Final Construction Control Document and Certificate Of Occupancy A4 Final Construction Control Document
To be submitted at completion of construction by a
ut Registered Design Professional
for work per the 9` edition of the
Massachusetts State Building Code, 780 CMR, Section 107
Project Title: 28 Goodhue Street Salem,MA Date:4/30/20 Permit No. B-20-958
Property Address: 28 Goodhue Street Units 2 and 3 - Salem,MA
Project: Check(x)one or both as applicable: New construction X Existing Construction
Project description: Install two bathrooms,new openings in wall,new flooring,ceiling and paint.
I,Carmine Guarracino,P.E.MA Registration Number:40104 Expiration date: June 2022,am a registered design
professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans,
computations and specifications concerning':
X Entire Project Architectural X Structural Mechanical
Fire Protection Electrical Other:
for the above named project. I certify that 1,or my designee,have performed the necessary professional services, in
accordance with the Professional Standard of Care,and was present at the construction site on a regular and periodic basis
to determine that the work proceeded in accordance with the requirements of 780 CMR and the design documents
prepared by me and approved as part of the building permit and that I or my designee:
1. Have reviewed,for conformance to this code and the design concept, shop drawings,samples and other submittals
by the contractor in accordance with the requirements of the construction documents. Such review shall not
diminish or relieve the Contractor of its submittal and other responsibilities.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code. The Contractor is responsible for the performance of the work in
accordance with the contract documents and shall be exclusively responsible for its construction means,methods,
sequences,and for construction safety.
H OF
Enter in the space to the right a"wet"or �� CARMINE s�
rt
electronic signature and seal: 0 GUARRACINO
STRucTu L
No.4
Phone number: 617.628.1700 Email: Guarracino@RGEng.com
�"cF ►5
t
Building Official Use Only
Building Official Name: Permit No.: Date:
Note 1. Indicate with an x'project design plans,computations and specifications that you prepared or directly supervised.If*other' is chosen,
provide a description.
Trial Version 10092012—Drag modified by AIA MA
i
i
C (D
CD
Q �
0 aSi 0
p (n vi Z
C 0 3
(DD m CDm
00
►o m ? o
O w 00 m i
o =r GO
G) 0 m
N n =
ma
z
I � m
� N y V N m v
mrl
�-
c7 0
o
n 0
> '
�. Z `� d
m O
� 2 -h
v W Cl)
c D 0 a /1
CD D m 1 CD m X �o (
O 0 CCD
CD
VIOL
N m y
m
i
� Oy 7
n
1 (D
O �0
s 0 cn
nCD
C � 3 3
z
z
z c
co
o 3
_a 0 0) m
CD
-< CD-
0
o
3 O co
3 fn
c• co
0
CD
J