SITE OBSERVATION RPT 10/14/2020 (8 PGS) Byblos Inc Site Observation Report
Consulting Engineers
Page 1 of 8
To Company DMS Design Project Name Halstead Salem Station
Attention Sid Silveira Project No. E2020002
General Contractor Fulcrum Observation Date 10/14/2020
Subcontractor N/A On-Site Time 7:00AM to 10:30AM
Reported By Fadi Bark Report No. E2020002-03
In Attendance Pat, Mark Schow (Elevated Design).
I. Construction Observations
• The site walkthrough was focused on building #2 and its completion. We also walked buildings 1 and 3.
• Construction is progressing well, site is clean, well maintained, and general workmanship appears to be
good.
II. Action Items:
tt a. See picture 1: Building 2, Main electrical room requires exit signs on both egress doors (top and side
of the doors).
b. See picture 2: Building 2, Main electrical room panelboards— Provide typed schedules and attach
them inside.
c. See picture 3: Building 2 - 3' floor. Solenoid valve for gas line feeding the grills and other burners on
the roof requires a cover.
d. See picture 4: Building 2, unit 2208 should have its panelboard schedule adjusted to reflect wiring.
Verify and modify accordingly. Garbage disposal is on a different circuit then labeled - modify.
e. See picture ..y: Building 2, unit 2314, a HC unit— Kitchen equipment installation doesn't meet HC
requirements. This is typical for all HC units.
5 f. See picture 6: Building 2 panelboard PP2— It doesn't have the required 3' clearance as required by
�1
NEC, however we were informed that the local AHJ has approved it.
PA g. See picture 7: Building 1 - When not in use, panelboards shall remain protected from debris at all time
1v A h. Elevator recall for building 1 elevators not tested yet.
Site Observation Report
Page 2 of 8
Project: Halstead Salem Station 10/16/2020— E2020002-03
III. Construction Progress Photos
1 Building 2, Main
' electrical room
requires exit signs on
both egress doors (top
and side of the doors).
r ,
f
Site Observation Report
Page 3 of 8
Project: Halstead Salem Station 10/16/2020 — E2020002-03
2. Main electrical room
panelboards — Provide
typed schedules and
attach them inside.y` - •
X .,
;o-•
0
4 V - 1 I f..
'i I 6,
F4
Site Observation Report
Page 4 of 8
Project: Halstead Salem Station 10/16/2020 — E2020002-03
f 3. Building 2 - 3rd floor.
Solenoid valve for gas
line feeding the grills
and other burners on
• the roof requires a
1 T
cover.
•
..-,,.
V
1 Y'i
110
lik
Site Observation Report
Page 5 of 8
Project: Halstead Salem Station 10/16/2020 — E2020002-03
4. Building 2, unit 2208
should have its
panelboard schedule
adjusted to reflect
wiring. Verify and
modify accordingly.
Garbage disposal is
on a different circuit
' - then labeled - modify
tiff
'::_-....' ....•;
, ...,•
11 If+
Site Observation Report
Page 6 of 8
Project: Halstead Salem Station 10/16/2020 — E2020002-03
f..,----1\
-. 5. d 2 unit 2314,
aBuil HC uniting —, Kitchen
equipment installation
doesn't meet HC
requirements. This is
HC units
4
typical for all
I
\ '
t
IP
wr
Site Observation Report
Page 7 of 8
Project: Halstead Salem Station 10/16/2020 — E2020002-03
-, '', 6. Building 2 panelboard
• ': : •'• SC,y
PP2 — It doesn't have
r
' ._ the required 3'
clearance as required
- 1, j� by NEC, however it
`' • \ appears that the local
• AHJ has approved it.
i
1
a
wP
Cr
1
kr
Site Observation Report
Page 8 of 8
Project: Halstead Salem Station 10/16/2020 — E2020002-03
7. Building 1 - When not
in use, panelboards
shall remain protected
from debris at all time.