Loading...
S/O B-19-734, C/O & FIN CONS. DOCS RE REBUILD AFTER FIRE ,�` ��;;,� Commonwealth of Massachusetts t, T . City of Salem y,� �. ".c,.;��=� .� 120 Washington St.3rd Floor Salem,MA 01970(978)745-9595 x5641 �' '�1xr.Uo� Return card to Building Division for Certificate of Occupancy Permit No. B-19-734 PERMIT TO BUILD ` FEE PAID: $13,750.00 DATE ISSUED: 7/11/2019 This certifies that AHMED TRUST AHMED GEORGE A TR has permission to erect, alter, or demolish a building 10-12 LYNDE STREET Map/Lot: 260433-0 as follows: Other Building Permit CONVERT FIRE-DAMAGED TWELVE (12) UNIT BUILDING TO A NINE (9) UNIT BUILDING. (see B-19-690 for tempory work, etc.) Contractor Name: THOMAS GROOM DBA: GROOM CONSTRUCTION CO., INC. Contractor License No: CS-040379 7/11/2019 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official niay grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. H IC #: 104999 'Persons contracting with unregistered contractors do not have access to the guaranty fi-.d"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. "4„ commonwealth of Massachusetts L. {(, , City of Salem k.-.1j sgf4t 120 Washington St,3rd Floor Salem.MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy rt. Structure CITY OF SALEM BUILDING PERMIT `"ND'', 1 Excavation PERMIT TO BE POSTED IN THE WINDOW {,*I, I Footing INSPECTION RECORD Foundation Framing 2_rc+_ 7, -o r � Mechanical Yf Insulation 1 (y.2.en ..."--------- I SPECTION: BY DATE Chimney/Smoke Chamber Final 9 2/—.0 I, � / D Plumbing/Gas 14 - ,,-,7201-1, A-_,-z....ge_4, 71 7/ c Rough:Plumbing Z-J/ 'p J>���Q�® Rough:Gas Zr/��� // 0 Final G ima /j ,' thi 3 Electrical Service 2 / / 0 Rough3/014/2.0 Final Fire Department Preliminary 1� Final r ' �`-� 1 1 //� N. i Health Department Preliminary Final i r Certificate Number: )3-/9- 7 3 y Permit Number: /3 -/9 -7 3 y Commonwealth of Massachusetts City of Salem This is to Certify that the A.PA12t/.� �f' V,TGl7„r C, located at Building Type )0— / 2 4-Y,'.i 4 9I.2..Ex-f- in the City of Salem Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY 9 v&vffs This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and expires Not Applicable unless sooner suspended or revoked. Expiration Date Cloi444,4 Issued On: 5&Pi6m t3 en_ 21, a o a 0 Final Construction Control Document *rit To be submitted at completion of construction by a � W Registered Design Professional w` for work per the ninth edition of the -sidMassachusetts State Building Code, 780 CMR, Section 107 Project Title: Willian Hunt Double House-Renovations Date: Sept. 16,2020 Property Address: 10-12 Lynde Street,Salem,MA Project: Check(x)one or both as applicable: - New construction X Existing Construction Project description: Interior and exterior renovations for the conversion of a 12 unit building to a 9 unit residential building. I,John Seger,MA Registration Number:30105, Expiration date: 8/31/2021,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: X Architectural Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: ��aED Ag14 1105146 Vr No.301••' CAMBRIDGE. if AAA Phone number: 978-744-0208 Email:johnaseger@segerarchitects.com Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document 11` To be submitted at completion of construction by a , Registered Design Professional for work per the ninth edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 10-12 Lynde Street Date: 14 January 2020 Permit No. B-19-734 Property Address: 10-12 Lynde Street,Salem,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description:Restore fire damaged 12 unit building structure to become 9 unit. I Edward Moll,MA Registration Number: 33718 Expiration date: 06-20-20,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project. My designee has performed the necessary professional services and was present at the construction on a regular and periodic basis. To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or oN OF if ' electronic signature and seal: Ire y�4�E+ APO `r-yG - HA NI c1+ l _ 4 AL • • 8 , a/si�l ti�� Phone number: (978) 745-6817 Email: emoll@structures-north.com ' /OMAL � Building Official Use Only Building Official Name: Permit No.: Date: Version 01 01 2018 Final Construction Control Document To be submitted at completion of construction by a Registered Design Professional • v for work per the 9th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: William Hunt Double House-Renovations Date: 09/10/2020 Property Address: 10-12 Lynde Street. Salem,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Interior and exterior renovations for the conversion of a 12 unit building to a 9 unit residential building. I,Robert E.Dyson,P.E.,MA Registration Number:33026, Expiration date: June 30,2022,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural X Mechanical Fire Protection Electrical X Other: Plumbing for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or `t 4 OF sN g electronic signature and seal: mq / Ec M YSON �25 L (/4i :0, ` /ONAL v-G\ Phone number: 781-901-1775 Email: Building Official Use Only Building Official Name: Permit No.: Date: Version O1 O1 2018 Final Construction Control Document 1ti ariti To be submitted at completion of construction by a Registered Design Professional • 1 I �.�" for work per the 9th edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: William Hunt Double House-Renovations Date: 09/10/2020 Property Address: 10-12 Lynde Street.Salem,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Interior and exterior renovations for the conversion of a 12 unit building to a 9 unit residential building. I,Bryan M.Wyllie,MA Registration Number: 45219, Expiration date: June 30,2022,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: Architectural Structural Mechanical Fire Protection X Electrical Other: for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or electronic signature and seal: Of MAS$40 0-\"03 BNM ,U\ �� 9 1/4„ v`� Phone number: 781-901-1775 Email: FSSIONAL Building Official Use Only Building Official Name: Permit No.: Date: Version Ol 01 2018 Final Construction Control Document To be submitted at completion of construction by a tt Registered Design Professional for work per the ninth edition of the 411-m44 Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Residential Date: 9/15/2° Permit No. Property Address: 10-12 Lynde St.Salem,MA.01970 Project: Check one or both as applicable: X New construction ❑ Existing Construction Project description: The scope of work consist of a new wet sprinkler system system for 3 story home as per LFP-001. Alt work to conform to NFPA 13,2013 Edition and the 9th Edition of the State Building Code 780 CMR.Section 107. Lawrence V. Roy MA Registration Number: 38913-FP Expiration date: 06/30/21 ,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Architectural [ ] Structural [ ] Mechanical [x] Fire Protection [ ] Electrical [ ] Other: for the above named project. I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept,shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its rest.nsibili regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or 4 '+n� electronic signature and seal: `'jl''REN}CE v o/' PROTECT .N y) No.3891 Phone number: 781-245-988$ e `,� ' mail: Larry@Ivrcorp.com Et4C uild' g Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013