Loading...
SITE OBSERVATION REPORT 10/14/2020 (5 PGS) ELEVATED . DESIGN INC Site Observation Report CONSULTING ENGINEERS USING LESS ENERGY. BY DESIGN. To Company DMS Design Project Name Halstead Salem Station Attention Sid Silveira Project No. P12601 General Contractor Fulcrum Observation Date 10/14/2020 Subcontractor N/A On-Site Time 7:00 to 10:45 Reported By Mark Schow Report No. P12601-04 In Attendance Pat Madden (Fulcrum Site Super), Fadi Bark (Electrical) I. Construction Observations • Construction is progressing well, site is clean, well maintained, and general workmanship appears to be good. II. Action Items: Building 2: a. See picture 1: Secure grills to deck to protect gas piping from damage. b. See picture 2: Washer dryer box must be repaired and Watts intelliTimers installed. c. See picture 3: Garage electric room wall penetrations must be fire sealed. d. See picture 4: Garage plenum heater locations must be clearly labeled and thermostat dial setting appropriately set. e. See picture 5: Temporary power to building 1 must be removed. f. See picture 6: At outdoor condenser units, remove insulation, install 2x2 light, replace partial ceiling tiles with egg crate diffuser. Building 3: g. See picture 7: Completely cover hole and label cover. Building 1: h. See picture 8: Repair damaged wall section on Stair#2. III. Construction Progress Photos ELEVATED Site Observation Report 1.7"- c DESIGN INC CONSULTING ENGINEERS Page 2 of 5 USING LESS ENERGY. BY DESIGN. Project: Halstead Salem Station 10/14/2020 — P11001-04 1. Gas grills are hard piped, but are mounted on wheels. Grills must be ti - securely attached to ,,,.:,. +� "' ` the deck to avoid strainin0,00•10- g the gas . p _A, dm .., piping. .. y F�� v r1 T ......., . . .. .., . . ........_ if — ,-, — .. ____..... ,.. . . .. • . .„, ,. . ................: . . ...,...,,,,..., 4.:....elet,t,..,),. ... .t.„,..4. ..:i4,4„.,..:0„....,..„.tit... _ ._.... ' --- ......„.s........,...,...,..4.....::.:,......, ...;,.................„.v.. ........ . .1 .,...._ •tt i [3 � - .. . •: .SY fit y��tiY i - of tqo "^' tn:}�.'�9N�'s`-t-" i u0 'S S'. �.��•'`����t1i �i , . t 2. Washer/Dryer valve box damaged and incorrectly installed. It" lso requires System a Watts IntelliTimer. • t. r111 viV „000.007... Y ELEVATED Site Observation Report -- DESIGN INC Page 3 of 5 CONSULTING ENGINEERS USING LESS ENERGY. BY DESIGN. Project: Halstead Salem Station 10/14/2020 — P11001-04 3. Wall penetrations in -., the garage electric >; room need to be fire sealed. ,: 4441, t 4. Heater locations in the garage need to be labeled for future maintenance purposes. Contractor also needs to work with the manufacturer or perform diagnostics to determine the proper temperature setting and then set each heater. -- ELEVATED Site Observation Report DESIGN INC Page 4 of 5 CONSULTING ENGINEERS USING LESS ENERGY. BY DESIGN. Project: Halstead Salem Station 10/14/2020 — P11001-04 5. Temporary power to Building 1 still installed. FF ...a w .o..v...... J i \E. , ' 6. Remove insulation surrounding minisplits, install 2x2 light, '":4:'''. l''''1::: '''''''-'''' - ' : ' _ replace partial ceiling ,. tiles with egg crate 7 : diffuser. ae 3 . ELEVATED Site Observation Report DESIGN INC Page 5 of 5 CONSULTING ENGINEERS USING LESS ENERGY. BY DESIGN. Project: Halstead Salem Station 10/14/2020 — P11001-04 • ' • 7. Hole IP completelyshould covbe veered and labeled- . ','Vf F'el �}. 'x .fr I (1 Y ♦ .�1' "# << sit y !r Ate ^ tM1'• .,. a.,- ~ , c-.-. 5�----::` c t , .. r i r-•♦ � - } • r N7 tea,,-tel Ne r *' ° Slit Ye 7 " �1 { t # r. gilt . x •�' _!II! , r 8. Damaged wall section 1 on Building 1 stair#2 � x ;� ' }*"` -i .. should be air sealed. yR\t A .7 ,. .'=, • "'' "... ,l t fi L1�•; ..14.yam+ =S� ,'y, ,..,. °�. r !) '. , R> h S