 8 12.57 Good 01/02/19 01/30/19 28
W619 4 x 8 12.57 Good 01/02/19 01/30/19 28
W620 4 x 8 12.57 Good 01/02/19 01/30/19 28
Slump (in.)5 1/2
Air Temp. (F.)34
Conc Temp (F)61
Truck No.187
Ticket No.0911
Time 1:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinder Received on 1-4-19
Inspector Premium Travel
Name Time Hours Time
Charles Lanier No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019Compressive Strength Report - Concrete
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:8 Pier Footings along Column Line 2.3, 4 Pier Footings along Column Line 10
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
OtherX Plastic Bags
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-02-2019
Report No.17
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-04-2019Concrete Field Report
Report No.17
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 2/1/19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Alexa Lee No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 50CUBIC YARDS:
SET 1 LOCATION:Footing, column lines 34-41
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C182 4.00 x 8.00 12.57 Good 01/16/19 01/23/19 7 32,500 2,590 1
C183 4.00 x 8.00 12.57 Good 01/16/19 01/30/19 14 45,500 3,620 2
C184 4.00 x 8.00 12.57 Good 01/16/19 02/13/19 28 57,000 4,530 1
C185 4.00 x 8.00 12.57 Good 01/16/19 02/13/19 28 56,500 4,490 2
C186 4.00 x 8.00 12.57 Good 01/16/19 02/13/19 28 58,000 4,610 1
Slump (in.)6
Air Temp. (F.)36
Conc Temp (F)61
Truck No.117
Ticket No.152072
Time 2:15
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 01/21/2019.
Inspector Premium Travel
Name Time Hours Time
Marquisse Silva No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines 34-41; pier, column lines F16-F28
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)5-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019
Report No.18
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 50CUBIC YARDS:
SET 1 LOCATION:Footing, column lines 34-41
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C182 4.00 x 8.00 12.57 Good 01/16/19 01/23/19 7 32,500 2,590 1
C183 4.00 x 8.00 12.57 Good 01/16/19 01/30/19 14 45,500 3,620 2
C184 4 x 8 12.57 Good 01/16/19 02/13/19 28
C185 4 x 8 12.57 Good 01/16/19 02/13/19 28
C186 4 x 8 12.57 Good 01/16/19 02/13/19 28
Slump (in.)6
Air Temp. (F.)36
Conc Temp (F)61
Truck No.117
Ticket No.152072
Time 2:15
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 01/21/2019.
Inspector Premium Travel
Name Time Hours Time
Marquisse Silva No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines 34-41; pier, column lines F16-F28
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)5-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019
Report No.18
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 50CUBIC YARDS:
SET 1 LOCATION:Footing, column lines 34-41
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C182 4.00 x 8.00 12.57 Good 01/16/19 01/23/19 7 32,500 2,590 1
C183 4 x 8 12.57 Good 01/16/19 01/30/19 14
C184 4 x 8 12.57 Good 01/16/19 02/13/19 28
C185 4 x 8 12.57 Good 01/16/19 02/13/19 28
C186 4 x 8 12.57 Good 01/16/19 02/13/19 28
Slump (in.)6
Air Temp. (F.)36
Conc Temp (F)61
Truck No.117
Ticket No.152072
Time 2:15
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 01/21/2019.
Inspector Premium Travel
Name Time Hours Time
Marquisse Silva No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019Compressive Strength Report - Concrete
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines 34-41; pier, column lines F16-F28
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)5-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-16-2019
Report No.18
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-21-2019Concrete Field Report
Report No.18
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 5 sets of cylinders cast on 03-20-19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Alex Garcia No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets:1 60CUBIC YARDS:
SET 1 LOCATION:Footing/Wall: Column Line X.1 at 32-41
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
F792 4.00 x 8.00 12.57 Good 02/01/19 02/08/19 7 36,500 2,900 2
F793 4.00 x 8.00 12.57 Good 02/01/19 02/15/19 14 48,000 3,820 2
F794 4.00 x 8.00 12.57 Good 02/01/19 03/01/19 28 53,000 4,220 2
F795 4.00 x 8.00 12.57 Good 02/01/19 03/01/19 28 54,000 4,300 1
F796 4.00 x 8.00 12.57 Good 02/01/19 03/01/19 28 58,500 4,650 2
Slump (in.)6 1/2
Air Temp. (F.)20
Conc Temp (F)65
Truck No.117
Ticket No.2371
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR, 2% Non Cloride Accel
Inspector Premium Travel
Name Time Hours Time
Chris King No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall: Column Line X.1-32 at X.1-41 Footing: Column Line X.1-42 at 2.5-51
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019
Report No.19
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets:1 60CUBIC YARDS:
SET 1 LOCATION:Footing/Wall: Column Line X.1 at 32-41
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
F792 4.00 x 8.00 12.57 Good 02/01/19 02/08/19 7 36,500 2,900 2
F793 4.00 x 8.00 12.57 Good 02/01/19 02/15/19 14 48,000 3,820 2
F794 4 x 8 12.57 Good 02/01/19 03/01/19 28
F795 4 x 8 12.57 Good 02/01/19 03/01/19 28
F796 4 x 8 12.57 Good 02/01/19 03/01/19 28
Slump (in.)6 1/2
Air Temp. (F.)20
Conc Temp (F)65
Truck No.117
Ticket No.2371
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR, 2% Non Cloride Accel
Inspector Premium Travel
Name Time Hours Time
Chris King No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall: Column Line X.1-32 at X.1-41 Footing: Column Line X.1-42 at 2.5-51
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019
Report No.19
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets:1 60CUBIC YARDS:
SET 1 LOCATION:Footing/Wall: Column Line X.1 at 32-41
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
F792 4.00 x 8.00 12.57 Good 02/01/19 02/08/19 7 36,500 2,900 2
F793 4 x 8 12.57 Good 02/01/19 02/15/19 14
F794 4 x 8 12.57 Good 02/01/19 03/01/19 28
F795 4 x 8 12.57 Good 02/01/19 03/01/19 28
F796 4 x 8 12.57 Good 02/01/19 03/01/19 28
Slump (in.)6 1/2
Air Temp. (F.)20
Conc Temp (F)65
Truck No.117
Ticket No.2371
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR, 2% Non Cloride Accel
Inspector Premium Travel
Name Time Hours Time
Chris King No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019Compressive Strength Report - Concrete
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall: Column Line X.1-32 at X.1-41 Footing: Column Line X.1-42 at 2.5-51
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-01-2019
Report No.19
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-08-2019Concrete Field Report
Report No.19
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 6 sets of cylinders cast on 04-05-19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Frank Toughill No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 29CUBIC YARDS:
SET 1 LOCATION:V-10 - M1 Foundation wall
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P076 4.00 x 8.00 12.57 Good 10/04/18 10/11/18 7 41,000 3,260 1
P077 4 x 8 12.57 Good 10/04/18 10/18/18 14
P078 4 x 8 12.57 Good 10/04/18 11/01/18 28
P079 4 x 8 12.57 Good 10/04/18 11/01/18 28
P080 4 x 8 12.57 Good 10/04/18 11/01/18 28
Slump (in.)5 1/2
Air Temp. (F.)68
Conc Temp (F)74
Truck No.1674
Ticket No.4023
Time 3:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
FIELD SUMMARY REPORT
Total Pour:Foundation wall V-10 - M1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018
Report No.2
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 29CUBIC YARDS:
SET 1 LOCATION:V-10 - M1 Foundation wall
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P076 4.00 x 8.00 12.57 Good 10/04/18 10/11/18 7 41,000 3,260 1
P077 4.00 x 8.00 12.57 Good 10/04/18 10/18/18 14 52,500 4,180 1
P078 4 x 8 12.57 Good 10/04/18 11/01/18 28
P079 4 x 8 12.57 Good 10/04/18 11/01/18 28
P080 4 x 8 12.57 Good 10/04/18 11/01/18 28
Slump (in.)5 1/2
Air Temp. (F.)68
Conc Temp (F)74
Truck No.1674
Ticket No.4023
Time 3:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
FIELD SUMMARY REPORT
Total Pour:Foundation wall V-10 - M1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018
Report No.2
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 29CUBIC YARDS:
SET 1 LOCATION:V-10 - M1 Foundation wall
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
P076 4.00 x 8.00 12.57 Good 10/04/18 10/11/18 7 41,000 3,260 1
P077 4.00 x 8.00 12.57 Good 10/04/18 10/18/18 14 52,500 4,180 1
P078 4.00 x 8.00 12.57 Good 10/04/18 11/01/18 28 63,000 5,010 1
P079 4.00 x 8.00 12.57 Good 10/04/18 11/01/18 28 59,000 4,690 2
P080 4.00 x 8.00 12.57 Good 10/04/18 11/01/18 28 61,500 4,890 1
Slump (in.)5 1/2
Air Temp. (F.)68
Conc Temp (F)74
Truck No.1674
Ticket No.4023
Time 3:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018Compressive Strength Report - Concrete
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.Aggregate
FIELD SUMMARY REPORT
Total Pour:Foundation wall V-10 - M1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-04-2018
Report No.2
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Concrete Field Report
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 10/4/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Alex Garcia No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Concrete Plant Report
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan - Wakefield plant
CLASS CONCRETE:3000# 3/8"*CUBIC YARDS:265
Dry Unit of
Weights Quantity Measure Materials Description
Cement 660 lbs./cu.yd.Brand Name LaFarge - type II
Fine Aggregate 1400 lbs./cu.yd.Source Hefferon - Wilmington, MA
Coarse Aggregate 820 lbs./cu.yd.Source Norlite - NY - 3/8" lightweight
Admixture 1.1 ozs./cu.yd.Brand Name W.R. Grace - Darex II
Admixture 33.5 ozs./cu.yd.Brand Name W.R. Grace - Daracem 55 (MRWR)
Water 31.6 gals/cu.yd.Source Town of Wakefield
Result PLANT GRADATIONSDescription
SAND COARSE AGGREGATEMoisture in Sand (%)3.5
Moisture in Coarse Aggregate (%)18 F. M.2.68 F. M.5.63
ProbeNumber of Determinations Sieve Size % Passing Sieve Size % Passing
YesWeights Adjusted to Compensate for Moisture #200 #8 2.0
OKSand Colormetric Test #100 7.0 #4 35.0
#50 23.0 3/8"100.0
#30 46.0 1/2"100.0
#16 72.0 3/4"100.0
#8 87.0 1"100.0
#4 97.0 1 1/2"
GENERAL REMARKS:*lightweight, pump with MRWR.
Inspector Premium Travel
Name Time Hours Time
J. Viera No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-06-2019IFC FIRESTOPPING INSPECTION
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:3:30 PM
CONTACT:Dennis Prescott
SUMMARY:
Attached is the IFC firestopping inspection report prepared by UTS inspector Eric McFadden for the
above project.
GENERAL REMARKS:IFC Firestopping Inspection
Inspector Premium Travel
Name Time Hours Time
Eric McFadden No 4.00 .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
UTS of Massachusetts, Inc. Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-06-2019
Report No.2
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-06-2019
Report No.2
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-06-2019
Report No.2
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-06-2019
Report No.2
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Reinforcing Steel Report
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:1:00 pm
TIME OF CONCRETE PLACEMENT:1:30 pm
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R-5 dated 8-7-18
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Footing - Line B-K.6 at 1-12
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Greg Quinno No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Reinforcing Steel Report
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-28-2019Steel Inspection Report
Report No.2
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:11:30 AM
CONTACT:Jeff Daigneault
SUMMARY:
Attached is the steel inspection report prepared by UTS inspector Tom Harkins for the above project.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
T. Harkins No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
UTS of Massachusetts, Inc. Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-28-2019
Report No.2
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 4 225CUBIC YARDS:
SET 1 LOCATION:SOD: NE Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V987 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 42,000 3,340 1
V988 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 54,000 4,300 1
V989 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 71,000 5,650 1
V990 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 70,000 5,570 2
V991 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 74,500 5,930 1
Slump (in.)7 1/2
Air Temp. (F.)32
Conc Temp (F)62
Truck No.254
Ticket No.3660
Time 8:05
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD: SE Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V992 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 46,000 3,660 1
V993 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 60,000 4,770 2
V994 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 69,000 5,490 3
V995 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 71,500 5,690 2
V996 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 72,000 5,730 1
Slump (in.)7
Air Temp. (F.)34
Conc Temp (F)68
Truck No.239
Ticket No.3667
Time 8:45
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD: SW Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V982 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 43,500 3,460 2
V983 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 59,000 4,690 2
V984 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 69,500 5,530 1
V985 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 66,500 5,290 2
V986 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 68,000 5,410 1
Slump (in.)7 1/2
Air Temp. (F.)35
Conc Temp (F)64
Truck No.242
Ticket No.3675
Time 9:30
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD: SW Corner, Level 3
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W001 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 45,000 3,580 2
W002 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 57,000 4,530 2
W003 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 71,500 5,690 3
W004 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 70,000 5,570 2
W005 4.00 x 8.00 12.57 Good 03/20/19 04/17/19 28 71,000 5,650 1
Slump (in.)7
Air Temp. (F.)35
Conc Temp (F)71
Truck No.255
Ticket No.3683
Time 10:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, 2% Non Cloride Accel. Same Day Call In. Cylinders Received 3-
21-19
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Min Day .5 Hr(s)
Chris King No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Hotel, Level 3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:Screed
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)6 (+/-) 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 4 225CUBIC YARDS:
SET 1 LOCATION:SOD: NE Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V987 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 42,000 3,340 1
V988 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 54,000 4,300 1
V989 4 x 8 12.57 Good 03/20/19 04/17/19 28
V990 4 x 8 12.57 Good 03/20/19 04/17/19 28
V991 4 x 8 12.57 Good 03/20/19 04/17/19 28
Slump (in.)7 1/2
Air Temp. (F.)32
Conc Temp (F)62
Truck No.254
Ticket No.3660
Time 8:05
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD: SE Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V992 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 46,000 3,660 1
V993 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 60,000 4,770 2
V994 4 x 8 12.57 Good 03/20/19 04/17/19 28
V995 4 x 8 12.57 Good 03/20/19 04/17/19 28
V996 4 x 8 12.57 Good 03/20/19 04/17/19 28
Slump (in.)7
Air Temp. (F.)34
Conc Temp (F)68
Truck No.239
Ticket No.3667
Time 8:45
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD: SW Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V982 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 43,500 3,460 2
V983 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 59,000 4,690 2
V984 4 x 8 12.57 Good 03/20/19 04/17/19 28
V985 4 x 8 12.57 Good 03/20/19 04/17/19 28
V986 4 x 8 12.57 Good 03/20/19 04/17/19 28
Slump (in.)7 1/2
Air Temp. (F.)35
Conc Temp (F)64
Truck No.242
Ticket No.3675
Time 9:30
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD: SW Corner, Level 3
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W001 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 45,000 3,580 2
W002 4.00 x 8.00 12.57 Good 03/20/19 04/03/19 14 57,000 4,530 2
W003 4 x 8 12.57 Good 03/20/19 04/17/19 28
W004 4 x 8 12.57 Good 03/20/19 04/17/19 28
W005 4 x 8 12.57 Good 03/20/19 04/17/19 28
Slump (in.)7
Air Temp. (F.)35
Conc Temp (F)71
Truck No.255
Ticket No.3683
Time 10:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, 2% Non Cloride Accel. Same Day Call In. Cylinders Received 3-
21-19
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Min Day .5 Hr(s)
Chris King No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Hotel, Level 3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:Screed
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)6 (+/-) 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 4 225CUBIC YARDS:
SET 1 LOCATION:SOD: NE Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V987 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 42,000 3,340 1
V988 4 x 8 12.57 Good 03/20/19 04/03/19 14
V989 4 x 8 12.57 Good 03/20/19 04/17/19 28
V990 4 x 8 12.57 Good 03/20/19 04/17/19 28
V991 4 x 8 12.57 Good 03/20/19 04/17/19 28
Slump (in.)7 1/2
Air Temp. (F.)32
Conc Temp (F)62
Truck No.254
Ticket No.3660
Time 8:05
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD: SE Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V992 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 46,000 3,660 1
V993 4 x 8 12.57 Good 03/20/19 04/03/19 14
V994 4 x 8 12.57 Good 03/20/19 04/17/19 28
V995 4 x 8 12.57 Good 03/20/19 04/17/19 28
V996 4 x 8 12.57 Good 03/20/19 04/17/19 28
Slump (in.)7
Air Temp. (F.)34
Conc Temp (F)68
Truck No.239
Ticket No.3667
Time 8:45
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD: SW Corner, Level 3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V982 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 43,500 3,460 2
V983 4 x 8 12.57 Good 03/20/19 04/03/19 14
V984 4 x 8 12.57 Good 03/20/19 04/17/19 28
V985 4 x 8 12.57 Good 03/20/19 04/17/19 28
V986 4 x 8 12.57 Good 03/20/19 04/17/19 28
Slump (in.)7 1/2
Air Temp. (F.)35
Conc Temp (F)64
Truck No.242
Ticket No.3675
Time 9:30
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD: SW Corner, Level 3
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W001 4.00 x 8.00 12.57 Good 03/20/19 03/27/19 7 45,000 3,580 2
W002 4 x 8 12.57 Good 03/20/19 04/03/19 14
W003 4 x 8 12.57 Good 03/20/19 04/17/19 28
W004 4 x 8 12.57 Good 03/20/19 04/17/19 28
W005 4 x 8 12.57 Good 03/20/19 04/17/19 28
Slump (in.)7
Air Temp. (F.)35
Conc Temp (F)71
Truck No.255
Ticket No.3683
Time 10:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, 2% Non Cloride Accel. Same Day Call In. Cylinders Received 3-
21-19
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Min Day .5 Hr(s)
Chris King No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 03-20-2019Compressive Strength Report - Concrete
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Hotel, Level 3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:Screed
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)6 (+/-) 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-01-2019Concrete Field Report
Report No.20
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 5 sets of cylinders cast on 04/29/19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Frank Toughill No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.21
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:2 68CUBIC YARDS:
SET 1 LOCATION:SOG: Column Line 32
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
D219 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 44,500 3,540 1
D220 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 56,000 4,460 2
D221 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 62,500 4,970 1
D222 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 66,000 5,250 3
D223 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 65,500 5,210 2
Slump (in.)5
Air Temp. (F.)32
Conc Temp (F)65
Truck No.252
Ticket No.4298
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOG: Column Line Y3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
D449 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 31,500 2,510 1
D450 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 45,000 3,580 2
D451 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 54,000 4,300 1
D452 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 56,000 4,460 2
D453 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 55,000 4,380 1
Slump (in.)5 1/2
Air Temp. (F.)34
Conc Temp (F)67
Truck No.233
Ticket No.4309
Time 8:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR, 1% Non Cloride Accel, Polymesh Fiber. Cylinders Received 4-9-19. Early
Morning Rate: 6:00-7:00AM.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.21
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.21
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Column Line 32 at Y3; Retail Shop Area
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:Screed
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)5 (+/-) 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019
Report No.21
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.21
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:2 68CUBIC YARDS:
SET 1 LOCATION:SOG: Column Line 32
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
D219 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 44,500 3,540 1
D220 4 x 8 12.57 Good 04/05/19 04/19/19 14
D221 4 x 8 12.57 Good 04/05/19 05/03/19 28
D222 4 x 8 12.57 Good 04/05/19 05/03/19 28
D223 4 x 8 12.57 Good 04/05/19 05/03/19 28
Slump (in.)5
Air Temp. (F.)32
Conc Temp (F)65
Truck No.252
Ticket No.4298
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOG: Column Line Y3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
D449 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 31,500 2,510 1
D450 4 x 8 12.57 Good 04/05/19 04/19/19 14
D451 4 x 8 12.57 Good 04/05/19 05/03/19 28
D452 4 x 8 12.57 Good 04/05/19 05/03/19 28
D453 4 x 8 12.57 Good 04/05/19 05/03/19 28
Slump (in.)5 1/2
Air Temp. (F.)34
Conc Temp (F)67
Truck No.233
Ticket No.4309
Time 8:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR, 1% Non Cloride Accel, Polymesh Fiber. Cylinders Received 4-9-19. Early
Morning Rate: 6:00-7:00AM.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.21
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.21
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Column Line 32 at Y3; Retail Shop Area
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:Screed
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)5 (+/-) 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019
Report No.21
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets:4 142CUBIC YARDS:
SET 1 LOCATION:Slab at 16 Line, Back Corner
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C909 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 37,000 2,940 1
C910 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 52,000 4,140 2
C911 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 72,500 5,770 1
C912 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 73,000 5,810 2
C913 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 74,500 5,930 1
Slump (in.)7
Air Temp. (F.)37
Conc Temp (F)63
Truck No.252
Ticket No.4324
Time 9:20
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab at 21 Line at Center Slab
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
D214 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 47,000 3,740 2
D215 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 58,000 4,610 1
D216 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 64,000 5,090 3
D217 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 62,000 4,930 2
D218 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 65,000 5,170 1
Slump (in.)7
Air Temp. (F.)39
Conc Temp (F)70
Truck No.187
Ticket No.4342
Time 10:35
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Slab at 25 Line
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C914 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 36,000 2,860 3
C915 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 49,000 3,900 2
C916 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 66,000 5,250 1
C917 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 64,000 5,090 2
C918 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 63,000 5,010 1
Slump (in.)6 1/2
Air Temp. (F.)40
Conc Temp (F)66
Truck No.249
Ticket No.4365
Time 12:00
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Slab at 29 Line, Front Corner
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C919 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 35,000 2,780 2
C920 4.00 x 8.00 12.57 Good 04/05/19 04/19/19 14 48,500 3,860 1
C921 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 74,000 5,890 1
C922 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 71,000 5,650 3
C923 4.00 x 8.00 12.57 Good 04/05/19 05/03/19 28 71,500 5,690 2
Slump (in.)7
Air Temp. (F.)41
Conc Temp (F)71
Truck No.241
Ticket No.4375
Time 12:55
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, 1% Non Cloride Accel. Cylinders Received 4-8-19
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Line 16 to 29, Level 32
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 (+/-) 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019
Report No.22
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets:4 142CUBIC YARDS:
SET 1 LOCATION:Slab at 16 Line, Back Corner
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C909 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 37,000 2,940 1
C910 4 x 8 12.57 Good 04/05/19 04/19/19 14
C911 4 x 8 12.57 Good 04/05/19 05/03/19 28
C912 4 x 8 12.57 Good 04/05/19 05/03/19 28
C913 4 x 8 12.57 Good 04/05/19 05/03/19 28
Slump (in.)7
Air Temp. (F.)37
Conc Temp (F)63
Truck No.252
Ticket No.4324
Time 9:20
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab at 21 Line at Center Slab
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
D214 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 47,000 3,740 2
D215 4 x 8 12.57 Good 04/05/19 04/19/19 14
D216 4 x 8 12.57 Good 04/05/19 05/03/19 28
D217 4 x 8 12.57 Good 04/05/19 05/03/19 28
D218 4 x 8 12.57 Good 04/05/19 05/03/19 28
Slump (in.)7
Air Temp. (F.)39
Conc Temp (F)70
Truck No.187
Ticket No.4342
Time 10:35
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Slab at 25 Line
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C914 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 36,000 2,860 3
C915 4 x 8 12.57 Good 04/05/19 04/19/19 14
C916 4 x 8 12.57 Good 04/05/19 05/03/19 28
C917 4 x 8 12.57 Good 04/05/19 05/03/19 28
C918 4 x 8 12.57 Good 04/05/19 05/03/19 28
Slump (in.)6 1/2
Air Temp. (F.)40
Conc Temp (F)66
Truck No.249
Ticket No.4365
Time 12:00
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Slab at 29 Line, Front Corner
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
C919 4.00 x 8.00 12.57 Good 04/05/19 04/12/19 7 35,000 2,780 2
C920 4 x 8 12.57 Good 04/05/19 04/19/19 14
C921 4 x 8 12.57 Good 04/05/19 05/03/19 28
C922 4 x 8 12.57 Good 04/05/19 05/03/19 28
C923 4 x 8 12.57 Good 04/05/19 05/03/19 28
Slump (in.)7
Air Temp. (F.)41
Conc Temp (F)71
Truck No.241
Ticket No.4375
Time 12:55
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, 1% Non Cloride Accel. Cylinders Received 4-8-19
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019Compressive Strength Report - Concrete
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Line 16 to 29, Level 32
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 (+/-) 1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-05-2019
Report No.22
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-06-2019Concrete Field Report
Report No.22
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 6 sets of cylinders cast on 6/5/19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Michael Callahan No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 264CUBIC YARDS:
SET 1 LOCATION:SOD: Column Line A2 at V3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L369 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 42,500 3,380 2
L370 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 47,500 3,780 2
L371 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 58,000 4,610 1
L372 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 61,000 4,850 3
L373 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 59,000 4,690 2
Slump (in.)6
Air Temp. (F.)44
Conc Temp (F)60
Truck No.233
Ticket No.5183
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD: Column Line A10 at V5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L344 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 42,000 3,340 1
L345 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 49,000 3,900 1
L346 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 58,000 4,610 1
L347 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 56,500 4,490 3
L348 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 57,000 4,530 2
Slump (in.)6 1/4
Air Temp. (F.)46
Conc Temp (F)60
Truck No.248
Ticket No.5195
Time 9:00
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD: Column Line A13 at V7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L359 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 35,500 2,820 1
L360 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 49,500 3,940 2
L361 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 60,000 4,770 1
L362 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 59,000 4,690 2
L363 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 57,500 4,570 1
Slump (in.)6 1/2
Air Temp. (F.)48
Conc Temp (F)61
Truck No.242
Ticket No.5205
Time 9:50
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD: Column Line A16 at V8
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L374 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 48,000 3,820 2
L375 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 51,500 4,100 2
L376 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 62,500 4,970 1
L377 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 62,000 4,930 2
L378 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 58,500 4,650 1
Slump (in.)6 1/4
Air Temp. (F.)54
Conc Temp (F)62
Truck No.247
Ticket No.5216
Time 10:56
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD: Column Line A16 at V9
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L364 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 33,500 2,670 2
L365 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 46,500 3,700 1
L366 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 54,000 4,300 2
L367 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 56,000 4,460 1
L368 4.00 x 8.00 12.57 Good 04/29/19 05/27/19 28 57,500 4,570 1
Slump (in.)6 1/2
Air Temp. (F.)57
Conc Temp (F)63
Truck No.250
Ticket No.5224
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR. Cylinders Received 5-1-19. Early Morning Rate: 6:00-7:00AM.
Same Day Call In.
Inspector Premium Travel
Name Time Hours Time
P. Treska No Max Day .5 Hr(s)
Chris Grant No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Column Line A1-A19 at V-V10; Level 44
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:Screed
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)6-7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019
Report No.23
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019
Report No.23
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 264CUBIC YARDS:
SET 1 LOCATION:SOD: Column Line A2 at V3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L369 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 42,500 3,380 2
L370 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 47,500 3,780 2
L371 4 x 8 12.57 Good 04/29/19 05/27/19 28
L372 4 x 8 12.57 Good 04/29/19 05/27/19 28
L373 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6
Air Temp. (F.)44
Conc Temp (F)60
Truck No.233
Ticket No.5183
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD: Column Line A10 at V5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L344 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 42,000 3,340 1
L345 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 49,000 3,900 1
L346 4 x 8 12.57 Good 04/29/19 05/27/19 28
L347 4 x 8 12.57 Good 04/29/19 05/27/19 28
L348 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6 1/4
Air Temp. (F.)46
Conc Temp (F)60
Truck No.248
Ticket No.5195
Time 9:00
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD: Column Line A13 at V7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L359 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 35,500 2,820 1
L360 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 49,500 3,940 2
L361 4 x 8 12.57 Good 04/29/19 05/27/19 28
L362 4 x 8 12.57 Good 04/29/19 05/27/19 28
L363 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6 1/2
Air Temp. (F.)48
Conc Temp (F)61
Truck No.242
Ticket No.5205
Time 9:50
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD: Column Line A16 at V8
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L374 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 48,000 3,820 2
L375 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 51,500 4,100 2
L376 4 x 8 12.57 Good 04/29/19 05/27/19 28
L377 4 x 8 12.57 Good 04/29/19 05/27/19 28
L378 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6 1/4
Air Temp. (F.)54
Conc Temp (F)62
Truck No.247
Ticket No.5216
Time 10:56
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD: Column Line A16 at V9
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L364 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 33,500 2,670 2
L365 4.00 x 8.00 12.57 Good 04/29/19 05/13/19 14 46,500 3,700 1
L366 4 x 8 12.57 Good 04/29/19 05/27/19 28
L367 4 x 8 12.57 Good 04/29/19 05/27/19 28
L368 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6 1/2
Air Temp. (F.)57
Conc Temp (F)63
Truck No.250
Ticket No.5224
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR. Cylinders Received 5-1-19. Early Morning Rate: 6:00-7:00AM.
Same Day Call In.
Inspector Premium Travel
Name Time Hours Time
P. Treska No Max Day .5 Hr(s)
Chris Grant No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Column Line A1-A19 at V-V10; Level 44
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:Screed
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)6-7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019
Report No.23
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019
Report No.23
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 264CUBIC YARDS:
SET 1 LOCATION:SOD: Column Line A2 at V3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L369 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 42,500 3,380 2
L370 4 x 8 12.57 Good 04/29/19 05/13/19 14
L371 4 x 8 12.57 Good 04/29/19 05/27/19 28
L372 4 x 8 12.57 Good 04/29/19 05/27/19 28
L373 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6
Air Temp. (F.)44
Conc Temp (F)60
Truck No.233
Ticket No.5183
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD: Column Line A10 at V5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L344 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 42,000 3,340 1
L345 4 x 8 12.57 Good 04/29/19 05/13/19 14
L346 4 x 8 12.57 Good 04/29/19 05/27/19 28
L347 4 x 8 12.57 Good 04/29/19 05/27/19 28
L348 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6 1/4
Air Temp. (F.)46
Conc Temp (F)60
Truck No.248
Ticket No.5195
Time 9:00
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD: Column Line A13 at V7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L359 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 35,500 2,820 1
L360 4 x 8 12.57 Good 04/29/19 05/13/19 14
L361 4 x 8 12.57 Good 04/29/19 05/27/19 28
L362 4 x 8 12.57 Good 04/29/19 05/27/19 28
L363 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6 1/2
Air Temp. (F.)48
Conc Temp (F)61
Truck No.242
Ticket No.5205
Time 9:50
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD: Column Line A16 at V8
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L374 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 48,000 3,820 2
L375 4 x 8 12.57 Good 04/29/19 05/13/19 14
L376 4 x 8 12.57 Good 04/29/19 05/27/19 28
L377 4 x 8 12.57 Good 04/29/19 05/27/19 28
L378 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6 1/4
Air Temp. (F.)54
Conc Temp (F)62
Truck No.247
Ticket No.5216
Time 10:56
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD: Column Line A16 at V9
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
L364 4.00 x 8.00 12.57 Good 04/29/19 05/06/19 7 33,500 2,670 2
L365 4 x 8 12.57 Good 04/29/19 05/13/19 14
L366 4 x 8 12.57 Good 04/29/19 05/27/19 28
L367 4 x 8 12.57 Good 04/29/19 05/27/19 28
L368 4 x 8 12.57 Good 04/29/19 05/27/19 28
Slump (in.)6 1/2
Air Temp. (F.)57
Conc Temp (F)63
Truck No.250
Ticket No.5224
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR. Cylinders Received 5-1-19. Early Morning Rate: 6:00-7:00AM.
Same Day Call In.
Inspector Premium Travel
Name Time Hours Time
P. Treska No Max Day .5 Hr(s)
Chris Grant No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019Compressive Strength Report - Concrete
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD: Column Line A1-A19 at V-V10; Level 44
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:Screed
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)6-7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019
Report No.23
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 04-29-2019
Report No.23
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-19-2019Concrete Field Report
Report No.23
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 5 sets of cylinders cast on 06/18/19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Frank Toughill No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 243CUBIC YARDS:
SET 1 LOCATION:SOD; Column line 20, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T705 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 42,000 3,340 1
T706 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 54,000 4,300 3
T707 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 60,500 4,810 1
T708 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 61,000 4,850 2
T709 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 59,500 4,730 1
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)69
Truck No.232
Ticket No.6282
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD; Column line 25, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T710 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 40,000 3,180 2
T711 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 50,000 3,980 1
T712 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 61,000 4,850 1
T713 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 59,000 4,690 2
T714 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 64,500 5,130 1
Slump (in.) **
Air Temp. (F.)60
Conc Temp (F)68
Truck No.246
Ticket No.6291
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD; Column line 30, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T715 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 39,000 3,100 1
T716 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 49,000 3,900 2
T717 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 63,500 5,050 2
T718 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 62,500 4,970 1
T719 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 61,000 4,850 2
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)67
Truck No.242
Ticket No.6302
Time 8:30
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD; Column line 40, Level 44
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T720 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 41,500 3,300 2
T721 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 50,000 3,980 1
T722 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 64,000 5,090 1
T723 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 62,000 4,930 2
T724 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 61,500 4,890 1
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)68
Truck No.160
Ticket No.6308
Time 9:15
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD; Column line 50, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T725 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 36,000 2,860 2
T726 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 46,500 3,700 2
T727 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 60,000 4,770 3
T728 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 59,500 4,730 2
T729 4.00 x 8.00 12.57 Good 05/22/19 06/19/19 28 62,500 4,970 1
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)69
Truck No.179
Ticket No.6314
Time 10:20
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 05/23/19. *MRWR **8 1/2, 7 1/2
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Max Day .5 Hr(s)
Stanley Aloi No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines 20 - 53, Level 44
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)7-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019
Report No.24
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019
Report No.24
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 243CUBIC YARDS:
SET 1 LOCATION:SOD; Column line 20, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T705 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 42,000 3,340 1
T706 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 54,000 4,300 3
T707 4 x 8 12.57 Good 05/22/19 06/19/19 28
T708 4 x 8 12.57 Good 05/22/19 06/19/19 28
T709 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)69
Truck No.232
Ticket No.6282
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD; Column line 25, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T710 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 40,000 3,180 2
T711 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 50,000 3,980 1
T712 4 x 8 12.57 Good 05/22/19 06/19/19 28
T713 4 x 8 12.57 Good 05/22/19 06/19/19 28
T714 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.) **
Air Temp. (F.)60
Conc Temp (F)68
Truck No.246
Ticket No.6291
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD; Column line 30, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T715 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 39,000 3,100 1
T716 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 49,000 3,900 2
T717 4 x 8 12.57 Good 05/22/19 06/19/19 28
T718 4 x 8 12.57 Good 05/22/19 06/19/19 28
T719 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)67
Truck No.242
Ticket No.6302
Time 8:30
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD; Column line 40, Level 44
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T720 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 41,500 3,300 2
T721 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 50,000 3,980 1
T722 4 x 8 12.57 Good 05/22/19 06/19/19 28
T723 4 x 8 12.57 Good 05/22/19 06/19/19 28
T724 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)68
Truck No.160
Ticket No.6308
Time 9:15
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD; Column line 50, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T725 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 36,000 2,860 2
T726 4.00 x 8.00 12.57 Good 05/22/19 06/05/19 14 46,500 3,700 2
T727 4 x 8 12.57 Good 05/22/19 06/19/19 28
T728 4 x 8 12.57 Good 05/22/19 06/19/19 28
T729 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)69
Truck No.179
Ticket No.6314
Time 10:20
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 05/23/19. *MRWR **8 1/2, 7 1/2
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Max Day .5 Hr(s)
Stanley Aloi No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines 20 - 53, Level 44
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)7-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019
Report No.24
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019
Report No.24
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 243CUBIC YARDS:
SET 1 LOCATION:SOD; Column line 20, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T705 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 42,000 3,340 1
T706 4 x 8 12.57 Good 05/22/19 06/05/19 14
T707 4 x 8 12.57 Good 05/22/19 06/19/19 28
T708 4 x 8 12.57 Good 05/22/19 06/19/19 28
T709 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)69
Truck No.232
Ticket No.6282
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD; Column line 25, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T710 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 40,000 3,180 2
T711 4 x 8 12.57 Good 05/22/19 06/05/19 14
T712 4 x 8 12.57 Good 05/22/19 06/19/19 28
T713 4 x 8 12.57 Good 05/22/19 06/19/19 28
T714 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.) **
Air Temp. (F.)60
Conc Temp (F)68
Truck No.246
Ticket No.6291
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD; Column line 30, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T715 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 39,000 3,100 1
T716 4 x 8 12.57 Good 05/22/19 06/05/19 14
T717 4 x 8 12.57 Good 05/22/19 06/19/19 28
T718 4 x 8 12.57 Good 05/22/19 06/19/19 28
T719 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)67
Truck No.242
Ticket No.6302
Time 8:30
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD; Column line 40, Level 44
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T720 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 41,500 3,300 2
T721 4 x 8 12.57 Good 05/22/19 06/05/19 14
T722 4 x 8 12.57 Good 05/22/19 06/19/19 28
T723 4 x 8 12.57 Good 05/22/19 06/19/19 28
T724 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)68
Truck No.160
Ticket No.6308
Time 9:15
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD; Column line 50, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T725 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 36,000 2,860 2
T726 4 x 8 12.57 Good 05/22/19 06/05/19 14
T727 4 x 8 12.57 Good 05/22/19 06/19/19 28
T728 4 x 8 12.57 Good 05/22/19 06/19/19 28
T729 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)69
Truck No.179
Ticket No.6314
Time 10:20
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 05/23/19. *MRWR **8 1/2, 7 1/2
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Max Day .5 Hr(s)
Stanley Aloi No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines 20 - 53, Level 44
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)7-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019
Report No.24
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019
Report No.24
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 243CUBIC YARDS:
SET 1 LOCATION:SOD; Column line 20, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T705 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 42,000 3,340 1
T706 4 x 8 12.57 Good 05/22/19 06/05/19 14
T707 4 x 8 12.57 Good 05/22/19 06/19/19 28
T708 4 x 8 12.57 Good 05/22/19 06/19/19 28
T709 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)69
Truck No.232
Ticket No.6282
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD; Column line 25, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T710 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 40,000 3,180 2
T711 4 x 8 12.57 Good 05/22/19 06/05/19 14
T712 4 x 8 12.57 Good 05/22/19 06/19/19 28
T713 4 x 8 12.57 Good 05/22/19 06/19/19 28
T714 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.) **
Air Temp. (F.)60
Conc Temp (F)68
Truck No.246
Ticket No.6291
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD; Column line 30, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T715 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 39,000 3,100 1
T716 4 x 8 12.57 Good 05/22/19 06/05/19 14
T717 4 x 8 12.57 Good 05/22/19 06/19/19 28
T718 4 x 8 12.57 Good 05/22/19 06/19/19 28
T719 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)67
Truck No.242
Ticket No.6302
Time 8:30
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD; Column line 40, Level 44
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T720 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 41,500 3,300 2
T721 4 x 8 12.57 Good 05/22/19 06/05/19 14
T722 4 x 8 12.57 Good 05/22/19 06/19/19 28
T723 4 x 8 12.57 Good 05/22/19 06/19/19 28
T724 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)68
Truck No.160
Ticket No.6308
Time 9:15
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD; Column line 50, Level 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T725 4.00 x 8.00 12.57 Good 05/22/19 05/29/19 7 36,000 2,860 2
T726 4 x 8 12.57 Good 05/22/19 06/05/19 14
T727 4 x 8 12.57 Good 05/22/19 06/19/19 28
T728 4 x 8 12.57 Good 05/22/19 06/19/19 28
T729 4 x 8 12.57 Good 05/22/19 06/19/19 28
Slump (in.)8,7
Air Temp. (F.)60
Conc Temp (F)69
Truck No.179
Ticket No.6314
Time 10:20
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 05/23/19. *MRWR **8 1/2, 7 1/2
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Max Day .5 Hr(s)
Stanley Aloi No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019Compressive Strength Report - Concrete
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines 20 - 53, Level 44
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)7-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019
Report No.24
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 05-22-2019
Report No.24
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-27-2019Concrete Field Report
Report No.24
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 2 sets of cylinders cast on 06-26-19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Michael Callahan No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets:6 268CUBIC YARDS:
SET 1 LOCATION:Column lines; C.1 at 2.9
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A124 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 35,500 2,820 1
A125 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 45,000 3,580 1
A126 4 x 8 12.57 Good 06/05/19 07/03/19 28
A127 4 x 8 12.57 Good 06/05/19 07/03/19 28
A128 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.) **
Air Temp. (F.)63
Conc Temp (F)72
Truck No.258
Ticket No.6419
Time 7:20
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Column lines; Q at 3.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A129 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 36,500 2,900 2
A130 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 48,000 3,820 2
A131 4 x 8 12.57 Good 06/05/19 07/03/19 28
A132 4 x 8 12.57 Good 06/05/19 07/03/19 28
A133 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.)8,7
Air Temp. (F.)66
Conc Temp (F)71
Truck No.202
Ticket No.6932
Time 8:10
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Column lines N at 4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z989 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 39,000 3,100 2
Z990 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 50,000 3,980 2
Z991 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z992 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z993 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.) **
Air Temp. (F.)66
Conc Temp (F)72
Truck No.242
Ticket No.6944
Time 8:55
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Column lines; J.6 at 7.1
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z984 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 41,500 3,300 1
Z985 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 54,000 4,300 1
Z986 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z987 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z988 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.) **
Air Temp. (F.)70
Conc Temp (F)74
Truck No.246
Ticket No.6959
Time 10:05
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:Column lines; C at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A148 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 33,000 2,630 1
A149 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 44,000 3,500 2
A150 4 x 8 12.57 Good 06/05/19 07/03/19 28
A151 4 x 8 12.57 Good 06/05/19 07/03/19 28
A152 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.)8,7
Air Temp. (F.)72
Conc Temp (F)74
Truck No.241
Ticket No.6967
Time 10:45
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:Column lines F at 18
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z974 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 38,500 3,060 2
Z975 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 49,000 3,900 3
Z976 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z977 4 x 8 12.57 Good 06/05/19 07/03/19 28
Z978 4 x 8 12.57 Good 06/05/19 07/03/19 28
Slump (in.) **
Air Temp. (F.)75
Conc Temp (F)75
Truck No.258
Ticket No.6983
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/05/19. *MRWR **8 1/2, 7 1/2. Early morning rate 6:00am
to 7:00am.
Inspector Premium Travel
Name Time Hours Time
Corey Keith No Max Day .5 Hr(s)
Chris Grant No Max Day .5 Hr(s)
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Column lines U at 1, A at 19, SOD, Level 5 Floor
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2-7 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019
Report No.25
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019
Report No.25
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets:6 268CUBIC YARDS:
SET 1 LOCATION:Column lines; C.1 at 2.9
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A124 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 35,500 2,820 1
A125 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 45,000 3,580 1
A126 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 54,000 4,300 1
A127 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 57,000 4,530 2
A128 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 56,000 4,460 1
Slump (in.) **
Air Temp. (F.)63
Conc Temp (F)72
Truck No.258
Ticket No.6419
Time 7:20
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Column lines; Q at 3.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A129 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 36,500 2,900 2
A130 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 48,000 3,820 2
A131 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 60,000 4,770 1
A132 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 57,500 4,570 3
A133 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 61,000 4,850 3
Slump (in.)8,7
Air Temp. (F.)66
Conc Temp (F)71
Truck No.202
Ticket No.6932
Time 8:10
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Column lines N at 4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z989 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 39,000 3,100 2
Z990 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 50,000 3,980 2
Z991 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 60,500 4,810 2
Z992 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 63,000 5,010 1
Z993 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 65,000 5,170 2
Slump (in.) **
Air Temp. (F.)66
Conc Temp (F)72
Truck No.242
Ticket No.6944
Time 8:55
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Column lines; J.6 at 7.1
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z984 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 41,500 3,300 1
Z985 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 54,000 4,300 1
Z986 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 63,000 5,010 1
Z987 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 61,000 4,850 2
Z988 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 60,500 4,810 1
Slump (in.) **
Air Temp. (F.)70
Conc Temp (F)74
Truck No.246
Ticket No.6959
Time 10:05
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:Column lines; C at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
A148 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 33,000 2,630 1
A149 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 44,000 3,500 2
A150 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 56,000 4,460 1
A151 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 58,000 4,610 2
A152 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 58,500 4,650 1
Slump (in.)8,7
Air Temp. (F.)72
Conc Temp (F)74
Truck No.241
Ticket No.6967
Time 10:45
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:Column lines F at 18
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z974 4.00 x 8.00 12.57 Good 06/05/19 06/12/19 7 38,500 3,060 2
Z975 4.00 x 8.00 12.57 Good 06/05/19 06/19/19 14 49,000 3,900 3
Z976 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 57,500 4,570 1
Z977 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 61,000 4,850 2
Z978 4.00 x 8.00 12.57 Good 06/05/19 07/03/19 28 60,000 4,770 1
Slump (in.) **
Air Temp. (F.)75
Conc Temp (F)75
Truck No.258
Ticket No.6983
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/05/19. *MRWR **8 1/2, 7 1/2. Early morning rate 6:00am
to 7:00am.
Inspector Premium Travel
Name Time Hours Time
Corey Keith No Max Day .5 Hr(s)
Chris Grant No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019Compressive Strength Report - Concrete
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Column lines U at 1, A at 19, SOD, Level 5 Floor
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5 1/2-7 1/2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019
Report No.25
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-05-2019
Report No.25
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-10-2019Concrete Field Report
Report No.25
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 6 sets of cylinders cast on 07/09/19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Michael Callahan No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 225CUBIC YARDS:
SET 1 LOCATION:Slab; Column line 20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E304 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 34,500 2,740 2
E305 4 x 8 12.57 Good 06/18/19 07/02/19 14
E306 4 x 8 12.57 Good 06/18/19 07/16/19 28
E307 4 x 8 12.57 Good 06/18/19 07/16/19 28
E308 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)72
Truck No.252
Ticket No.7545
Time 7:10
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab; Column line 28
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E299 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 35,000 2,780 1
E300 4 x 8 12.57 Good 06/18/19 07/02/19 14
E301 4 x 8 12.57 Good 06/18/19 07/16/19 28
E302 4 x 8 12.57 Good 06/18/19 07/16/19 28
E303 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)7,6
Air Temp. (F.)65
Conc Temp (F)70
Truck No.255
Ticket No.7553
Time 7:55
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Slab; Column line 35
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E284 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 45,000 3,580 1
E285 4 x 8 12.57 Good 06/18/19 07/02/19 14
E286 4 x 8 12.57 Good 06/18/19 07/16/19 28
E287 4 x 8 12.57 Good 06/18/19 07/16/19 28
E288 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)72
Truck No.250
Ticket No.5762
Time 8:35
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Slab; Column line 43
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E294 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 36,000 2,860 3
E295 4 x 8 12.57 Good 06/18/19 07/02/19 14
E296 4 x 8 12.57 Good 06/18/19 07/16/19 28
E297 4 x 8 12.57 Good 06/18/19 07/16/19 28
E298 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)70
Truck No.117
Ticket No.7571
Time 9:15
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:Slab; Column line 50
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E269 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 47,000 3,740 2
E270 4 x 8 12.57 Good 06/18/19 07/02/19 14
E271 4 x 8 12.57 Good 06/18/19 07/16/19 28
E272 4 x 8 12.57 Good 06/18/19 07/16/19 28
E273 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)7,6
Air Temp. (F.)65
Conc Temp (F)71
Truck No.160
Ticket No.7580
Time 10:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/19/19. *MRWR 1% Non-chloride, Lightweight.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Mark Geraci No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines 19 - 54 on Level 54
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)6(+/-)1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019
Report No.26
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019
Report No.26
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 225CUBIC YARDS:
SET 1 LOCATION:Slab; Column line 20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E304 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 34,500 2,740 2
E305 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 46,500 3,700 1
E306 4 x 8 12.57 Good 06/18/19 07/16/19 28
E307 4 x 8 12.57 Good 06/18/19 07/16/19 28
E308 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)72
Truck No.252
Ticket No.7545
Time 7:10
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab; Column line 28
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E299 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 35,000 2,780 1
E300 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 47,000 3,740 2
E301 4 x 8 12.57 Good 06/18/19 07/16/19 28
E302 4 x 8 12.57 Good 06/18/19 07/16/19 28
E303 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)7,6
Air Temp. (F.)65
Conc Temp (F)70
Truck No.255
Ticket No.7553
Time 7:55
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Slab; Column line 35
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E284 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 45,000 3,580 1
E285 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 57,000 4,530 2
E286 4 x 8 12.57 Good 06/18/19 07/16/19 28
E287 4 x 8 12.57 Good 06/18/19 07/16/19 28
E288 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)72
Truck No.250
Ticket No.5762
Time 8:35
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Slab; Column line 43
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E294 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 36,000 2,860 3
E295 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 48,000 3,820 1
E296 4 x 8 12.57 Good 06/18/19 07/16/19 28
E297 4 x 8 12.57 Good 06/18/19 07/16/19 28
E298 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)70
Truck No.117
Ticket No.7571
Time 9:15
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:Slab; Column line 50
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E269 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 47,000 3,740 2
E270 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 60,000 4,770 1
E271 4 x 8 12.57 Good 06/18/19 07/16/19 28
E272 4 x 8 12.57 Good 06/18/19 07/16/19 28
E273 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)7,6
Air Temp. (F.)65
Conc Temp (F)71
Truck No.160
Ticket No.7580
Time 10:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/19/19. *MRWR 1% Non-chloride, Lightweight.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Mark Geraci No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines 19 - 54 on Level 54
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)6(+/-)1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019
Report No.26
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019
Report No.26
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 225CUBIC YARDS:
SET 1 LOCATION:Slab; Column line 20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E304 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 34,500 2,740 2
E305 4 x 8 12.57 Good 06/18/19 07/02/19 14
E306 4 x 8 12.57 Good 06/18/19 07/16/19 28
E307 4 x 8 12.57 Good 06/18/19 07/16/19 28
E308 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)72
Truck No.252
Ticket No.7545
Time 7:10
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab; Column line 28
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E299 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 35,000 2,780 1
E300 4 x 8 12.57 Good 06/18/19 07/02/19 14
E301 4 x 8 12.57 Good 06/18/19 07/16/19 28
E302 4 x 8 12.57 Good 06/18/19 07/16/19 28
E303 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)7,6
Air Temp. (F.)65
Conc Temp (F)70
Truck No.255
Ticket No.7553
Time 7:55
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Slab; Column line 35
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E284 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 45,000 3,580 1
E285 4 x 8 12.57 Good 06/18/19 07/02/19 14
E286 4 x 8 12.57 Good 06/18/19 07/16/19 28
E287 4 x 8 12.57 Good 06/18/19 07/16/19 28
E288 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)72
Truck No.250
Ticket No.5762
Time 8:35
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Slab; Column line 43
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E294 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 36,000 2,860 3
E295 4 x 8 12.57 Good 06/18/19 07/02/19 14
E296 4 x 8 12.57 Good 06/18/19 07/16/19 28
E297 4 x 8 12.57 Good 06/18/19 07/16/19 28
E298 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)70
Truck No.117
Ticket No.7571
Time 9:15
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:Slab; Column line 50
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E269 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 47,000 3,740 2
E270 4 x 8 12.57 Good 06/18/19 07/02/19 14
E271 4 x 8 12.57 Good 06/18/19 07/16/19 28
E272 4 x 8 12.57 Good 06/18/19 07/16/19 28
E273 4 x 8 12.57 Good 06/18/19 07/16/19 28
Slump (in.)7,6
Air Temp. (F.)65
Conc Temp (F)71
Truck No.160
Ticket No.7580
Time 10:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/19/19. *MRWR 1% Non-chloride, Lightweight.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Mark Geraci No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines 19 - 54 on Level 54
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)6(+/-)1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019
Report No.26
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019
Report No.26
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 5 225CUBIC YARDS:
SET 1 LOCATION:Slab; Column line 20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E304 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 34,500 2,740 2
E305 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 46,500 3,700 1
E306 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 64,000 5,090 1
E307 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 63,500 5,050 2
E308 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 67,000 5,330 1
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)72
Truck No.252
Ticket No.7545
Time 7:10
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab; Column line 28
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E299 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 35,000 2,780 1
E300 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 47,000 3,740 2
E301 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 58,500 4,650 3
E302 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 60,500 4,810 2
E303 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 59,000 4,690 1
Slump (in.)7,6
Air Temp. (F.)65
Conc Temp (F)70
Truck No.255
Ticket No.7553
Time 7:55
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Slab; Column line 35
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E284 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 45,000 3,580 1
E285 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 57,000 4,530 2
E286 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 61,500 4,890 1
E287 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 63,500 5,050 2
E288 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 60,000 4,770 1
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)72
Truck No.250
Ticket No.5762
Time 8:35
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Slab; Column line 43
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E294 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 36,000 2,860 3
E295 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 48,000 3,820 1
E296 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 70,500 5,610 1
E297 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 64,500 5,130 2
E298 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 67,000 5,330 1
Slump (in.)8,7
Air Temp. (F.)65
Conc Temp (F)70
Truck No.117
Ticket No.7571
Time 9:15
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:Slab; Column line 50
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
E269 4.00 x 8.00 12.57 Good 06/18/19 06/25/19 7 47,000 3,740 2
E270 4.00 x 8.00 12.57 Good 06/18/19 07/02/19 14 60,000 4,770 1
E271 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 74,500 5,930 1
E272 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 69,000 5,490 2
E273 4.00 x 8.00 12.57 Good 06/18/19 07/16/19 28 72,000 5,730 1
Slump (in.)7,6
Air Temp. (F.)65
Conc Temp (F)71
Truck No.160
Ticket No.7580
Time 10:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/19/19. *MRWR 1% Non-chloride, Lightweight.
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Mark Geraci No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019Compressive Strength Report - Concrete
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines 19 - 54 on Level 54
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
Other
Slump Specification (in.)6(+/-)1
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019
Report No.26
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-18-2019
Report No.26
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-26-2019Concrete Field Report
Report No.26
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 4 sets of cylinders cast on 7/24/19 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Rafy Lora No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:2 71CUBIC YARDS:
SET 1 LOCATION:Slab; Column lines V10 - M8
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H493 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 42,000 3,340 1
H494 4 x 8 12.57 Good 06/26/19 07/10/19 14
H495 4 x 8 12.57 Good 06/26/19 07/24/19 28
H496 4 x 8 12.57 Good 06/26/19 07/24/19 28
H497 4 x 8 12.57 Good 06/26/19 07/24/19 28
Slump (in.)6,5 1/2
Air Temp. (F.)68
Conc Temp (F)70
Truck No.117
Ticket No.7887
Time 7:40
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab; Column lines M8
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H508 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 37,500 2,980 1
H509 4 x 8 12.57 Good 06/26/19 07/10/19 14
H510 4 x 8 12.57 Good 06/26/19 07/24/19 28
H511 4 x 8 12.57 Good 06/26/19 07/24/19 28
H512 4 x 8 12.57 Good 06/26/19 07/24/19 28
Slump (in.)6 1/2,6
Air Temp. (F.)68
Conc Temp (F)71
Truck No.260
Ticket No.7897
Time 9:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/28/19.
Inspector Premium Travel
Name Time Hours Time
Gary Plante No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines V10 - M8
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5(+/-)2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019
Report No.27
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:2 71CUBIC YARDS:
SET 1 LOCATION:Slab; Column lines V10 - M8
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H493 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 42,000 3,340 1
H494 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 55,000 4,380 3
H495 4 x 8 12.57 Good 06/26/19 07/24/19 28
H496 4 x 8 12.57 Good 06/26/19 07/24/19 28
H497 4 x 8 12.57 Good 06/26/19 07/24/19 28
Slump (in.)6,5 1/2
Air Temp. (F.)68
Conc Temp (F)70
Truck No.117
Ticket No.7887
Time 7:40
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab; Column lines M8
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H508 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 37,500 2,980 1
H509 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 50,000 3,980 1
H510 4 x 8 12.57 Good 06/26/19 07/24/19 28
H511 4 x 8 12.57 Good 06/26/19 07/24/19 28
H512 4 x 8 12.57 Good 06/26/19 07/24/19 28
Slump (in.)6 1/2,6
Air Temp. (F.)68
Conc Temp (F)71
Truck No.260
Ticket No.7897
Time 9:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/28/19.
Inspector Premium Travel
Name Time Hours Time
Gary Plante No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines V10 - M8
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5(+/-)2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019
Report No.27
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:2 71CUBIC YARDS:
SET 1 LOCATION:Slab; Column lines V10 - M8
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H493 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 42,000 3,340 1
H494 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 55,000 4,380 3
H495 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 61,000 4,850 1
H496 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 59,500 4,730 2
H497 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 62,000 4,930 1
Slump (in.)6,5 1/2
Air Temp. (F.)68
Conc Temp (F)70
Truck No.117
Ticket No.7887
Time 7:40
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab; Column lines M8
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
H508 4.00 x 8.00 12.57 Good 06/26/19 07/03/19 7 37,500 2,980 1
H509 4.00 x 8.00 12.57 Good 06/26/19 07/10/19 14 50,000 3,980 1
H510 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 53,000 4,220 1
H511 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 56,500 4,490 3
H512 4.00 x 8.00 12.57 Good 06/26/19 07/24/19 28 55,000 4,380 2
Slump (in.)6 1/2,6
Air Temp. (F.)68
Conc Temp (F)71
Truck No.260
Ticket No.7897
Time 9:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 06/28/19.
Inspector Premium Travel
Name Time Hours Time
Gary Plante No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019Compressive Strength Report - Concrete
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Column lines V10 - M8
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)5(+/-)2
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 06-26-2019
Report No.27
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-11-2020Concrete Field Report
Report No.27
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 6 sets of cylinders cast on 02/10/20 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Michael Callahan No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 6 252CUBIC YARDS:
SET 1 LOCATION:SOD at Line 19
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M619 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 36,500 2,900 2
M620 4 x 8 12.57 Good 07/09/19 07/23/19 14
M621 4 x 8 12.57 Good 07/09/19 08/06/19 28
M622 4 x 8 12.57 Good 07/09/19 08/06/19 28
M623 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)63
Truck No.233
Ticket No.8373
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD at Line 15
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M595 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 37,000 2,940 2
M596 4 x 8 12.57 Good 07/09/19 07/23/19 14
M597 4 x 8 12.57 Good 07/09/19 08/06/19 28
M598 4 x 8 12.57 Good 07/09/19 08/06/19 28
M599 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)72
Conc Temp (F)65
Truck No.246
Ticket No.5884
Time 8:50
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD at Line 12
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M584 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 35,500 2,820 2
M585 4 x 8 12.57 Good 07/09/19 07/23/19 14
M586 4 x 8 12.57 Good 07/09/19 08/06/19 28
M587 4 x 8 12.57 Good 07/09/19 08/06/19 28
M588 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)6 1/2,6
Air Temp. (F.)74
Conc Temp (F)68
Truck No.253
Ticket No.8398
Time 9:45
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD at Line 8
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
N639 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 31,000 2,470 2
N640 4 x 8 12.57 Good 07/09/19 07/23/19 14
N641 4 x 8 12.57 Good 07/09/19 08/06/19 28
N642 4 x 8 12.57 Good 07/09/19 08/06/19 28
N643 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7,6 1/2
Air Temp. (F.)76
Conc Temp (F)70
Truck No.202
Ticket No.8404
Time 10:25
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD at Line 4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M567 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,000 3,180 1
M568 4 x 8 12.57 Good 07/09/19 07/23/19 14
M569 4 x 8 12.57 Good 07/09/19 08/06/19 28
M570 4 x 8 12.57 Good 07/09/19 08/06/19 28
M571 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)77
Conc Temp (F)65
Truck No.244
Ticket No.8420
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:SOD at Line 1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M614 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,500 3,220 1
M615 4 x 8 12.57 Good 07/09/19 07/23/19 14
M616 4 x 8 12.57 Good 07/09/19 08/06/19 28
M617 4 x 8 12.57 Good 07/09/19 08/06/19 28
M618 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)80
Conc Temp (F)71
Truck No.233
Ticket No.8429
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, Pump Mix. Cylinders Received 7-10-19. Early Morning Rate: 6:00-
7:00AM
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Joe Simard No Max Day .5 Hr(s)
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Level 64, Line 19-1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)5-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 6 252CUBIC YARDS:
SET 1 LOCATION:SOD at Line 19
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M619 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 36,500 2,900 2
M620 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 49,000 3,900 1
M621 4 x 8 12.57 Good 07/09/19 08/06/19 28
M622 4 x 8 12.57 Good 07/09/19 08/06/19 28
M623 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)63
Truck No.233
Ticket No.8373
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD at Line 15
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M595 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 37,000 2,940 2
M596 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 48,000 3,820 2
M597 4 x 8 12.57 Good 07/09/19 08/06/19 28
M598 4 x 8 12.57 Good 07/09/19 08/06/19 28
M599 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)72
Conc Temp (F)65
Truck No.246
Ticket No.5884
Time 8:50
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD at Line 12
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M584 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 35,500 2,820 2
M585 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 48,000 3,820 1
M586 4 x 8 12.57 Good 07/09/19 08/06/19 28
M587 4 x 8 12.57 Good 07/09/19 08/06/19 28
M588 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)6 1/2,6
Air Temp. (F.)74
Conc Temp (F)68
Truck No.253
Ticket No.8398
Time 9:45
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD at Line 8
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
N639 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 31,000 2,470 2
N640 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 42,500 3,380 1
N641 4 x 8 12.57 Good 07/09/19 08/06/19 28
N642 4 x 8 12.57 Good 07/09/19 08/06/19 28
N643 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7,6 1/2
Air Temp. (F.)76
Conc Temp (F)70
Truck No.202
Ticket No.8404
Time 10:25
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD at Line 4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M567 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,000 3,180 1
M568 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 46,000 3,660 2
M569 4 x 8 12.57 Good 07/09/19 08/06/19 28
M570 4 x 8 12.57 Good 07/09/19 08/06/19 28
M571 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)77
Conc Temp (F)65
Truck No.244
Ticket No.8420
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:SOD at Line 1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M614 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,500 3,220 1
M615 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 47,500 3,780 2
M616 4 x 8 12.57 Good 07/09/19 08/06/19 28
M617 4 x 8 12.57 Good 07/09/19 08/06/19 28
M618 4 x 8 12.57 Good 07/09/19 08/06/19 28
Slump (in.)7
Air Temp. (F.)80
Conc Temp (F)71
Truck No.233
Ticket No.8429
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, Pump Mix. Cylinders Received 7-10-19. Early Morning Rate: 6:00-
7:00AM
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Joe Simard No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Level 64, Line 19-1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)5-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 6 252CUBIC YARDS:
SET 1 LOCATION:SOD at Line 19
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M619 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 36,500 2,900 2
M620 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 49,000 3,900 1
M621 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 54,000 4,300 1
M622 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 53,000 4,220 2
M623 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 57,500 4,570 1
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)63
Truck No.233
Ticket No.8373
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD at Line 15
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M595 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 37,000 2,940 2
M596 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 48,000 3,820 2
M597 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 57,500 4,570 3
M598 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 56,500 4,490 2
M599 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 58,000 4,610 1
Slump (in.)7
Air Temp. (F.)72
Conc Temp (F)65
Truck No.246
Ticket No.5884
Time 8:50
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD at Line 12
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M584 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 35,500 2,820 2
M585 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 48,000 3,820 1
M586 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 56,500 4,490 1
M587 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 57,500 4,570 2
M588 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 59,000 4,690 1
Slump (in.)6 1/2,6
Air Temp. (F.)74
Conc Temp (F)68
Truck No.253
Ticket No.8398
Time 9:45
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD at Line 8
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
N639 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 31,000 2,470 2
N640 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 42,500 3,380 1
N641 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 53,000 4,220 1
N642 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 55,000 4,380 2
N643 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 56,000 4,460 1
Slump (in.)7,6 1/2
Air Temp. (F.)76
Conc Temp (F)70
Truck No.202
Ticket No.8404
Time 10:25
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD at Line 4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M567 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,000 3,180 1
M568 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 46,000 3,660 2
M569 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 54,000 4,300 1
M570 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 57,000 4,530 2
M571 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 58,000 4,610 1
Slump (in.)7
Air Temp. (F.)77
Conc Temp (F)65
Truck No.244
Ticket No.8420
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:SOD at Line 1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M614 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,500 3,220 1
M615 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 47,500 3,780 2
M616 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 54,000 4,300 1
M617 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 55,000 4,380 2
M618 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 58,000 4,610 1
Slump (in.)7
Air Temp. (F.)80
Conc Temp (F)71
Truck No.233
Ticket No.8429
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, Pump Mix. Cylinders Received 7-10-19. Early Morning Rate: 6:00-
7:00AM
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Joe Simard No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Level 64, Line 19-1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)5-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8" *No. Of Sets: 6 252CUBIC YARDS:
SET 1 LOCATION:SOD at Line 19
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M619 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 36,500 2,900 2
M620 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 49,000 3,900 1
M621 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 54,000 4,300 1
M622 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 53,000 4,220 2
M623 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 57,500 4,570 1
Slump (in.)7
Air Temp. (F.)70
Conc Temp (F)63
Truck No.233
Ticket No.8373
Time 7:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD at Line 15
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M595 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 37,000 2,940 2
M596 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 48,000 3,820 2
M597 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 57,500 4,570 3
M598 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 56,500 4,490 2
M599 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 58,000 4,610 1
Slump (in.)7
Air Temp. (F.)72
Conc Temp (F)65
Truck No.246
Ticket No.5884
Time 8:50
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD at Line 12
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M584 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 35,500 2,820 2
M585 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 48,000 3,820 1
M586 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 56,500 4,490 1
M587 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 57,500 4,570 2
M588 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 59,000 4,690 1
Slump (in.)6 1/2,6
Air Temp. (F.)74
Conc Temp (F)68
Truck No.253
Ticket No.8398
Time 9:45
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD at Line 8
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
N639 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 31,000 2,470 2
N640 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 42,500 3,380 1
N641 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 53,000 4,220 1
N642 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 55,000 4,380 2
N643 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 56,000 4,460 1
Slump (in.)7,6 1/2
Air Temp. (F.)76
Conc Temp (F)70
Truck No.202
Ticket No.8404
Time 10:25
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:SOD at Line 4
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M567 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,000 3,180 1
M568 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 46,000 3,660 2
M569 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 54,000 4,300 1
M570 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 57,000 4,530 2
M571 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 58,000 4,610 1
Slump (in.)7
Air Temp. (F.)77
Conc Temp (F)65
Truck No.244
Ticket No.8420
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:SOD at Line 1
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
M614 4.00 x 8.00 12.57 Good 07/09/19 07/16/19 7 40,500 3,220 1
M615 4.00 x 8.00 12.57 Good 07/09/19 07/23/19 14 47,500 3,780 2
M616 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 54,000 4,300 1
M617 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 55,000 4,380 2
M618 4.00 x 8.00 12.57 Good 07/09/19 08/06/19 28 58,000 4,610 1
Slump (in.)7
Air Temp. (F.)80
Conc Temp (F)71
Truck No.233
Ticket No.8429
Time 1:00
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Light-Weight, MRWR, Pump Mix. Cylinders Received 7-10-19. Early Morning Rate: 6:00-
7:00AM
Inspector Premium Travel
Name Time Hours Time
Jordan Depina No Max Day .5 Hr(s)
Joe Simard No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019Compressive Strength Report - Concrete
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD; Level 64, Line 19-1
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX
Slump Specification (in.)5-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-09-2019
Report No.28
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-12-2020Concrete Field Report
Report No.28
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 6 sets of cylinders cast on 02/11/20 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Michael Callahan No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:5000# 3/8"No. Of Sets: 4 165CUBIC YARDS:
SET 1 LOCATION:SOD level 64 at 31
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T887 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 46,500 3,700 2
T888 4.00 x 8.00 12.57 Good 07/24/19 08/07/19 14 58,000 4,610 2
T889 4 x 8 12.57 Good 07/24/19 08/21/19 28
T890 4 x 8 12.57 Good 07/24/19 08/21/19 28
T891 4 x 8 12.57 Good 07/24/19 08/21/19 28
Slump (in.)7, 6
Air Temp. (F.)66
Conc Temp (F)79
Truck No.200
Ticket No.9002
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD level 64 at 37
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T872 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 44,000 3,500 1
T873 4.00 x 8.00 12.57 Good 07/24/19 08/07/19 14 57,500 4,570 1
T874 4 x 8 12.57 Good 07/24/19 08/21/19 28
T875 4 x 8 12.57 Good 07/24/19 08/21/19 28
T876 4 x 8 12.57 Good 07/24/19 08/21/19 28
Slump (in.)7, 6
Air Temp. (F.)67
Conc Temp (F)80
Truck No.253
Ticket No.9029
Time 8:35
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD level 64 at 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T902 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 45,000 3,580 2
T903 4.00 x 8.00 12.57 Good 07/24/19 08/07/19 14 55,000 4,380 2
T904 4 x 8 12.57 Good 07/24/19 08/21/19 28
T905 4 x 8 12.57 Good 07/24/19 08/21/19 28
T906 4 x 8 12.57 Good 07/24/19 08/21/19 28
Slump (in.)*
Air Temp. (F.)73
Conc Temp (F)79
Truck No.188
Ticket No.9039
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD level 64 at 49
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T892 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 42,000 3,340 1
T893 4.00 x 8.00 12.57 Good 07/24/19 08/07/19 14 55,000 4,380 1
T894 4 x 8 12.57 Good 07/24/19 08/21/19 28
T895 4 x 8 12.57 Good 07/24/19 08/21/19 28
T896 4 x 8 12.57 Good 07/24/19 08/21/19 28
Slump (in.)6, 5
Air Temp. (F.)73
Conc Temp (F)81
Truck No.249
Ticket No.9050
Time 10:35
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Two slumps set 3 - 6 1/2, 5/2. Same day call in. Cylinders received on 7-28-19.
Inspector Premium Travel
Name Time Hours Time
D. Montello No Min Day .5 Hr(s)
Zean Bradley No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD level 64 at 19-53
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019
Report No.29
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:5000# 3/8"No. Of Sets: 4 165CUBIC YARDS:
SET 1 LOCATION:SOD level 64 at 31
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T887 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 46,500 3,700 2
T888 4 x 8 12.57 Good 07/24/19 08/07/19 14
T889 4 x 8 12.57 Good 07/24/19 08/21/19 28
T890 4 x 8 12.57 Good 07/24/19 08/21/19 28
T891 4 x 8 12.57 Good 07/24/19 08/21/19 28
Slump (in.)7, 6
Air Temp. (F.)66
Conc Temp (F)79
Truck No.200
Ticket No.9002
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD level 64 at 37
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T872 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 44,000 3,500 1
T873 4 x 8 12.57 Good 07/24/19 08/07/19 14
T874 4 x 8 12.57 Good 07/24/19 08/21/19 28
T875 4 x 8 12.57 Good 07/24/19 08/21/19 28
T876 4 x 8 12.57 Good 07/24/19 08/21/19 28
Slump (in.)7, 6
Air Temp. (F.)67
Conc Temp (F)80
Truck No.253
Ticket No.9029
Time 8:35
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD level 64 at 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T902 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 45,000 3,580 2
T903 4 x 8 12.57 Good 07/24/19 08/07/19 14
T904 4 x 8 12.57 Good 07/24/19 08/21/19 28
T905 4 x 8 12.57 Good 07/24/19 08/21/19 28
T906 4 x 8 12.57 Good 07/24/19 08/21/19 28
Slump (in.)*
Air Temp. (F.)73
Conc Temp (F)79
Truck No.188
Ticket No.9039
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD level 64 at 49
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T892 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 42,000 3,340 1
T893 4 x 8 12.57 Good 07/24/19 08/07/19 14
T894 4 x 8 12.57 Good 07/24/19 08/21/19 28
T895 4 x 8 12.57 Good 07/24/19 08/21/19 28
T896 4 x 8 12.57 Good 07/24/19 08/21/19 28
Slump (in.)6, 5
Air Temp. (F.)73
Conc Temp (F)81
Truck No.249
Ticket No.9050
Time 10:35
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Two slumps set 3 - 6 1/2, 5/2. Same day call in. Cylinders received on 7-28-19.
Inspector Premium Travel
Name Time Hours Time
D. Montello No Min Day .5 Hr(s)
Zean Bradley No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD level 64 at 19-53
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019
Report No.29
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:5000# 3/8"No. Of Sets: 4 165CUBIC YARDS:
SET 1 LOCATION:SOD level 64 at 31
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T887 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 46,500 3,700 2
T888 4.00 x 8.00 12.57 Good 07/24/19 08/07/19 14 58,000 4,610 2
T889 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 75,000 5,970 1
T890 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 76,000 6,050 2
T891 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 78,000 6,210 1
Slump (in.)7, 6
Air Temp. (F.)66
Conc Temp (F)79
Truck No.200
Ticket No.9002
Time 8:00
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:SOD level 64 at 37
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T872 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 44,000 3,500 1
T873 4.00 x 8.00 12.57 Good 07/24/19 08/07/19 14 57,500 4,570 1
T874 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 70,000 5,570 2
T875 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 67,500 5,370 1
T876 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 69,000 5,490 2
Slump (in.)7, 6
Air Temp. (F.)67
Conc Temp (F)80
Truck No.253
Ticket No.9029
Time 8:35
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:SOD level 64 at 44
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T902 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 45,000 3,580 2
T903 4.00 x 8.00 12.57 Good 07/24/19 08/07/19 14 55,000 4,380 2
T904 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 71,000 5,650 1
T905 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 68,000 5,410 1
T906 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 71,000 5,650 2
Slump (in.)*
Air Temp. (F.)73
Conc Temp (F)79
Truck No.188
Ticket No.9039
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:SOD level 64 at 49
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
T892 4.00 x 8.00 12.57 Good 07/24/19 07/31/19 7 42,000 3,340 1
T893 4.00 x 8.00 12.57 Good 07/24/19 08/07/19 14 55,000 4,380 1
T894 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 67,000 5,330 1
T895 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 70,000 5,570 2
T896 4.00 x 8.00 12.57 Good 07/24/19 08/21/19 28 69,500 5,530 1
Slump (in.)6, 5
Air Temp. (F.)73
Conc Temp (F)81
Truck No.249
Ticket No.9050
Time 10:35
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*Two slumps set 3 - 6 1/2, 5/2. Same day call in. Cylinders received on 7-28-19.
Inspector Premium Travel
Name Time Hours Time
D. Montello No Min Day .5 Hr(s)
Zean Bradley No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019Compressive Strength Report - Concrete
Report No.29
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:SOD level 64 at 19-53
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 to 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 07-24-2019
Report No.29
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 40CUBIC YARDS:
SET 1 LOCATION:Footing - Line B at 11.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q374 4.00 x 8.00 12.57 Good 10/09/18 10/16/18 7 35,000 2,780 2
Q375 4 x 8 12.57 Good 10/09/18 10/23/18 14
Q376 4 x 8 12.57 Good 10/09/18 11/06/18 28
Q377 4 x 8 12.57 Good 10/09/18 11/06/18 28
Slump (in.)6
Air Temp. (F.)79
Conc Temp (F)71
Truck No.179
Ticket No.4422
Time 1:26
Unit Wt lbs/cu ft
Air Content (%)6.9
GENERAL REMARKS:*MR, EA
Inspector Premium Travel
Name Time Hours Time
Greg Quinno No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
FIELD SUMMARY REPORT
Total Pour:Footing - Line B-K.6 at 1-12
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Caps
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018
Report No.3
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 40CUBIC YARDS:
SET 1 LOCATION:Footing - Line B at 11.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q374 4.00 x 8.00 12.57 Good 10/09/18 10/16/18 7 35,000 2,780 2
Q375 4.00 x 8.00 12.57 Good 10/09/18 10/23/18 14 46,500 3,700 1
Q376 4 x 8 12.57 Good 10/09/18 11/06/18 28
Q377 4 x 8 12.57 Good 10/09/18 11/06/18 28
Slump (in.)6
Air Temp. (F.)79
Conc Temp (F)71
Truck No.179
Ticket No.4422
Time 1:26
Unit Wt lbs/cu ft
Air Content (%)6.9
GENERAL REMARKS:*MR, EA
Inspector Premium Travel
Name Time Hours Time
Greg Quinno No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
FIELD SUMMARY REPORT
Total Pour:Footing - Line B-K.6 at 1-12
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Caps
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018
Report No.3
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 40CUBIC YARDS:
SET 1 LOCATION:Footing - Line B at 11.5
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q374 4.00 x 8.00 12.57 Good 10/09/18 10/16/18 7 35,000 2,780 2
Q375 4.00 x 8.00 12.57 Good 10/09/18 10/23/18 14 46,500 3,700 1
Q376 4.00 x 8.00 12.57 Good 10/09/18 11/06/18 28 54,000 4,300 1
Q377 4.00 x 8.00 12.57 Good 10/09/18 11/06/18 28 57,500 4,570 2
Slump (in.)6
Air Temp. (F.)79
Conc Temp (F)71
Truck No.179
Ticket No.4422
Time 1:26
Unit Wt lbs/cu ft
Air Content (%)6.9
GENERAL REMARKS:*MR, EA
Inspector Premium Travel
Name Time Hours Time
Greg Quinno No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018Compressive Strength Report - Concrete
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. MacLellan
FIELD SUMMARY REPORT
Total Pour:Footing - Line B-K.6 at 1-12
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Caps
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-09-2018
Report No.3
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-11-2018Concrete Field Report
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported one set of cylinders cast on 10/09/2018 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Jeffery Maddaleni No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Reinforcing Steel Report
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:12:00 pm
TIME OF CONCRETE PLACEMENT:
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):18-3047 dated 8-24-18; R-1
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Wall, line 22-29 at A, F-H3
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Reinforcing Steel Report
Report No.3
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-24-2019Compressive Strength Report - Concrete
Report No.30
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 26CUBIC YARDS:
SET 1 LOCATION:Garage piers: 11-21
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V044 4.00 x 8.00 12.57 Good 09/24/19 10/01/19 7 45,000 3,580 3
V045 4.00 x 8.00 12.57 Good 09/24/19 10/08/19 14 56,000 4,460 2
V046 4 x 8 12.57 Good 09/24/19 10/22/19 28
V047 4 x 8 12.57 Good 09/24/19 10/22/19 28
V048 4 x 8 12.57 Good 09/24/19 10/22/19 28
Slump (in.)5 1/2
Air Temp. (F.)75
Conc Temp (F)83
Truck No.254
Ticket No.2143
Time 1:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Same Day Call In. Cylinders received on 9/26/19.
Inspector Premium Travel
Name Time Hours Time
Conner Welch No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-24-2019Compressive Strength Report - Concrete
Report No.30
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-24-2019Compressive Strength Report - Concrete
Report No.30
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Garage piers: 11-21
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 - 7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-24-2019
Report No.30
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-24-2019Compressive Strength Report - Concrete
Report No.30
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 26CUBIC YARDS:
SET 1 LOCATION:Garage piers: 11-21
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V044 4.00 x 8.00 12.57 Good 09/24/19 10/01/19 7 45,000 3,580 3
V045 4 x 8 12.57 Good 09/24/19 10/08/19 14
V046 4 x 8 12.57 Good 09/24/19 10/22/19 28
V047 4 x 8 12.57 Good 09/24/19 10/22/19 28
V048 4 x 8 12.57 Good 09/24/19 10/22/19 28
Slump (in.)5 1/2
Air Temp. (F.)75
Conc Temp (F)83
Truck No.254
Ticket No.2143
Time 1:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Same Day Call In. Cylinders received on 9/26/19.
Inspector Premium Travel
Name Time Hours Time
Conner Welch No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-24-2019Compressive Strength Report - Concrete
Report No.30
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-24-2019Compressive Strength Report - Concrete
Report No.30
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Garage piers: 11-21
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 - 7
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 09-24-2019
Report No.30
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-11-2020Compressive Strength Report - Concrete
Report No.31
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/8"No. Of Sets: 6 275CUBIC YARDS:
SET 1 LOCATION:Slab on deck, slab 23, Southwest corner
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q799 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 34,000 2,700 2
Q800 4 x 8 12.57 Good 02/11/20 02/25/20 14
Q801 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q802 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q803 4 x 8 12.57 Good 02/11/20 03/10/20 28
Slump (in.)8
Air Temp. (F.)37
Conc Temp (F)78
Truck No.242
Ticket No.168039
Time 5:05
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Slab on deck, slab 23, West wall
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q794 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 45,000 3,580 6
Q795 4 x 8 12.57 Good 02/11/20 02/25/20 14
Q796 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q797 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q798 4 x 8 12.57 Good 02/11/20 03/10/20 28
Slump (in.)7 1/4
Air Temp. (F.)37
Conc Temp (F)79
Truck No.231
Ticket No.168043
Time 5:45
Unit Wt lbs/cu ft
Air Content (%)
SET 3 LOCATION:Slab on deck, slab 23, Northwest
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q874 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 37,500 2,980 6
Q875 4 x 8 12.57 Good 02/11/20 02/25/20 14
Q876 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q877 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q878 4 x 8 12.57 Good 02/11/20 03/10/20 28
Slump (in.)7
Air Temp. (F.)37
Conc Temp (F)78
Truck No.242
Ticket No.168048
Time 6:45
Unit Wt lbs/cu ft
Air Content (%)
SET 4 LOCATION:Slab on deck, slab 23, Southeast
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-11-2020Compressive Strength Report - Concrete
Report No.31
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q804 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 37,500 2,980 3
Q805 4 x 8 12.57 Good 02/11/20 02/25/20 14
Q806 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q807 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q808 4 x 8 12.57 Good 02/11/20 03/10/20 28
Slump (in.)7 1/2
Air Temp. (F.)37
Conc Temp (F)77
Truck No.231
Ticket No.168053
Time 7:25
Unit Wt lbs/cu ft
Air Content (%)
SET 5 LOCATION:Slab on deck, slab 23, Northeast
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q824 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 35,000 2,780 6
Q825 4 x 8 12.57 Good 02/11/20 02/25/20 14
Q826 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q827 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q828 4 x 8 12.57 Good 02/11/20 03/10/20 28
Slump (in.)7 1/2
Air Temp. (F.)39
Conc Temp (F)79
Truck No.200
Ticket No.168060
Time 8:40
Unit Wt lbs/cu ft
Air Content (%)
SET 6 LOCATION:Slab on deck, slab 23, East
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Q809 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 35,000 2,780 6
Q810 4 x 8 12.57 Good 02/11/20 02/25/20 14
Q811 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q812 4 x 8 12.57 Good 02/11/20 03/10/20 28
Q813 4 x 8 12.57 Good 02/11/20 03/10/20 28
Slump (in.)7 1/2
Air Temp. (F.)39
Conc Temp (F)78
Truck No.232
Ticket No.168068
Time 9:35
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 02/12/2020; early morning rate charged 4:30 AM to 7:00 AM.
Inspector Premium Travel
Name Time Hours Time
Thomas Cunningham No Max Day .5 Hr(s)
Mark Geraci No Max Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-11-2020Compressive Strength Report - Concrete
Report No.31
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-11-2020Compressive Strength Report - Concrete
Report No.31
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Slab on deck, slab 23
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other Inside building
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)6-8
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-11-2020
Report No.31
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 6
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 02-11-2020
Report No.31
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 18CUBIC YARDS:
SET 1 LOCATION:Wall, line 22-29 at A, F-H3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V056 4.00 x 8.00 12.57 Good 10/18/18 10/25/18 7 32,000 2,550 1
V057 4.00 x 8.00 12.57 Good 10/18/18 11/01/18 14 45,000 3,580 2
V058 4.00 x 8.00 12.57 Good 10/18/18 11/15/18 28 58,000 4,610 1
V059 4.00 x 8.00 12.57 Good 10/18/18 11/15/18 28 60,500 4,810 2
V060 4.00 x 8.00 12.57 Good 10/18/18 11/15/18 28 57,500 4,570 1
Slump (in.)6
Air Temp. (F.)45
Conc Temp (F)57
Truck No.186
Ticket No.4551
Time 2:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MR
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
FIELD SUMMARY REPORT
Total Pour:Wall, line 22-29 at A, F-H3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other Styrofoam
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam box
Slump Specification (in.)6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018
Report No.4
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 18CUBIC YARDS:
SET 1 LOCATION:Wall, line 22-29 at A, F-H3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V056 4.00 x 8.00 12.57 Good 10/18/18 10/25/18 7 32,000 2,550 1
V057 4.00 x 8.00 12.57 Good 10/18/18 11/01/18 14 45,000 3,580 2
V058 4 x 8 12.57 Good 10/18/18 11/15/18 28
V059 4 x 8 12.57 Good 10/18/18 11/15/18 28
V060 4 x 8 12.57 Good 10/18/18 11/15/18 28
Slump (in.)6
Air Temp. (F.)45
Conc Temp (F)57
Truck No.186
Ticket No.4551
Time 2:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MR
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
FIELD SUMMARY REPORT
Total Pour:Wall, line 22-29 at A, F-H3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other Styrofoam
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam box
Slump Specification (in.)6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018
Report No.4
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 18CUBIC YARDS:
SET 1 LOCATION:Wall, line 22-29 at A, F-H3
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V056 4.00 x 8.00 12.57 Good 10/18/18 10/25/18 7 32,000 2,550 1
V057 4 x 8 12.57 Good 10/18/18 11/01/18 14
V058 4 x 8 12.57 Good 10/18/18 11/15/18 28
V059 4 x 8 12.57 Good 10/18/18 11/15/18 28
V060 4 x 8 12.57 Good 10/18/18 11/15/18 28
Slump (in.)6
Air Temp. (F.)45
Conc Temp (F)57
Truck No.186
Ticket No.4551
Time 2:10
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MR
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018Compressive Strength Report - Concrete
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.MacLellan
FIELD SUMMARY REPORT
Total Pour:Wall, line 22-29 at A, F-H3
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field
X Other Styrofoam
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam box
Slump Specification (in.)6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-18-2018
Report No.4
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-17-2018Concrete Field Report
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 10/16/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Alex Garcia No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-29-2020IFC FIRESTOPPING INSPECTION
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:6:30 AM
CONTACT:Dennis Prescott
SUMMARY:
Attached is the IFC firestopping inspection report prepared by UTS inspector Eric McFadden for the
above project.
GENERAL REMARKS:IFC Firestopping Inspection
Inspector Premium Travel
Name Time Hours Time
Eric McFadden No 4.00 .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
UTS of Massachusetts, Inc. Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-29-2020
Report No.4
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-29-2020
Report No.4
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-29-2020
Report No.4
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
UTS of Massachusetts, Inc. Page 5
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 01-29-2020
Report No.4
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Reinforcing Steel Report
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:11:00 AM
TIME OF CONCRETE PLACEMENT:2:50 PM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R-1, rev. #6, dated 08/17/2017
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Footing, column lines A20-A32
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Tory Ward No Max Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Reinforcing Steel Report
Report No.4
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 22CUBIC YARDS:
SET 1 LOCATION:Footing, column line A20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
S460 4.00 x 8.00 12.57 Good 10/16/18 10/23/18 7 27,000 2,150 1
S461 4 x 8 12.57 Good 10/16/18 10/30/18 14
S462 4 x 8 12.57 Good 10/16/18 11/13/18 28
S463 4 x 8 12.57 Good 10/16/18 11/13/18 28
S464 4 x 8 12.57 Good 10/16/18 11/13/18 28
Slump (in.)4 1/2
Air Temp. (F.)55
Conc Temp (F)61
Truck No.179
Ticket No.084494
Time 2:50
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Tory Ward No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines A20-A32
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018
Report No.5
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 22CUBIC YARDS:
SET 1 LOCATION:Footing, column line A20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
S460 4.00 x 8.00 12.57 Good 10/16/18 10/23/18 7 27,000 2,150 1
S461 4.00 x 8.00 12.57 Good 10/16/18 10/30/18 14 37,500 2,980 2
S462 4.00 x 8.00 12.57 Good 10/16/18 11/13/18 28 50,000 3,980 1
S463 4.00 x 8.00 12.57 Good 10/16/18 11/13/18 28 48,000 3,820 2
S464 4.00 x 8.00 12.57 Good 10/16/18 11/13/18 28 51,000 4,060 1
Slump (in.)4 1/2
Air Temp. (F.)55
Conc Temp (F)61
Truck No.179
Ticket No.084494
Time 2:50
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Tory Ward No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines A20-A32
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018
Report No.5
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 22CUBIC YARDS:
SET 1 LOCATION:Footing, column line A20
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
S460 4.00 x 8.00 12.57 Good 10/16/18 10/23/18 7 27,000 2,150 1
S461 4.00 x 8.00 12.57 Good 10/16/18 10/30/18 14 37,500 2,980 2
S462 4 x 8 12.57 Good 10/16/18 11/13/18 28
S463 4 x 8 12.57 Good 10/16/18 11/13/18 28
S464 4 x 8 12.57 Good 10/16/18 11/13/18 28
Slump (in.)4 1/2
Air Temp. (F.)55
Conc Temp (F)61
Truck No.179
Ticket No.084494
Time 2:50
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Tory Ward No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018Compressive Strength Report - Concrete
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, column lines A20-A32
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-16-2018
Report No.5
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-22-2018Concrete Field Report
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 2 sets of cylinders 1 cast on 10/18/18 and 1 cast on 10/19/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Alex Garcia No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Reinforcing Steel Report
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:12:30 pm
TIME OF CONCRETE PLACEMENT:4:25 pm
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R1.6, dated 8-17-17
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Footing, line 7 at N-M, 7 at U-M
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Tory Ward No Max Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Reinforcing Steel Report
Report No.5
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 28CUBIC YARDS:
SET 1 LOCATION:Footing, line 7 at N-M
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V061 4.00 x 8.00 12.57 Good 10/19/18 10/26/18 7 29,000 2,310 1
V062 4.00 x 8.00 12.57 Good 10/19/18 11/02/18 14 48,000 3,820 1
V063 4.00 x 8.00 12.57 Good 10/19/18 11/16/18 28 58,500 4,650 2
V064 4.00 x 8.00 12.57 Good 10/19/18 11/16/18 28 58,000 4,610 1
V065 4.00 x 8.00 12.57 Good 10/19/18 11/16/18 28 54,000 4,300 2
Slump (in.)4 1/2
Air Temp. (F.)56
Conc Temp (F)59
Truck No.200
Ticket No.4586
Time 4:35
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Tory Ward No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, line 7 at N-M, 7 at U-M
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:Manual
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018
Report No.6
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 28CUBIC YARDS:
SET 1 LOCATION:Footing, line 7 at N-M
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V061 4.00 x 8.00 12.57 Good 10/19/18 10/26/18 7 29,000 2,310 1
V062 4.00 x 8.00 12.57 Good 10/19/18 11/02/18 14 48,000 3,820 1
V063 4 x 8 12.57 Good 10/19/18 11/16/18 28
V064 4 x 8 12.57 Good 10/19/18 11/16/18 28
V065 4 x 8 12.57 Good 10/19/18 11/16/18 28
Slump (in.)4 1/2
Air Temp. (F.)56
Conc Temp (F)59
Truck No.200
Ticket No.4586
Time 4:35
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Tory Ward No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, line 7 at N-M, 7 at U-M
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:Manual
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018
Report No.6
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 28CUBIC YARDS:
SET 1 LOCATION:Footing, line 7 at N-M
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
V061 4.00 x 8.00 12.57 Good 10/19/18 10/26/18 7 29,000 2,310 1
V062 4 x 8 12.57 Good 10/19/18 11/02/18 14
V063 4 x 8 12.57 Good 10/19/18 11/16/18 28
V064 4 x 8 12.57 Good 10/19/18 11/16/18 28
V065 4 x 8 12.57 Good 10/19/18 11/16/18 28
Slump (in.)4 1/2
Air Temp. (F.)56
Conc Temp (F)59
Truck No.200
Ticket No.4586
Time 4:35
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Tory Ward No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018Compressive Strength Report - Concrete
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footing, line 7 at N-M, 7 at U-M
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:Manual
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-19-2018
Report No.6
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-25-2018Concrete Field Report
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 10/23/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Justin Morales No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-25-2018Concrete Field Report
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 10/23/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Justin Morales No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Reinforcing Steel Report
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault/Jason Blaise
TIME OF INSPECTION:12:00 pm
TIME OF CONCRETE PLACEMENT:12:30 pm
SPECIFICATION:ASTM A615 Grade 40 Grade 60 x Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:S1.02, S2.01
REVISION NUMBER:DATED:
SHOP DRAWING(S):
PROJECT SPECIFICATIONS:03300
OTHER:
xDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Footings: column lines M1-G at 1-16;
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x
Clearance x
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x
Bar Supports x
Bar Spacing x
Bar Quantity x
Placement and tying x
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Rocky Benedetto No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Reinforcing Steel Report
Report No.6
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 17CUBIC YARDS:
SET 1 LOCATION:V10 and M7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W783 4.00 x 8.00 12.57 Good 10/23/18 10/30/18 7 32,000 2,550 1
W784 4.00 x 8.00 12.57 Good 10/23/18 11/06/18 14 44,000 3,500 1
W785 4.00 x 8.00 12.57 Good 10/23/18 11/20/18 28 59,000 4,690 2
W786 4.00 x 8.00 12.57 Good 10/23/18 11/20/18 28 58,500 4,650 2
W787 4.00 x 8.00 12.57 Good 10/23/18 11/20/18 28 56,000 4,460 1
Slump (in.)6
Air Temp. (F.)54
Conc Temp (F)60
Truck No.180
Ticket No.4628
Time 1:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR. Same day call in.
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, V10-M7
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam on top, plastic bag
Slump Specification (in.)6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018
Report No.7
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 17CUBIC YARDS:
SET 1 LOCATION:V10 and M7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W783 4.00 x 8.00 12.57 Good 10/23/18 10/30/18 7 32,000 2,550 1
W784 4.00 x 8.00 12.57 Good 10/23/18 11/06/18 14 44,000 3,500 1
W785 4 x 8 12.57 Good 10/23/18 11/20/18 28
W786 4 x 8 12.57 Good 10/23/18 11/20/18 28
W787 4 x 8 12.57 Good 10/23/18 11/20/18 28
Slump (in.)6
Air Temp. (F.)54
Conc Temp (F)60
Truck No.180
Ticket No.4628
Time 1:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR. Same day call in.
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, V10-M7
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam on top, plastic bag
Slump Specification (in.)6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018
Report No.7
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4" *No. Of Sets:1 17CUBIC YARDS:
SET 1 LOCATION:V10 and M7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
W783 4.00 x 8.00 12.57 Good 10/23/18 10/30/18 7 32,000 2,550 1
W784 4 x 8 12.57 Good 10/23/18 11/06/18 14
W785 4 x 8 12.57 Good 10/23/18 11/20/18 28
W786 4 x 8 12.57 Good 10/23/18 11/20/18 28
W787 4 x 8 12.57 Good 10/23/18 11/20/18 28
Slump (in.)6
Air Temp. (F.)54
Conc Temp (F)60
Truck No.180
Ticket No.4628
Time 1:30
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR. Same day call in.
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Min Day .5 Hr(s)
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018Compressive Strength Report - Concrete
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, V10-M7
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam on top, plastic bag
Slump Specification (in.)6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-23-2018
Report No.7
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-30-2018Concrete Field Report
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 1 set of cylinders cast on 10/26/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Reinforcing Steel Report
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Dazle
TIME OF INSPECTION:7:00 AM
TIME OF CONCRETE PLACEMENT:8:00 AM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R1, dated 08/24/2018
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Wall, HS102 - all walls
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No Max Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Reinforcing Steel Report
Report No.7
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 10CUBIC YARDS:
SET 1 LOCATION:Footing: column line K.7 at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z718 4.00 x 8.00 12.57 Good 10/26/18 11/02/18 7 31,000 2,470 2
Z719 4.00 x 8.00 12.57 Good 10/26/18 11/09/18 14 41,000 3,260 2
Z720 4.00 x 8.00 12.57 Good 10/26/18 11/23/18 28 52,000 4,140 1
Z721 4.00 x 8.00 12.57 Good 10/26/18 11/23/18 28 50,500 4,020 2
Z722 4.00 x 8.00 12.57 Good 10/26/18 11/23/18 28 53,000 4,220 1
Slump (in.)4
Air Temp. (F.)44
Conc Temp (F)57
Truck No.241
Ticket No.6956
Time 1:05
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 10/31/18.
Inspector Premium Travel
Name Time Hours Time
Rocky Benedetto No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footings: column line M1-G at 1-16
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 - 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018
Report No.8
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 10CUBIC YARDS:
SET 1 LOCATION:Footing: column line K.7 at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z718 4.00 x 8.00 12.57 Good 10/26/18 11/02/18 7 31,000 2,470 2
Z719 4.00 x 8.00 12.57 Good 10/26/18 11/09/18 14 41,000 3,260 2
Z720 4 x 8 12.57 Good 10/26/18 11/23/18 28
Z721 4 x 8 12.57 Good 10/26/18 11/23/18 28
Z722 4 x 8 12.57 Good 10/26/18 11/23/18 28
Slump (in.)4
Air Temp. (F.)44
Conc Temp (F)57
Truck No.241
Ticket No.6956
Time 1:05
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 10/31/18.
Inspector Premium Travel
Name Time Hours Time
Rocky Benedetto No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footings: column line M1-G at 1-16
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 - 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018
Report No.8
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"No. Of Sets:1 10CUBIC YARDS:
SET 1 LOCATION:Footing: column line K.7 at 7
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
Z718 4.00 x 8.00 12.57 Good 10/26/18 11/02/18 7 31,000 2,470 2
Z719 4 x 8 12.57 Good 10/26/18 11/09/18 14
Z720 4 x 8 12.57 Good 10/26/18 11/23/18 28
Z721 4 x 8 12.57 Good 10/26/18 11/23/18 28
Z722 4 x 8 12.57 Good 10/26/18 11/23/18 28
Slump (in.)4
Air Temp. (F.)44
Conc Temp (F)57
Truck No.241
Ticket No.6956
Time 1:05
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:Cylinders received on 10/31/18.
Inspector Premium Travel
Name Time Hours Time
Rocky Benedetto No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018Compressive Strength Report - Concrete
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Footings: column line M1-G at 1-16
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat NoneX
Other
Slump Specification (in.)4 - 6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-26-2018
Report No.8
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-01-2018Concrete Field Report
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 2 sets of cylinders cast on 10/31/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Reinforcing Steel Report
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:7:00 AM
TIME OF CONCRETE PLACEMENT:Unscheduled
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R1-R9
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Wall foundation: lines Y3/51-39, Y3/Z6/51, W/15-Z6;
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )X X X X X
Clearance X
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)X
Bar Supports X
Bar Spacing X
Bar Quantity X
Placement and tying X
X The details in the above described area(s) were complete at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Reinforcing steel installation is complete and acceptable.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
L. Bastoni No Min Day .5 Hr(s)
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-16-2018Reinforcing Steel Report
Report No.8
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:2 50CUBIC YARDS:
SET 1 LOCATION:Wall, HS102
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
B061 4.00 x 8.00 12.57 Good 10/31/18 11/07/18 7 27,000 2,150 1
B062 4.00 x 8.00 12.57 Good 10/31/18 11/14/18 14 38,000 3,020 2
B063 4.00 x 8.00 12.57 Good 10/31/18 11/28/18 28 53,000 4,220 2
B064 4.00 x 8.00 12.57 Good 10/31/18 11/28/18 28 51,500 4,100 1
B065 4.00 x 8.00 12.57 Good 10/31/18 11/28/18 28 51,000 4,060 2
Slump (in.)5 1/2
Air Temp. (F.)30
Conc Temp (F)53
Truck No.233
Ticket No.027062
Time 9:20
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall, HS102
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
B056 4.00 x 8.00 12.57 Good 10/31/18 11/07/18 7 25,000 1,990 2
B057 4.00 x 8.00 12.57 Good 10/31/18 11/14/18 14 34,000 2,700 1
B058 4.00 x 8.00 12.57 Good 10/31/18 11/28/18 28 51,000 4,060 3
B059 4.00 x 8.00 12.57 Good 10/31/18 11/28/18 28 49,000 3,900 2
B060 4.00 x 8.00 12.57 Good 10/31/18 11/28/18 28 50,500 4,020 1
Slump (in.)5 1/2
Air Temp. (F.)36
Conc Temp (F)57
Truck No.243
Ticket No.027067
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR, DCEM155.
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, HS102 - all walls
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam box
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018
Report No.9
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:2 50CUBIC YARDS:
SET 1 LOCATION:Wall, HS102
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
B061 4.00 x 8.00 12.57 Good 10/31/18 11/07/18 7 27,000 2,150 1
B062 4.00 x 8.00 12.57 Good 10/31/18 11/14/18 14 38,000 3,020 2
B063 4 x 8 12.57 Good 10/31/18 11/28/18 28
B064 4 x 8 12.57 Good 10/31/18 11/28/18 28
B065 4 x 8 12.57 Good 10/31/18 11/28/18 28
Slump (in.)5 1/2
Air Temp. (F.)30
Conc Temp (F)53
Truck No.233
Ticket No.027062
Time 9:20
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall, HS102
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
B056 4.00 x 8.00 12.57 Good 10/31/18 11/07/18 7 25,000 1,990 2
B057 4.00 x 8.00 12.57 Good 10/31/18 11/14/18 14 34,000 2,700 1
B058 4 x 8 12.57 Good 10/31/18 11/28/18 28
B059 4 x 8 12.57 Good 10/31/18 11/28/18 28
B060 4 x 8 12.57 Good 10/31/18 11/28/18 28
Slump (in.)5 1/2
Air Temp. (F.)36
Conc Temp (F)57
Truck No.243
Ticket No.027067
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR, DCEM155.
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, HS102 - all walls
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam box
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018
Report No.9
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064
C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS CONCRETE:3000# 3/4"*No. Of Sets:2 50CUBIC YARDS:
SET 1 LOCATION:Wall, HS102
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
B061 4.00 x 8.00 12.57 Good 10/31/18 11/07/18 7 27,000 2,150 1
B062 4 x 8 12.57 Good 10/31/18 11/14/18 14
B063 4 x 8 12.57 Good 10/31/18 11/28/18 28
B064 4 x 8 12.57 Good 10/31/18 11/28/18 28
B065 4 x 8 12.57 Good 10/31/18 11/28/18 28
Slump (in.)5 1/2
Air Temp. (F.)30
Conc Temp (F)53
Truck No.233
Ticket No.027062
Time 9:20
Unit Wt lbs/cu ft
Air Content (%)
SET 2 LOCATION:Wall, HS102
Total Unit
Lab Size Area Date Date Age Load Load Fracture
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type
B056 4.00 x 8.00 12.57 Good 10/31/18 11/07/18 7 25,000 1,990 2
B057 4 x 8 12.57 Good 10/31/18 11/14/18 14
B058 4 x 8 12.57 Good 10/31/18 11/28/18 28
B059 4 x 8 12.57 Good 10/31/18 11/28/18 28
B060 4 x 8 12.57 Good 10/31/18 11/28/18 28
Slump (in.)5 1/2
Air Temp. (F.)36
Conc Temp (F)57
Truck No.243
Ticket No.027067
Time 11:40
Unit Wt lbs/cu ft
Air Content (%)
GENERAL REMARKS:*MRWR, DCEM155.
Inspector Premium Travel
Name Time Hours Time
Mark Geraci No
REVIEWED BY:Bryan M. Crabtree
FRACTURE TYPES
Type 1 Type 2 Type 3 Type 4 Type5 Type 6
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5
cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of
less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is
[25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed
throught caps on other end distinguish from
Type 1
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018Compressive Strength Report - Concrete
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Concrete Co.J.G. Maclellan
FIELD SUMMARY REPORT
Total Pour:Wall, HS102 - all walls
Method of Placement:Pump Chute Discharge Bucket OtherX
Other:
Vibrator OtherMethod of Concrete Consolidation:X
Other:
Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX
Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX
Other
Placement Protection:Thermal Blankets Heat None
OtherX Styrofoam box
Slump Specification (in.)4-6
Number of slumps out of specification reported to
If rejected
Approved by
Remarks:
UTS of Massachusetts, Inc. Page 4
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 10-31-2018
Report No.9
Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 WashingtonAttachment
-Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-21-2018Concrete Field Report
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
WEATHER:
TIME:
CONTACT:
SUMMARY:
Transported 2 sets of cylinders cast on 11/20/18 to the lab for testing.
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Alex Garcia No
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise
City of Salem Steve Cummings
Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Reinforcing Steel Report
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
CONTACT:Jeff Daigneault
TIME OF INSPECTION:12:30 PM
TIME OF CONCRETE PLACEMENT:1:00 PM
SPECIFICATION:ASTM A615 Grade 40 Grade 60 X Grade 75
ASTM A616 Grade 50 Grade 60
ASTM A617 Grade 40 Grade 60
CONTRACT DRAWINGS:
REVISION NUMBER:DATED:
SHOP DRAWING(S):R1-R9, rev. 0 dated 8/7/18
PROJECT SPECIFICATIONS:03300
OTHER:
XDRAWINGS STAMPED:YES NO
AREA REVIEWED:
Wall: lines I, 16-22; Z.3, I-J; Z.3-Y.3 at 30; Y.3, 30-30 (completed area of 11/27/18 placement);
Wall: lines Y.3, 32-52 (in process area of future placement; a reinspection will be required before
concrete placement);
REVIEWEDATTRIBUTES:
Yes No
Coverage (Top Bottom and/or Inside Face Outside Face )x x x x x
Clearance x
Cleanliness (heavy rust, scale, mud, dirt, oil, etc. not permitted)x
Bar Supports x
Bar Spacing x
Bar Quantity x
Placement and tying x
X The details in the above described area(s) were complete/in process at the time of this inspection.
X The results of this inspection were discussed with the aforementioned contact persons prior to departure from the project site.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-27-2018Reinforcing Steel Report
Report No.9
Distribution Copy Job Number 22528
Project 11 Dodge Street, Salem, MA
Hampton Inn Salem & 231 Washington
Contractor Opechee Construction
Reinforcing steel installation for the 11/27/18 placement is complete and acceptable;
installation for the future placement is in process, with a reinspection required
prior to placement.
NOTE: The areas inspected for today's concrete placement were only able to be viewed
from the top of form staging as the wall forms had been closed prior to scheduling of
this inspection.
The writer also reviewed the reinforcing steel installation at lines Y.3, 32-52 and
found wall steel to be approximately 50% complete, requiring a final inspection.GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
Mike Garland No Min Day .5 Hr(s)
REVIEWED BY:William P. Crabtree
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Dodge Area, llc Ken McClure
Opechee Construction Jeff Daigneault
Opechee Construction Jason Blaise