Loading...
Final Construction Control Document and Certificate Of Occupancy A4 Final Construction Control Document To be submitted at completion of construction by a ut Registered Design Professional for work per the 9` edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 28 Goodhue Street Salem,MA Date:4/30/20 Permit No. B-20-958 Property Address: 28 Goodhue Street Units 2 and 3 - Salem,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Install two bathrooms,new openings in wall,new flooring,ceiling and paint. I,Carmine Guarracino,P.E.MA Registration Number:40104 Expiration date: June 2022,am a registered design professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': X Entire Project Architectural X Structural Mechanical Fire Protection Electrical Other: for the above named project. I certify that 1,or my designee,have performed the necessary professional services, in accordance with the Professional Standard of Care,and was present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. Such review shall not diminish or relieve the Contractor of its submittal and other responsibilities. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. The Contractor is responsible for the performance of the work in accordance with the contract documents and shall be exclusively responsible for its construction means,methods, sequences,and for construction safety. H OF Enter in the space to the right a"wet"or �� CARMINE s� rt electronic signature and seal: 0 GUARRACINO STRucTu L No.4 Phone number: 617.628.1700 Email: Guarracino@RGEng.com �"cF ►5 t Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an x'project design plans,computations and specifications that you prepared or directly supervised.If*other' is chosen, provide a description. Trial Version 10092012—Drag modified by AIA MA i i C (D CD Q � 0 aSi 0 p (n vi Z C 0 3 (DD m CDm 00 ►o m ? o O w 00 m i o =r GO G) 0 m N n = ma z I � m � N y V N m v mrl �- c7 0 o n 0 > ' �. Z `� d m O � 2 -h v W Cl) c D 0 a /1 CD D m 1 CD m X �o ( O 0 CCD CD VIOL N m y m i � Oy 7 n 1 (D O �0 s 0 cn nCD C � 3 3 z z z c co o 3 _a 0 0) m CD -< CD- 0 o 3 O co 3 fn c• co 0 CD J