Loading...
BUILDING 4 - FP2-1 (002)} 2-9/16' CGS rrrr' ) Maximum 1 1 0-312 0 Al OWNSTAIR5 2 1/16" DIA, TYPICAL 2" CPVC MAIN UP FROM BELOW (TYPICAL) CROSS SECTION r 2* DIA._ MIN. I HOLE IN WALL 1 29/32* CUL I 1' X 1/2" PEDUCER iAr wiry. 5/6" MAX. —...L cP RETAINER 1" I01IN.. 1 1 ?" lam. li " OR /4" ADJUSTMENT RECESSED HORIZONTAL SIDEWALL UPSTAIRS -9' 20-1 a% DN i 1-4'2 0 SECOND LEVEL SPRINKLER LAYOUT SCALE: %4" = 1'-0" Calculation results for Design Area 1 — THIRD FLOOR This system as shown on VILLAGE FIRE PROTECTION company print no dated 10/15/20 for PROPOSED MULTI -UNIT RESIDENTIAL allilLSDINGTH MASON ST - BUILDING 4 contract no 380-008 is designed to discharge at a rate of 0.05 gpm/ft2 (L/min/m2) of floor area over a maximum area of 352 ft2 when supplied with water at a rate of 65.6 gpm at 49.7 psi at the base of the riser. Hose stream allowance of is included in the above. Occupancy classification: RES 13R Number of heads flowing: 4 Commodity classification: System Type: Wet Maximum storage height: Maximum velocity: 10.87 ft/s Storage arrangement: Flow from In -Rack sprinklers: Flow from Overhead sprinklers: Flow from Inside Hoses: Flow from Outside Hoses: Other fixed flows: Total flow in system piping: Additional flow at/beyond source: Total of all flows: 0 gpm 65.6 gpm 0 gpm 0 gpm 0 gpm 65.6 gpm 100 gpm 165.6 gpm Pressure Required at Source: Pressure Available at Source: Surplus Pressure at Source: 49.7 psi 78.8 psi 29.1 psi 8 r riff lit —ASSY NOTE: DUE TO THE COMPLEXITY OF THE ROOFLINE, LOCATIONS OF SIDEWALL SPRINKLERS THROUGHOUT THE TOP FLOOR WILL BE ADJUSTED AS NEEDED ONCE FRAMING HAS COMPLETED TO MEET THE INSTALLATION REQUIREMENTS OF NFPA 13R. NO SPRINKLER PIPING SHALL BE RUN IN ANY ROOF -JOISTS OR OTHER AREAS OF POTENTIAL FREEZING. ADDITIONAL FRAMING MAY BE REQUIRED IF CEILING SLOPES DO NOT PERMIT THE CORRECT INSTALLATION OF SPRINKLER HEADS IN ACCORDANCE WITH NFPA 13R. Design Area 1 Wet System THIRD FLOOR Demand Calculations using Hazen -Williams Method Occupancy Classification: RES 13R Design Area Density: 0.05 Additional Outside Hose: 100 Design Area Size: 352 Notes: THIS CALCULATION INCLUDES THE HMD 4 RESIDENTIAL SIDEWALLS ON THE THIRD LEVEL Al. I%/////////////d1/////.Al• DN1-312 TO TO P''TA RS DOWNSTa IRS UPSTAIRS 8-3' 2 3_912 hV Er 1 4-1012 / hVAC 1-012 TO UPSTAIRS VAC NSTAI RS 1-10'2N -812 1-10 i Caution: Care should be taken to avoid compressing the insulation. This reduces its R value. To prevent potential freeze -ups of the sprinkler piping, the insulation should be installed tight against the joists. INSULATION PROTECTING SPRINKLER PIPING ON UPPER FLOOR DETAIL NOT TO SCALE SYSTEM ISOMETRIC SCALE: NOT TO SCALE NOTE: SPRINKLER HEAD LOCATIONS HAVE NOT BEEN COORDINATED WITH CEILING -MOUNTED FIXTURES OR OTHER POTENTIAL OBSTRUCTIONS. ACTUAL LOCATIONS OF HEADS SHALL BE FIELD -COORDINATED IN ACCORDANCE WITH THE OBSTRUCTION RULE OF NFPA 13 (2013 EDITION). PROVIDE RESIDENTIAL SIDEWALL HEADS USING A MAXIMUM SPACING OF 16'x16' REQUIRING A MINIMUM OF 16 GPM @ 13.2 PSI THROUGHOUT THE THIRD LEVEL (TYPICAL) SPRINKLER CONTRACTOR SHALL TAKE PRECAUTIONS WHEN INSTALLING SPRINKLER PIPING IN JOISTS ON TOP FLOOR. GENERAL CONTRACTOR SHALL BE REQUIRED TO INSTALL SUFFICIENT INSULATION TO MAINTAIN 40-DEGREES IN ALL AREAS WHERE SPRINKLER PIPING AND HEADS ARE INSTALLED THIRD LEVEL SPRINKLER LAYOUT SCALE: 14" = 1 '-0" TYPICAL iY" CPVC RISER (VERIFY LOCATIONS IN -FIELD) 2 OWNSTAI RS i 1 TO OWNSTAI RS • TO DOWN TA TAIRS DOWNSTAI RS FREEZE P R❑TECTI❑N THE BUILDING OWNER IS RESPONSIBLE FOR PROVIDING HEAT IN ALL AREAS CONTAINING SPRINKLER PIPING AND HEADS TO PREVENT PIPE FROM FREEZING. ANY AREAS THAT RAISE CONCERN WITH REGARD TO FREEZING POTENTIAL SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION, IN WRITING, PRIOR TO INSTALLATION. JFP SOLUTIONS, INC. AND THE ENGINEER OF RECORD TAKE NO RESPONSIBILITY FOR DAMAGES CAUSED BY FREEZE -UPS OF THE SPRINKLER SYSTEM. 3-1 DN 2-11 .9 /// Ge) /////////////5)//////// f / s DESIGNED BY: ]FP SOLUTIONS, INC. FIRE PROTECTION CONSULTING SERVICES P.O. Box 1234 Lynnfield, Massachusetts 01940 Telephone: (781) 389-7999 E-Mail: TDJFP 1 @Yahoo.Com DATE REVISIONS DESCRIPTION BY HEAD BLOCK SYM CNT POSITION FINISH TEMP N PT MFG. 97 RES PENDENT WHITE 155 5.80 1/2" REL. No 5 DRY SIDEWALL WHITE 155 5.60 1/2" REL. 37 RES. SIDEWALL BRASS 155 5.80 1/2" REL. CPVC SPRINKLER PIPING STEEL SPRINKLER PIPING SPRINKLER CONTRACTOR VILLAGE FIRE PROTECT 86 MILFORD STREET MILFORD, NH 03055 (603) 672-6267 ON NEW AUTOMATIC NFPA 13R SPRINKLER SYSTEM BUILDING 4 � SOUTII MASON STREET SALEM, MASSACHUSETTS 03055 PROJECT ADDRESS SPRINKLER SYSTEM PERMIT SET PERMIT NO. CONTRACT NO. 380-008 APPROVAL SALEM FD DRAWN BY T. JENKINS SCALE 1 /4"=1'-0" DATE 10/15/2018 REVISED FP2of2 z 0 y'(NOFMA - 90 JASON M.C. KAHAN FIRE PROTECTION o. 4838 0/STEP SIONAL 0) PLOTTED