SITE OBSERVATION RPT 10/14/2020 (8 PGS) Byblos Inc Site Observation Report Consulting Engineers Page 1 of 8 To Company DMS Design Project Name Halstead Salem Station Attention Sid Silveira Project No. E2020002 General Contractor Fulcrum Observation Date 10/14/2020 Subcontractor N/A On-Site Time 7:00AM to 10:30AM Reported By Fadi Bark Report No. E2020002-03 In Attendance Pat, Mark Schow (Elevated Design). I. Construction Observations • The site walkthrough was focused on building #2 and its completion. We also walked buildings 1 and 3. • Construction is progressing well, site is clean, well maintained, and general workmanship appears to be good. II. Action Items: tt a. See picture 1: Building 2, Main electrical room requires exit signs on both egress doors (top and side of the doors). b. See picture 2: Building 2, Main electrical room panelboards— Provide typed schedules and attach them inside. c. See picture 3: Building 2 - 3' floor. Solenoid valve for gas line feeding the grills and other burners on the roof requires a cover. d. See picture 4: Building 2, unit 2208 should have its panelboard schedule adjusted to reflect wiring. Verify and modify accordingly. Garbage disposal is on a different circuit then labeled - modify. e. See picture ..y: Building 2, unit 2314, a HC unit— Kitchen equipment installation doesn't meet HC requirements. This is typical for all HC units. 5 f. See picture 6: Building 2 panelboard PP2— It doesn't have the required 3' clearance as required by �1 NEC, however we were informed that the local AHJ has approved it. PA g. See picture 7: Building 1 - When not in use, panelboards shall remain protected from debris at all time 1v A h. Elevator recall for building 1 elevators not tested yet. Site Observation Report Page 2 of 8 Project: Halstead Salem Station 10/16/2020— E2020002-03 III. Construction Progress Photos 1 Building 2, Main ' electrical room requires exit signs on both egress doors (top and side of the doors). r , f Site Observation Report Page 3 of 8 Project: Halstead Salem Station 10/16/2020 — E2020002-03 2. Main electrical room panelboards — Provide typed schedules and attach them inside.y` - • X ., ;o-• 0 4 V - 1 I f.. 'i I 6, F4 Site Observation Report Page 4 of 8 Project: Halstead Salem Station 10/16/2020 — E2020002-03 f 3. Building 2 - 3rd floor. Solenoid valve for gas line feeding the grills and other burners on • the roof requires a 1 T cover. • ..-,,. V 1 Y'i 110 lik Site Observation Report Page 5 of 8 Project: Halstead Salem Station 10/16/2020 — E2020002-03 4. Building 2, unit 2208 should have its panelboard schedule adjusted to reflect wiring. Verify and modify accordingly. Garbage disposal is on a different circuit ' - then labeled - modify tiff '::_-....' ....•; , ...,• 11 If+ Site Observation Report Page 6 of 8 Project: Halstead Salem Station 10/16/2020 — E2020002-03 f..,----1\ -. 5. d 2 unit 2314, aBuil HC uniting —, Kitchen equipment installation doesn't meet HC requirements. This is HC units 4 typical for all I \ ' t IP wr Site Observation Report Page 7 of 8 Project: Halstead Salem Station 10/16/2020 — E2020002-03 -, '', 6. Building 2 panelboard • ': : •'• SC,y PP2 — It doesn't have r ' ._ the required 3' clearance as required - 1, j� by NEC, however it `' • \ appears that the local • AHJ has approved it. i 1 a wP Cr 1 kr Site Observation Report Page 8 of 8 Project: Halstead Salem Station 10/16/2020 — E2020002-03 7. Building 1 - When not in use, panelboards shall remain protected from debris at all time. S ' a yi I 11' . 0 :iriii41;.1 ,1i,: r,i V,_.. ! 1 r t 1 I 1 i irate A J