S/O B-20-394 REPLACE FLAT TO FRAME ROOF Commonwealth of Massachusetts ,
r� o City of Salem `
sr 120 Washington St 3rd Floor Salem,MA 01970 978 745-9595 x5641
Return card to Building Division for Certificate of Occupanw
Permit No. B-20-394 P ERMIT TO B U I L D
DATE ISSUED: 5/4/2020
This certifies that GIZZI CHRISTOPHER C
has permission to erect, alter, or demolish a building 52-54 APPLETON STREET Map/Lot: 270181-0
as follows: Roofing REPLACE ROOF FROM FLAT TO A FRAME ROOF STAYING WITHIN FOOTPRING TO
EXISTING STRUCTARE
Contractor Name:
DBA:
Contractor License No:
5/4/2020
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for whict this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laves and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on tiis permit.
HIC#: "Persons contracting with unregistered contractors do not have access to the guarsr?yfund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY C:VVNER.
ti` °`T,, Commonwealth of Massachusetts .
{, City Of SalemUff1120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x564i
A, 0"
Return card to Building Division for Certificate of Occupar,.y
Structure CITY OF SALEM BUILDING PERMIT JUU;.7.,
PERMIT TO BE POSTED IN T ,E.' WINDOW (fr))vation FootingINSPECTION RECOR
Foundation
Framing 1 I , 60
YYYY 7,771) cyL'
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
j
it
Final 1) 1.� )4! rAti4.7__Zolee
Ueeeke e J `r Pam
vjii Plumbing/Gas
Rough:Plumbing 9 gl 6
.471l'j
Rough:Gas q
q {� .
Final li7/9 _ /4#�1 i
✓/Electrical
Lil
Service `
Rough �1
Final /4-, ✓� ac /a L`i'("` i A'! 6,. li•.1./< ., i4' '?-2C evz ///:
Fire apartment ++
I
Preliminary
Final 0' . P J / ( yio
Health Department
Preliminary
,
Final
r