REV .02 SPRINKLERNEW
ELEVATOR
PIT
UP
UP
DN
DN
CRAWL SPACE
CRAWL SPACE
EXIST LOWER
BASEMENT
NEW ELECTRICAL
ROOM
SUMP
PIT
UP
ELECTRIC IN GAS IN
(ABOVE)
EXISTING VERIZON
EQUIPMENT
TELEPHONE TO BE
RELOCATED
EXISTING TELE
EQUIPMENT TO REMAIN
EXISTING 4"
WASTE
(ABANDONE
D
)
NEW 5"
WASTE
NEW
WATER
METERS
DOMESTIC
WATER IN
SPRINKLER
LINE IN
8" STORM
DRAIN
5"
WASTE
4" WASTE
(ABANDON)
EXISTING WATER
METER (ABANDONED)
DN
NEW
MACHINE RM CONC. PADUP
DN
DN
SHARED
CORRIDOR
LANDLORD
EQUIPMENT
CLOSET
UP
RESIDENCE LOBBY
AA
BB
CC
DD
EE
2.42.32.21.1 1.3
GG
A
B
C
D
E
F
2.11.2 1.4
FF
1.35 2.25
BENCH
BENCH
BENCH
ELEVATOR
NEW
STAIR
TRASH AREA
UP
UP
DN
DN
STAIR 3
AMAZON HUBMAILBOXES
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
EXISTING
SPRINKLER TO
REMAIN
SP-1
SCALE: AS NOTED
FILE:
CHECKED: JPC
DRAWN: JPC
PREPARED BY:
CORNELIUSEN
CONSULTING
INC.
PREPARED FOR:
IN CONJUNCTION WITH:
PAGE 1 OF 5
REV 0.2
PROJECT:
217- 221 ESSEX
STREET SALEM AM
ADDRESS: 217 ESSEX STREET
SALEM MA
DATE: MAY 2020
ACS
BASEMENT SPRINKLER SYSTEM 1ST FLOOR SPRINKLER SYSTEM
DESIGN ENGINEER: JOEL CORNELIUSEN PE, FIRE
PROTECTION ENGINEER.
LICENSE # 46878 EXPIRES 6/30/2022
INSTALLATION COMPANY: TBD
GENERAL INFORMATION
1)PROVIDE FULL SPRINKLER COVERAGE
THROUGHOUT THE BUILDING.
2)EXISTING 4" BACKFLOW TO REMAIN. EXISTING
4" ALARM VALVE TO REMAIN
3)RELOCATE EXISTING 4" STANDPIPE VALVE AS
SHOWN.
4)EXISTING SPRINKLER SYSTEM SHALL REMAIN
WHERE INSTALLED PER CODE. EXISTING
SPRINKLER SYSTEMS SHALL BE TIED INTO
NEW FLOOR CONTROL VALVES
5)NEW FLOOR CONTROL VALVES INSTALLED
PER FLOOR PER BUILDING ( EACH FLOOR OF
THE OF 217 AND 221 SHALL HAVE INDIVIDUAL
FLOOR CONTROL VALVES, FLOW SWITCH AND
DRAIN.) APPROXIMATELY 11
6)INSTALL NEW SPRINKLER SYSTEM AS SHOWN
ON DRAWING. 100% SPRINKLER COVERAGE IN
ALL AREAS.
7)PROVIDE SPRINKLER PROTECTION IN
STORAGE SHELF ABOVE CLOSETS. (NOT
SHOWN FOR CLARITY)
SCOPE OF WORK
EXISTING 6" WATER SUPPLY
EXISTING 4" BACKFLOW AND
RISER TO REMAIN.
PROVIDE NEW 4" MAIN
TIE EXISTING SPRINKLER
SYSTEM INTO NEW FLOOR
CONTROL VALVE.
PROVIDE NEW 4" MAIN
DEDICATED STANDPIPE
PROVIDE NEW 4" MAIN FOR 221
BUILDING BASEMENT LEVEL
TIED INTO NEW FLOOR
CONTROL VALVES
PROVIDE 2 FLOOR CONTROL
VALVES FOR SPRINKLER
SYSTEMS ON 221 AND 217
BASEMENT LEVELS.
BUILDING 221
BUILDING 217
EXISTING MAIN
PROVIDE NEW SPRINKLER
SYSTEM WHERE NEEDED.
PROVIDE NEW SPRINKLER
SYSTEM WHERE NEEDED.
PROVIDE NEW SPRINKLER
FLOOR CONTROL VALVE (2)
NEW 4" STANDPIPE LOCATION
TIE EXISTING SPRINKLER
SYSTEM INTO NEW FLOOR
CONTROL VALVES.
TIE EXISTING SPRINKLER
SYSTEM INTO NEW FLOOR
CONTROL VALVES.
NEW FDC LOCATIONS
(STANDPIPE DRAWINGS
SUBMITTED SEPARATELY)
NEW 4"
STANDPIPE
LOCATION
NOTES:
STANDARD HEADS - MAX SPACING 15 X 15.
RESIDENTIAL HEADS - MAX SPACING 12 X 12 UNLESS NOTED
PIPE
1" = 1 HEAD
1 1
2" = 5 HEADS
2" = 6+ HEADS
ELECTRIC ROOM-
NO SPRINKLER
PROTECTION
NOTES:
STANDARD HEADS - MAX SPACING 15 X 15.
RESIDENTIAL HEADS - MAX SPACING 12 X 12 UNLESS NOTED
PIPE
1" = 1 HEAD
1 1
2" = 5 HEADS
2" = 6+ HEADS
AA
BB
CC
DD
EE
2.42.32.21.1 1.3
GG
A
B
C
D
E
F
2.11.2 1.4
FF
1.35 2.25
UP
DN
EXISTING
STAIR 1
DN4 RISERS @
5.5" EA = 1'-10"
NEW SHAFT
EXISTING SHAFT
TO
REMAIN
STAIR 2
217
HALLWAY
221
HALLWAY
ELEVATOR
MASTER BEDROOM
BEDROOM 2
LIVING
KITCHEN
LIVING
BEDROOM 2
MASTER BEDROOM
MASTER
BATHROOM
MASTER
BATHROOM
BATHROOM 2
KITCHEN
BATHROOM 2
MASTER BEDROOM
BEDROOM 2
KITCHEN
MASTER
BATHROOM
TVW/DCOATS
MECH
TVMECH W/DCOATSMECH TVCLOSETCLOSETCLOSET
COATSCLOSETW/DCLOSET
CLOSET
CLOSET
BATHROOM 2
DN
DN
UP
UP
NEW SHAFT FOR
FUTURE USECLOSETCLOSET
COATSTV
BATH 2
BEDROOM 2
MASTER
BEDROOM
MASTER
BATHROOM
KITCHEN
LIVING
W/D MECH
TV
MECH COATS
CLOSETCLOSETW/DLIVING
MASTER BEDROOM
MASTER
BATHROOM
BEDROOM 2
KITCHEN
BATHROOM 2
BEDROOM 2
MASTER
BEDROOM
TV
LIVING
COATS
MECH
KITCHEN
BATHROOM
CLOSETCOATS
MECH
CLOSET WDLINEN
217
HALLWAY
221
HALLWAY
AA
BB
CC
DD
EE
2.42.32.21.1 1.3
GG
A
B
C
D
E
F
2.11.2 1.4
FF
1.35 2.25
DN
EXIT SHAFT
TO
REMAIN
EXISTING
STAIR 1
ELEVATOR
BATHROOM 2CLOSETCLOSET
COATS
BEDROOM 2LIVING
MASTER
BEDROOM
MASTER
BATHROOM
W/D MECHTVKITCHEN
MASTER
BATHROOM
LIVING ROOM
MASTER BEDROOM
MECH COATS
CLOSETCLOSETBEDROOM 2
KITCHENW/DBATHROOM 2
COATSMECH
TV
BEDROOM 2
CLOSET
CLOSET
KITCHEN
LIVING
MASTER BEDROOM
BATHROOM 2
W/D
MASTER
BATHROOM
TV
OPEN TO
ABOVE
TV
OPEN TO
ABOVE
TV
OPEN TO
ABOVE
OPEN TO
ABOVECLOSETMECHCOATSCLOSET
LINEN
COATS
MECH
MECH
CLOSET
COATS
W/DW/DW/D
LIVINGKITCHEN
LIVING
LIVING
KITCHEN
BEDROOM 1
BATHROOM 1
BEDROOM 1
BATHROOM 1
BEDROOM 1
UP
UP
KITCHEN
BATHROOM 1 TVOPEN TO
ABOVE
OPEN TO
ABOVE
OPEN TO
ABOVE
OPEN TO
ABOVE
OPEN TO
ABOVE
OPEN TO
ABOVE
OPEN TO
ABOVE
UP
DNUP
DN
STAIR 2
NEW SHAFT
NEW SHAFT FOR
FUTURE USE
UP
SP-2
SCALE: AS NOTED
FILE:
CHECKED: JPC
DRAWN: JPC
PREPARED BY:
CORNELIUSEN
CONSULTING
INC.
PREPARED FOR:
IN CONJUNCTION WITH:
PAGE 2 OF 5
REV 0.2
PROJECT:
217- 221 ESSEX
STREET SALEM AM
ADDRESS: 217 ESSEX STREET
SALEM MA
DATE: MAY 2020
ACS
2ND FLOOR SPRINKLER SYSTEM 3RD FLOOR SPRINKLER SYSTEM
NEW 4"
STANDPIPE
LOCATION
NEW FLOOR
CONTROL
VALVES. (2)
NEW 2" MAIN
NEW 2" MAIN
NEW 1 1/2" BRANCH LINE
NEW 1 1/2" BRANCH LINE
NEW FLOOR
CONTROL
VALVES. (2)
NEW FLOOR
CONTROL
VALVES. (1) SEE
3RD FLOOR
MEZZANINE
SPRINKLER
SYSTEM
NOTES:
STANDARD HEADS - MAX SPACING 15 X 15.
RESIDENTIAL HEADS - MAX SPACING 12 X 12 UNLESS NOTED
PIPE
1" = 1 HEAD
1 1
2" = 5 HEADS
2" = 6+ HEADS
NOTES:
STANDARD HEADS - MAX SPACING 15 X 15.
RESIDENTIAL HEADS - MAX SPACING 12 X 12 UNLESS NOTED
PIPE
1" = 1 HEAD
1 1
2" = 5 HEADS
2" = 6+ HEADS
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
OPEN TO
BELOW
AA
BB
CC
DD
EE
2.42.32.21.1 1.3
GG
A
B
C
D
E
F
2.11.2 1.4
FF
1.35 2.25
BATHROOM 2
BATHROOM 2
BATHROOM 2
EXISTING
STAIR 1
COMMON CORRIDOR BELOW
DNDNBEDROOM 2
BALCONY
CLOSETCLOSET BEDROOM 2
BEDROOM 2 CLOSETUP
DN CLOSETCLOSET
LINEN
COATS
DN
KITCHEN
COATSMECHCLOSET MECH
COATSTVBEDROOM
BATH
KITCHEN
LIVING
CLOSETBATHROOM
BEDROOM
LINEN W/DW/DBATHROOM
LIVING
KITCHEN
BEDROOM
CLOSETW/DMECH
COATSTV
BATHROOMCLOSET
BEDROOM W/DCOATS
MECH
LIVING
LIVING
KITCHEN
TV
TV
AA
BB
CC
DD
EE
2.42.32.21.1 1.3
GG
2.11.2 1.4
FF
1.35 2.25
221
HALLWAY
UPDN
DN
EXIT SHAFT
TO
REMAIN
EXISTING
STAIR 1
STAIR 2
ELEVATOR
UP
DN
NEW SHAFT FOR
FUTURE USE
SP-3
SCALE: AS NOTED
FILE:
CHECKED: JPC
DRAWN: JPC
PREPARED BY:
CORNELIUSEN
CONSULTING
INC.
PREPARED FOR:
IN CONJUNCTION WITH:
PAGE 3 OF 5
REV 0.1
PROJECT:
217- 221 ESSEX
STREET SALEM AM
ADDRESS: 217 ESSEX STREET
SALEM MA
DATE: MAY 2020
ACS
3RD FLOOR LOFT SPRINKLER SYSTEM 4TH FLOOR SPRINKLER SYSTEM
SEE 3RD FLOOR
SPRINKLER
SYSTEM NEW FLOOR
CONTROL
VALVES. (1)
NOTES:
STANDARD HEADS - MAX SPACING 15 X 15.
RESIDENTIAL HEADS - MAX SPACING 12 X 12 UNLESS NOTED
PIPE
1" = 1 HEAD
1 1
2" = 5 HEADS
2" = 6+ HEADS
NOTES:
STANDARD HEADS - MAX SPACING 15 X 15.
RESIDENTIAL HEADS - MAX SPACING 12 X 12 UNLESS NOTED
PIPE
1" = 1 HEAD
1 1
2" = 5 HEADS
2" = 6+ HEADS
PIPE OVERSIZED
FOR 16 X 18
COVERAGE
AA
BB
CC
DD
EE
2.42.32.21.1 1.3
GG
A
B
C
D
E
F
2.11.2 1.4
FF
1.35 2.25
DN
DN
EXIT SHAFT
TO
REMAIN
PROPOSED VERIZON
EQUIPMENT ROOM
200 SF
STAIR 2
EXISTING
STAIR 1
221
HALLWAY
ELEVATOR
KITCHEN
COATSMECH
LIVINGCLOSET MECH
COATSTVBEDROOM
BATH
KITCHEN
LIVING
CLOSETBATHROOM
BEDROOM
LINEN W/DW/DBATHROOM
LIVING
KITCHEN
BEDROOM
CLOSETW/DMECH
COATSTV
BATHROOMCLOSET
LIVING
BEDROOM
KITCHEN
TV W/DCOATS
MECH
TV
DN
DN
NEW SHAFT FOR
FUTURE USE
²
²
²
SP-4
SCALE: AS NOTED
FILE:
CHECKED: JPC
DRAWN: JPC
PREPARED BY:
CORNELIUSEN
CONSULTING
INC.
PREPARED FOR:
IN CONJUNCTION WITH:
PAGE 4 OF 5
REV 0.1
PROJECT:
217- 221 ESSEX
STREET SALEM AM
ADDRESS: 217 ESSEX STREET
SALEM MA
DATE: MAY 2020
ACS
5TH FLOOR LOFT SPRINKLER SYSTEM
PROPOSED VERIZON ROOM
GASEOUS FIRE SUPPRESSION
AND DETECTION TBD. DESIGN
AND INSTALLED BY OTHERS.
PROVIDE SPRINKLER
PROTECTION FOR ROOF TOP
DOG HOUSE. (NOT SHOWN).
GENERAL NOTES:
GENERAL SPRINKLER NOTES.
NOTES:
STANDARD HEADS - MAX SPACING 15 X 15.
RESIDENTIAL HEADS - MAX SPACING 12 X 12 UNLESS NOTED
PIPE
1" = 1 HEAD
1 1
2" = 5 HEADS
2" = 6+ HEADS
PRE-ACTION ROOM WITH 2"
DRY VALVE