Loading...
01_C100 Demolition Plan Washington Salem 05-09-18(1)PLANDEMOLITIONC1001"=20'03.14.20182018-005ESDMFEET02040WVDS9-11 Dodge St.,217-219 &231-251Washington St.,Salem, MASHT NO:SHEET NAME:STAMP:REV DESCRIPTION DATEPROJECT INFONORTHDR BY:CHK BY:PROJ NO:DATE:SCALE:APPLICANT:DODGE AREA, LLCc/oOPECHEE CONSTRUCTION CORP.BELMONT, NH 03220603-527-9090DSWCATEGENERAL NOTESUTILITIES IDENTIFIED AS ABANDONED WERE CUT AND CAPPED AT THE APPROXIMATELOCATIONS SHOWN. REMAINING ELEMENTS OF UTILITIES THAT WERE PREVIOUSLYABANDONED WITHIN THE LIMITS OF THE PROPOSED BUILDING ARE TO BE REMOVED UNDERTHIS CONTRACT.ALL WORK PERFORMED AS PART OF THIS PROJECT SHALL CONFORM TO THE CITY OF SALEM,DEPT. OF PUBLIC WORKS AND ANY OTHER AGENCY WITH AUTHORITY IN THIS AREA.CONTRACTOR TO MAINTAIN WORK AREA IN A CLEAN CONDITION. NO CONSTRUCTION DEBRISSHALL BE ALLOWED TO ACCUMULATE WITHIN THE WORK SITE AND NO DIRT, GRAVEL, ETC.SHALL BE ALLOWED TO ACCUMULATE ON THE PUBLIC RIGHT-OF-WAY.AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY THE CONTRACTOR'SOPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO THEIR ORIGINAL CONDITION ATTHE CONTRACTOR'S EXPENSE.SEE PROJECT SPECIFICATIONS IN RELATION TO EROSION CONTROL MEASURES ANDTEMPORARY UTILITIES DURING CONSTRUCTION.SEE DETAIL SHEETS FOR CATCH BASIN SILT SACK AND TEMPORARY CONSTRUCTIONENTRANCE DETAILS.SEE OPERATION AND MAINTENANCE PLAN PREPARED BY DESIGN CONSULTANTS, INC. FORCONSTRUCTION-PHASE MAINTENANCE PROCEDURES.DUST CONTROLTHE CONTRACTOR SHALL BE RESPONSIBLE TO CONTROL DUST THROUGHOUT THE CONSTRUCTIONPERIOD. DUST CONTROL METHODS SHALL INCLUDE, BUT NOT LIMITED TO SPRINKLING WATER ONEXPOSED AREAS, COVERING LOADED DUMP TRUCKS LEAVING THE SITE, AND TEMPORARYMULCHING. DUST CONTROL MEASURES SHALL BE UTILIZED SO AS TO PREVENT THE MIGRATION OFDUST FROM THE SITE TO ABUTTING AREAS.ONCE PER WEEK BY A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR.ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE UNITS A MINIMUM OF C. SANITARY WASTEINSTRUCTED IN THESE PRACTICES BY THE SUPERINTENDENT.LOCAL OR STATE REGULATION OR BY THE MANUFACTURER. SITE PERSONNEL WILL BE ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY B. HAZARDOUS WASTEINSTRUCTED REGARDING THE CORRECT PROCEDURE FOR WASTE DISPOSAL BY THENO CONSTRUCTION WASTE MATERIALS WILL BE BURIED ON SITE. ALL PERSONNEL WILL BE ALL TRASH AND CONSTRUCTION DEBRIS FROM THE SITE WILL BE DEPOSITED IN A DUMPSTER. ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN SECURELY LIDDED RECEPTACLES. A. WASTE MATERIALSWASTE DISPOSALSUPERINTENDENT.SEQUENCE OF MAJOR ACTIVITIES1. INSTALL ANY EROSION AND SEDIMENT CONTROLS; ERECT CONSTRUCTION ENTRANCE AND FENCING.2. CUT AND CAP ALL INDICATED UTILITY LINES AT MAINS.3. CONSTRUCT NEW BUILDING AND INTEGRATED PARKING FACILITY; CONSTRUCT ANY NEW UTILITIES REQUIRED INSTREET.4. CONSTRUCT LANDSCAPED AREAS.5. REMOVE EROSION CONTROLS AFTER LANDSCAPED AREAS HAVE PERMANENTLY STABILIZED.OFF SITE VEHICLE ANTI-TRACKINGSTABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT ALL POINTS OF EGRESS FROM THE SITE AND MAINTAINED FOR THE DURATION OF CONSTRUCTION. NO CHANGES15/9/18