Const. Cont. Progress Checklist Construction Control Progress Checklist
r
it\ 5 To be submitted at completion of required site reviews for
rti +v construction progress per the 9th edition of the
Massachusetts State Building Code, 780 CMR,Section 107
Project Title: 65 Washington Street,4th and 5th Floors Date:February 12,2021
Property Address: 65 Washington Street,4th and 5th Floors,Salem,MA
I,Eric A.Cummings, MA Registration Number: 53348 Expiration date:6/22
am a registered design professional and I or my designee have observed the following work,and to the best of my
knowledge,information,and belief the construction work indicated below has been performed in a manner consistent with
the approved plans and specifications:
Required Site Review and Documentation for Portions or Phases Construction 14
(to be performed by the appropriate registered designprofessionall or his/her designee or M.G.L.c 112§81R contractor)
Site Review and Documentation X Site Review and Documentation X
Soil condition and analysis , Energy Efficiency Requirements
Footing and Foundation,including Reinforcement and Fire Alarm Installationz
Foundation attachment
Concrete Floor and Under Floor Fire Suppression Installation3
Lowest Floor Flood Elevation Field Reports5
Structural Frame—wall/floor/roof Carbon Monoxide Detection System"
Lath and Plaster/Gypsum Seismic reinforcement
Fire Resistant Wall/Partitions framing Smoke Control Systems(Special Inspection per Sections 909.3 and 909.18.8)
Fire Resistant Wall/Partitions finish attachments Smoke and Heat Vents
Above Ceiling inspection Accessibility(521 CMR)
Fire Blocking/Stopping System Other: Plumbing-Sovent System for 4th and 5th floors Only
Emergency Lighting/Exit Signage
Means of Egress Componenets Special Inspections(Section 1704):
Roofing,coping/System
Venting Systems(kitchen and cleanouts,chemical,fume)
Mechanical Systems
1.Indicate with an'x'the work you reviewed for compliance with the approved plans and specifications and describe in detail below.
2.Include NFPA 72 test and acceptance documentation
3.Include applicable NFPA 13,13R,13D,14,15,17,20,241,etc.-test and acceptance documentation.
4.Include NFPA 720 Record of Completion and Inspection and Test Form
5.Include field reports and related documentation
6.Nothing contained within construction control shall have the effect of waiving or limiting the building official's authority to enforce this
code with respect to examination of the contract documents,including plans,computations and specifications,and field inspections.
Description of Construction Work Observed'Sovent system directly conforms to our design drawings.
Enter in the space to the right a"wet"or ��OF M4s
electronic signature and seal: �``� y
Phone number:978 568 2616 Email:cummingseng@comcast.net g utWINGS
Building Official Use Only � No.
Building Official Name: Date:
Version 06 1 l 2012