FIN. CONST CONT DOC 9/21/2020 FIRE PROT. Final Construction Control Document
'i To be submitted at completion of construction by a
Registered Design Professional
1% for work per the 9th edition of the
.1M r SYe
Massachusetts State Building Code, 780 CMR, Section 107
Project Title:HALSTEAD SALEM STATION, BUILDING 2 AMENITY AREAS Date: 9/21/2020
Property Address:72 FLINT STREET, SALEM, MA
Project: Check(x) one or both as applicable: X New construction Existing Construction
Three story(plus garage under)residential use with accessory assembly and business uses present. NFPA 13 automatic sprinkler
Project description system and standpipe(2)installation based on plans dated 11/12/2019. Certificate of Occupancy desired for Amenity spaces only
at this time. Residential Areas not part of this affidavit.
I Alison C.Brackett MA Registration Number: 52169 Expiration date: 6/30/22 , am a registered design
professional, and I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning:
Architectural Structural Mechanical
tre Protection Electrical Other: Describe
for the above named project. I, or my designee,have performed the necessary professional services and was present at the
construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work
proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building
permit and that I or my designee:
1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 1, Section 116, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
4. For Building 2, I was brought into the Construction Control process after the pipe was hidden so can attest only to exposed components at this time.
Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 116.3.
Pi. VW IAA 14
BRAixErr
31p
4 (3 FIRE Pgp1Yt MOt't �•t�
Enter in the space to the right a"wet" 4v, wo. 52169
electronic signature and seal: :\pb�.AF , TE��O 4
s..;ss N
Phone number: 603-305-2680
Email: alison.brackett@gmail.com