SITE OBSERVATION REPORT 10/14/2020 (5 PGS) ELEVATED
. DESIGN INC Site Observation Report
CONSULTING ENGINEERS
USING LESS ENERGY. BY DESIGN.
To Company DMS Design Project Name Halstead Salem Station
Attention Sid Silveira Project No. P12601
General Contractor Fulcrum Observation Date 10/14/2020
Subcontractor N/A On-Site Time 7:00 to 10:45
Reported By Mark Schow Report No. P12601-04
In Attendance Pat Madden (Fulcrum Site Super), Fadi Bark (Electrical)
I. Construction Observations
• Construction is progressing well, site is clean, well maintained, and general workmanship appears to be
good.
II. Action Items:
Building 2:
a. See picture 1: Secure grills to deck to protect gas piping from damage.
b. See picture 2: Washer dryer box must be repaired and Watts intelliTimers installed.
c. See picture 3: Garage electric room wall penetrations must be fire sealed.
d. See picture 4: Garage plenum heater locations must be clearly labeled and thermostat dial setting
appropriately set.
e. See picture 5: Temporary power to building 1 must be removed.
f. See picture 6: At outdoor condenser units, remove insulation, install 2x2 light, replace partial ceiling
tiles with egg crate diffuser.
Building 3:
g. See picture 7: Completely cover hole and label cover.
Building 1:
h. See picture 8: Repair damaged wall section on Stair#2.
III. Construction Progress Photos
ELEVATED Site Observation Report
1.7"- c DESIGN INC
CONSULTING ENGINEERS Page 2 of 5
USING LESS ENERGY. BY DESIGN.
Project: Halstead Salem Station 10/14/2020 — P11001-04
1. Gas grills are hard
piped, but are
mounted on wheels.
Grills must be
ti -
securely attached to
,,,.:,.
+� "' ` the deck to avoid
strainin0,00•10- g the gas
. p
_A,
dm
..,
piping.
..
y F�� v r1 T
......., . .
.. ..,
. .
........_
if — ,-, —
..
____.....
,..
. .
..
•
. .„,
,. . ................: . . ...,...,,,,..., 4.:....elet,t,..,),.
... .t.„,..4. ..:i4,4„.,..:0„....,..„.tit... _ ._.... ' ---
......„.s........,...,...,..4.....::.:,......, ...;,.................„.v.. ........ .
.1
.,...._
•tt i [3 � - .. .
•: .SY fit y��tiY i -
of tqo "^' tn:}�.'�9N�'s`-t-" i u0 'S S'. �.��•'`����t1i �i , .
t
2. Washer/Dryer valve
box damaged and
incorrectly installed.
It"
lso requires System a
Watts IntelliTimer.
•
t.
r111 viV
„000.007...
Y
ELEVATED Site Observation Report
-- DESIGN INC Page 3 of 5
CONSULTING ENGINEERS
USING LESS ENERGY. BY DESIGN.
Project: Halstead Salem Station 10/14/2020 — P11001-04
3. Wall penetrations in
-., the garage electric
>; room need to be fire
sealed.
,:
4441,
t
4. Heater locations in the
garage need to be
labeled for future
maintenance
purposes. Contractor
also needs to work
with the manufacturer
or perform diagnostics
to determine the
proper temperature
setting and then set
each heater.
-- ELEVATED Site Observation Report
DESIGN INC Page 4 of 5
CONSULTING ENGINEERS
USING LESS ENERGY. BY DESIGN.
Project: Halstead Salem Station 10/14/2020 — P11001-04
5. Temporary power to
Building 1 still
installed.
FF
...a w .o..v......
J i \E. , '
6. Remove insulation
surrounding minisplits,
install 2x2 light,
'":4:'''. l''''1::: '''''''-'''' - ' : ' _ replace partial ceiling
,. tiles with egg crate
7 : diffuser.
ae
3 .
ELEVATED Site Observation Report
DESIGN INC Page 5 of 5
CONSULTING ENGINEERS
USING LESS ENERGY. BY DESIGN.
Project: Halstead Salem Station 10/14/2020 — P11001-04
• ' • 7. Hole
IP
completelyshould covbe
veered
and labeled- .
','Vf F'el �}. 'x .fr I (1 Y
♦ .�1' "# << sit y
!r Ate ^ tM1'• .,. a.,-
~
,
c-.-. 5�----::` c t ,
.. r i
r-•♦ � - } • r N7 tea,,-tel
Ne r *'
° Slit
Ye
7 " �1
{ t # r.
gilt . x
•�' _!II!
, r 8. Damaged wall section
1 on Building 1 stair#2
� x ;� ' }*"` -i .. should be air sealed.
yR\t A .7
,. .'=, • "'' "...
,l t
fi
L1�•;
..14.yam+ =S� ,'y, ,..,. °�. r
!)
'. , R> h S