Loading...
STRUC. ENGR RPT FOR SOLAR ARRAY 9/17/2020 V - YEE T n G I n E E R S VSE Project Number:U1876.1928.201 September 17,2020 Boston Solar 55 Sixth Road Woburn MA,01801 REFERENCE: Todd,Barrie-Post Install Residence: 1 Marion Road,Salem,MA 01970 Solar Array Post Installation-Structural Review To Whom It May Concern: We have reviewed photographs and a post-installation checklist for the above-referenced site. Based upon our review, it is our conclusion that the installation of solar panels on this existing roof occurred in accordance with the structural requirements of the Massachusetts State Residential Code (780 CMR Chapter 51, 9th Edition(2015 IRC)) and our original requirements as stated in a letter dated:July 15,2020.Framing size and spacing has been verified to match the understood size and spacing from our original review. According to the installer, no existing or new damage to any structural element was observed.Measures have been taken to waterproof all roof penetrations. Our conclusions are based upon our review of the photos and a checklist prepared by the installer. This letter does not waive the installer of any responsibility for improper installation. We hope this meets your needs. If you have any further questions regarding this matter, please call this office at your convenience. VECTOR STRUCTURAL ENGINEERING,LLC Jacob S ..&TAOFAM S7 Proctor JACOB PROCid Rs. oyG Digitally signed by CIVIL 54953 Jacob S Proctor v Date: 2020.09.17 pis-rE 16:20:57 -06'00' AL 09/17/2020 Jacob Proctor,P.E. MA License:54953-Expires:06/30/2022 Project Engineer JSP/ych 651 W.Galena Park Blvd.,Ste. 101/Draper,UT 84020/T(801)990-1775/F(801)990-1776/www.vectorse.com