217-221 Essex Street_Temporary Construction Fire Alarm ProtectionThese drawings and specifications are the property and copyright of SOUSA design Architects and shall not be used in whole or in part, or shall be assigned to a third party without the express written permission of SOUSA design Architects .Contractor to verify all information and dimensions in the field prior to start of construction and is to notify SOUSA design Architects of any discrepancies
Revisions
Job #
Drawn by Ckd by
Date
SOUSA design
A r c h i t e c t s
81 Boylston St., 2nd Floor
Brookline , MA. 02445
617 . 879 . 9100
www.sousadesign .com
217-221 Essex Street
Salem, MA 01970
ISSUED FOR:
ALL DRAWINGS , SPECIFICATIONS AND
ARCHITECTURAL DESIGNS ARE THE
PROPERTY OF SOUSA DESIGN
ARCHITECTS AND SHALL NOT BE
REPRODUCED OR USED ON THIS OR
ANY OTHER PROJECT WITHOUT
WRITTEN CONSENT FROM THE
ARCHITECT.
THE CONTRACTOR SHALL CHECK AND
VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS ON SITE PRIOR TO
BEGINNING ANY WORK, REPORT ALL
DISCREPANCIES IN WRITING TO SOUSA
DESIGN ARCHITECTS BEFORE
PROCEEDING WITH THE WORK, AND
SHALL ACCEPT FULL RESPONSIBILITY
FOR SAME. DRAWINGS SHALL NOT BE
SCALED . ALL WORK SHALL BE CARRIED
OUT IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS , AND
TO THE SATISFACTION OF THE OWNER
AND THE ARCHITECT.
EACH CONTRACTOR SHALL SUBMIT TO
SOUSA DESIGN ARCHITECTS FOR
APPROVAL; SHOP DRAWINGS , SAMPLES ,
CUTS OF ALL THE ITEMS OF WORK
PRIOR TO THEIR INCLUSION IN THE
CONSTRUCTION . ALL ITEMS TO BE
INCLUDED SHALL BE APPROVED FOR
USE IN THE CITY OF SALEM AND SHALL
HAVE AN ASTM AND UL NUMBER WHEN
SUCH ITEMS REQUIRE THIS
DESIGNATION . EACH CONTRACTOR
SHALL CO-ORDINATE HIS WORK WITH
ALL OTHER CONTRACTORS .
THE QUALITY OF WORKMANSHIP AND
MATERIALS USED SHALL COMPLY WITH
ALL CITY OF SALEM AND MA STATE
BUILDING CODES . DRAWINGS SUBJECT
TO APPROVAL BY ALL GOVERNMENTAL
AGENCIES HAVING JURISDICTION ALL
NEW CONSTRUCTION TO COMPLY WITH
APPLICABLE HANDICAPPED
ACCESSIBILITY LAWS.
10.22.2019
SDA S.A.S.
PROGRESS SET
1863
SECOND FLOOR
DEMO PLAN
D-1.2
UP
DN
UP
DN
F.F.L. = 16' - 5"
F.F.L. = 14' - 10"F.F.L. = 14' - 10"
DN
DN
UP
F.F.L. = 14' - 10"
F.F.L. = 17' - 0 1/2"
F.F.L. = 14' - 10"
F.F.L. = 14' - 10"
F.F.L. = 14' - 10"
F.F.L. = 16' - 5"
F.F.L. = 16' - 5"
F.F.L. = 16' - 5"
F.F.L. = 16' - 5"
F.F.L. = 16' - 5"31'-4 3/4"31'-9 7/8"37'-11 5/8"30'-5"29'-9 3/8"23'-8 1/4"
F.F.L. = 14' - 10"
DN
UP
UP
88'-4 7/8"93'-5 7/8"84'-2 1/4"80'-8 3/4"SILL: 8"
HEAD: 8' - 6 1/2"
SILL: 8"
HEAD: 8' - 6 1/2"
SILL: 8"
HEAD: 8' - 6 1/2"SILL: 8"HEAD: 8' - 9"SILL: 8"HEAD: 8' - 9"SILL: 8"
HEAD: 8' - 6 1/2"
SILL: 8"
HEAD: 8' - 6 1/2"
SILL: 8"
HEAD: 8' - 6 1/2"
SILL: 1'-10"
HEAD: 9' - 9"
SILL: 1'-10"
HEAD: 9' - 9"SILL: 1'-10"HEAD: 9' - 9"SILL: 1'-10"HEAD: 9' - 9"SILL: 1'-10"HEAD: 9' - 9"SILL: 1'-10"HEAD: 9' - 9"SILL: 1'-10"HEAD: 9' - 9"SILL: 1'-10"HEAD: 9' - 9"SILL: 1'-10"
HEAD: 9' - 9"
SILL: 1'-10"
HEAD: 9' - 9"
SILL: 1'-10"
HEAD: 9' - 9"SILL: 8"HEAD: 8' - 9"SILL: 8"HEAD: 8' - 9"SILL: 8"HEAD: 8' - 9"SILL: 8"HEAD: 8' - 9"SILL: 8"HEAD: 8' - 9"19'-11 5/8"19'-11 1/2"F.F.L. = 16' - 5"
8'-1"
F.F.L. = 14' - 10"
SILL: 1'-8"
HEAD: 10' - 2"SILL: 1'-8"
HEAD: 10' - 2"SILL: 1'-8"
HEAD: 10' - 2"SILL: 1'-8"
HEAD: 10' - 2"SILL: 1'-8"
HEAD: 10' - 2"SILL: 1'-8"
HEAD: 10' - 2"SILL: 1'-8"
HEAD: 10' - 2"SILL: 1'-8"HEAD: 10' - 2"SILL: 1'-10"
HEAD: 9' - 9"
REFER TO GENERAL
DEMOLITION NOTES/
LEGEND
REFER TO GENERAL
DEMOLITION NOTES/
LEGEND
RETAIN EXISTING
STAIR ASSEMBLY
AA
BB
CC
DD
EE
2.42.32.21.1 1.2
GG
1.3
A
B
C
D
E
F
2.1
FF
REMOVE EXISTING
FIRE ESCAPE
REMOVE EXISTING
FIRE ESCAPE
217-221 SECOND FLOOR DEMOLITION PLAN
Scale: 3/16" = 1'-0"1
REMOVE ALL EXISTING FLOOR MATERIALS DOWN TO EXISTING
HARD WOOD FLOOR OR IF UNSTABLE , DOWN TO SUB FLOOR .
1. GC shall coordinate scope of demolition with the
work shown on the plans .
2. GC shall confirm demolition scope with a field
visit prior to bid.
3. GC is responsible to identifying any hazardous
materials and abating in manner consistent with
current regulations .
DEMOLITION GENERAL NOTES
REMOVE EXISTING INTERIOR WALLS , COLUMN
ENCLOSURES , ACCESSORIES , DOORS , BRACKETS ,
BUILT-IN CASEWORK IN THEIR ENTIRETY. TYPICAL
ALL AREAS .
REMOVE ALL EXISTING SUSPENDED CEILINGS , GYP. BD.
CEILINGS , PLASTER CEILING AND GYP. BD. SOFFITS IN THEIR
ENTIRETY.
DEMOLITION SCOPE NOTES LEGEND
INTERIOR BASEBOARD HEATING , RADIATOR & ASSOCIATED
PIPING TO BE REMOVED IN THEIR ENTIRETY.
REMOVE ABANDON INTERIOR EXISTING AIR HANDLERS , DUCTS
AND ASSOCIATED PLUMBING AND ELECTRICAL IN THEIR
ENTIRETY.
REMOVE EXISTING DOORS , ASSOCIATED HARDWARE , FRAME
AND TRIMS IN THEIR ENTIRETY.
REMOVE EXISTING INTERIOR LATH/PLASTER FINISHES
BACK TO EXISTING STUDS OR MASONRY WALL
REMOVE EXISTING ABANDON SANITARY PIPE AND VENT IN
THEIR ENTIRETY.
01
02
03
04
05
06
09
10
11
REMOVED ABANDON EXISTING BOILER AND ASSOCIATED PIPING
IN THEIR ENTIRETY.
07
08
REMOVED ABANDON INTERIOR EXISTING PLUMBING FIXTURES
IN THEIR ENTIRETY.
REMOVE ALL ABANDON LIGHT FIXTURES , DUCTWORK , VENTS ,
AIR CONDITIONERS IN THEIR ENTIRETY.
1.THE CONTRACTOR SHALL MAINTAIN POWER TO EXISTING
EXIST SIGNS , FIRE ALARM DEVICES , EMERGENCY LIGHTS , CO
DETECTORS FIRE PROTECTIONS , STANDING PIPES AND
SECURITY ALARM DURING DEMOLITON AND CONSTRUCTION .
2. EXISTING STRUCTURAL COMPONENTS TO REMAIN , COLUMNS ,
BEARING WALLS , BEAMS , FLOOR FRAMING AND ROOF
FRAMING .
3. CONTRACTOR SHALL CAREFULLY COORDINATE DEMO WITH
PROPOSED NEW FRAMING AND PROVIDE TEMPORARY
STRUCTURAL SHORING AND / OR OTHER MEANS OF
STABLIZING THE EXISTING STRUCTURE .
GENERAL NOTES
DEMOLITION LEGEND
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
1.THE CONTRACTOR SHALL VISUALLY INSPECT THE SITE TO
DETERMINE THE CONDITIONS OF EXISTING CONSTRUCTION
AND FAMILIARIZETHEMSELVES WITH THE PROPOSED WORK .
THE CONTRACTOR SHALLREVIEW ALL EXISTING ORIGINAL
BUILDING DRAWINGS AS PROVIDE BY BY THE GC.
2.DISCONNECTION OF UTILITIES AND UTILITY LINES TO BE
ABANDONED SHALL BE DISCONNECTED , REMOVED AS
REQUIRED AND/OR CAPPED OFF ACCORDANCE WITH THE
LATEST APPLICABLE CODES AND REGULATION .
3.TO THE BEST OF OWNER'S KNOWLEDGE THERE ARE NO
HAZARDOUS MATERIALS , HOWEVER GIVEN THE AGE OF THE
BUILDING CANNOT GUARANTEED THAT NONE ARE PRESENT.
CONTRACTOR SHALL BE DILIGENT IN IDENTIFYING ANY
SUSPECT MATERIALS AND SHALL NOTIFY OWNER IF ANY ARE
ENCOUNTERED . CONTRACTOR SHALL COOPERATE WITH
OWNER IN COORDINATING ALL ABATEMENT, REMOVAL AND
DISPOSAL OF ANY HAZARDOUS MATERIALS .
DEMOLITION GENERAL NOTES
REMOVE EXISTING WINDOWS , ASSOCIATED HARDWARE , FRAME
AND TRIMS IN THEIR ENTIRETY.
12
REMOVE EXISTING MEMBRANE ROOFING , FLASHING ,
EQUIPMENT CURBS , INSULATION AND COPPER BASE , CAP AND
PARAPET WALL FLASHING IN THEIR ENTIRETY.
13
RETAIN EXISTING
4. CONTRACTOR SHALL BE DILIGENT IN CUTTING ,MODIFYING
OR REMOVAL OF ANY STRUCTURAL COMPONENT AND
PROVIDE ALL REQUIRED TEMPORARY SHORING/FRAMING TO
STABILIZE THE STRUCTURE AND AVOID ANY
SETTLEMENT OR DAMAGE .
5.THE ONWER WILL PROVIDE A SUREY OF EXISTING
CONDITIONS WITH REGARDS TO THE PRESENT OF
HAZARDOUS MATERIALS . IT IS INTENTION OF THIS
PROJECTED THAT ANY WORK ASSOCIATED WITH
HAZARDOUS MATERIALS (INCLUDING , BUT NOT LIMETED TO
ASBESTOS QUALIFIED CONSULTING/ABATEMENT WORK
(IDENTIFICATION , TESTING , THE OWNER'S CONSULTING
ABATEMENT FIRM).
REMOVE EXISTING STRUCTURES TO
ACCOMODATE NEW STAIRS , ELEVATOR
SHAFTS , AND FLOOR LEVEL CHANGES
14 REMOVE WINDOW SASH ASSEMBLY AT 221 ESSEX ST. WINDOWS
ONLY.
GENERAL AREA OF DEMOLITION WORK
These drawings and specifications are the property and copyright of SOUSA design Architects and shall not be used in whole or in part, or shall be assigned to a third party without the express written permission of SOUSA design Architects .Contractor to verify all information and dimensions in the field prior to start of construction and is to notify SOUSA design Architects of any discrepancies
Revisions
Job #
Drawn by Ckd by
Date
SOUSA design
A r c h i t e c t s
81 Boylston St., 2nd Floor
Brookline , MA. 02445
617 . 879 . 9100
www.sousadesign .com
217-221 Essex Street
Salem, MA 01970
ISSUED FOR:
ALL DRAWINGS , SPECIFICATIONS AND
ARCHITECTURAL DESIGNS ARE THE
PROPERTY OF SOUSA DESIGN
ARCHITECTS AND SHALL NOT BE
REPRODUCED OR USED ON THIS OR
ANY OTHER PROJECT WITHOUT
WRITTEN CONSENT FROM THE
ARCHITECT.
THE CONTRACTOR SHALL CHECK AND
VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS ON SITE PRIOR TO
BEGINNING ANY WORK, REPORT ALL
DISCREPANCIES IN WRITING TO SOUSA
DESIGN ARCHITECTS BEFORE
PROCEEDING WITH THE WORK, AND
SHALL ACCEPT FULL RESPONSIBILITY
FOR SAME. DRAWINGS SHALL NOT BE
SCALED . ALL WORK SHALL BE CARRIED
OUT IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS , AND
TO THE SATISFACTION OF THE OWNER
AND THE ARCHITECT.
EACH CONTRACTOR SHALL SUBMIT TO
SOUSA DESIGN ARCHITECTS FOR
APPROVAL; SHOP DRAWINGS , SAMPLES ,
CUTS OF ALL THE ITEMS OF WORK
PRIOR TO THEIR INCLUSION IN THE
CONSTRUCTION . ALL ITEMS TO BE
INCLUDED SHALL BE APPROVED FOR
USE IN THE CITY OF SALEM AND SHALL
HAVE AN ASTM AND UL NUMBER WHEN
SUCH ITEMS REQUIRE THIS
DESIGNATION . EACH CONTRACTOR
SHALL CO-ORDINATE HIS WORK WITH
ALL OTHER CONTRACTORS .
THE QUALITY OF WORKMANSHIP AND
MATERIALS USED SHALL COMPLY WITH
ALL CITY OF SALEM AND MA STATE
BUILDING CODES . DRAWINGS SUBJECT
TO APPROVAL BY ALL GOVERNMENTAL
AGENCIES HAVING JURISDICTION ALL
NEW CONSTRUCTION TO COMPLY WITH
APPLICABLE HANDICAPPED
ACCESSIBILITY LAWS.
10.22.2019
SDA S.A.S.
PROGRESS SET
1863
THIRD FLOOR
DEMO PLAN
D-1.3217-221 THIRD FLOOR DEMOLITION PLAN
Scale: 3/16" = 1'-0"1
SILL: 1'-5"
HEAD: 8' - 6 1/2"
SILL: 1'-5"
HEAD: 8' - 6 1/2"
SILL: 1'-5"
HEAD: 8' - 6 1/2"
SILL: 1'-5"
HEAD: 8' - 6 1/2"
SILL: 1'-5"
HEAD: 8' - 6 1/2"
SILL: 1'-5"
HEAD: 8' - 6 1/2"
SILL: 1'-6"
HEAD: 11' - 4 1/2"
SILL: 1'-6"
HEAD: 11' - 4 1/2"
SILL: 1'-6"
HEAD: 11' - 4 1/2"SILL: 1'-6"HEAD: 11' - 4 1/2"SILL: 1'-6"HEAD: 11' - 4 1/2"SILL: 1'-6"HEAD: 11' - 4 1/2"SILL: 1'-6"HEAD: 11' - 4 1/2"SILL: 1'-6"HEAD: 11' - 4 1/2"SILL: 1'-6"HEAD: 11' - 4 1/2"SILL: 1'-6"
HEAD: 11' - 4 1/2"
SILL: 1'-6"
HEAD: 11' - 4 1/2"
SILL: 1'-6"
HEAD: 11' - 4 1/2"
SILL: 2'-2 1/2"
HEAD: 10' - 0 1/2"
SILL: 2'-2 1/2"
HEAD: 10' - 0 1/2"
SILL: 2'-2 1/2"
HEAD: 10' - 0 1/2"
SILL: 2'-2 1/2"
HEAD: 10' - 0 1/2"
SILL: 2'-2 1/2"
HEAD: 10' - 0 1/2"
SILL: 2'-2 1/2"
HEAD: 10' - 0 1/2"SILL: 2'-2 1/2"HEAD: 10' - 0 1/2"SILL: 1'-5"HEAD: 8' - 11"SILL: 1'-5"HEAD: 8' - 11"SILL: 1'-5"HEAD: 8' - 11"SILL: 1'-5"HEAD: 8' - 11"SILL: 1'-5"HEAD: 8' - 11"SILL: 1'-5"HEAD: 8' - 11"SILL: 1'-5"HEAD: 8' - 11"SILL: 1'-5"HEAD: 8' - 11"84'-2 1/4"93'-5 7/8"80'-8 3/4"88'-4 7/8"
F.F.L. = 28' - 3"
UP
DN
UP
DN
DN
UP
REFER TO GENERAL
DEMOLITION NOTES/
LEGEND
REFER TO GENERAL
DEMOLITION NOTES/
LEGEND
RETAIN EXISTING
STAIR ASSEMBLY
AA
BB
CC
DD
EE
2.42.32.21.1 1.2
GG
1.3
A
B
C
D
E
F
2.1
FF
REMOVE DOOR
ASSEMBLY
REMOVE EXISTING
FIRE ESCAPE
REMOVE EXISTING
FIRE ESCAPE
REMOVE ALL EXISTING FLOOR MATERIALS DOWN TO EXISTING
HARD WOOD FLOOR OR IF UNSTABLE , DOWN TO SUB FLOOR .
1. GC shall coordinate scope of demolition with the
work shown on the plans .
2. GC shall confirm demolition scope with a field
visit prior to bid.
3. GC is responsible to identifying any hazardous
materials and abating in manner consistent with
current regulations .
DEMOLITION GENERAL NOTES
REMOVE EXISTING INTERIOR WALLS , COLUMN
ENCLOSURES , ACCESSORIES , DOORS , BRACKETS ,
BUILT-IN CASEWORK IN THEIR ENTIRETY. TYPICAL
ALL AREAS .
REMOVE ALL EXISTING SUSPENDED CEILINGS , GYP. BD.
CEILINGS , PLASTER CEILING AND GYP. BD. SOFFITS IN THEIR
ENTIRETY.
DEMOLITION SCOPE NOTES LEGEND
INTERIOR BASEBOARD HEATING , RADIATOR & ASSOCIATED
PIPING TO BE REMOVED IN THEIR ENTIRETY.
REMOVE ABANDON INTERIOR EXISTING AIR HANDLERS , DUCTS
AND ASSOCIATED PLUMBING AND ELECTRICAL IN THEIR
ENTIRETY.
REMOVE EXISTING DOORS , ASSOCIATED HARDWARE , FRAME
AND TRIMS IN THEIR ENTIRETY.
REMOVE EXISTING INTERIOR LATH/PLASTER FINISHES
BACK TO EXISTING STUDS OR MASONRY WALL
REMOVE EXISTING ABANDON SANITARY PIPE AND VENT IN
THEIR ENTIRETY.
01
02
03
04
05
06
09
10
11
REMOVED ABANDON EXISTING BOILER AND ASSOCIATED PIPING
IN THEIR ENTIRETY.
07
08
REMOVED ABANDON INTERIOR EXISTING PLUMBING FIXTURES
IN THEIR ENTIRETY.
REMOVE ALL ABANDON LIGHT FIXTURES , DUCTWORK , VENTS ,
AIR CONDITIONERS IN THEIR ENTIRETY.
1.THE CONTRACTOR SHALL MAINTAIN POWER TO EXISTING
EXIST SIGNS , FIRE ALARM DEVICES , EMERGENCY LIGHTS , CO
DETECTORS FIRE PROTECTIONS , STANDING PIPES AND
SECURITY ALARM DURING DEMOLITON AND CONSTRUCTION .
2. EXISTING STRUCTURAL COMPONENTS TO REMAIN , COLUMNS ,
BEARING WALLS , BEAMS , FLOOR FRAMING AND ROOF
FRAMING .
3. CONTRACTOR SHALL CAREFULLY COORDINATE DEMO WITH
PROPOSED NEW FRAMING AND PROVIDE TEMPORARY
STRUCTURAL SHORING AND / OR OTHER MEANS OF
STABLIZING THE EXISTING STRUCTURE .
GENERAL NOTES
DEMOLITION LEGEND
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
1.THE CONTRACTOR SHALL VISUALLY INSPECT THE SITE TO
DETERMINE THE CONDITIONS OF EXISTING CONSTRUCTION
AND FAMILIARIZETHEMSELVES WITH THE PROPOSED WORK .
THE CONTRACTOR SHALLREVIEW ALL EXISTING ORIGINAL
BUILDING DRAWINGS AS PROVIDE BY BY THE GC.
2.DISCONNECTION OF UTILITIES AND UTILITY LINES TO BE
ABANDONED SHALL BE DISCONNECTED , REMOVED AS
REQUIRED AND/OR CAPPED OFF ACCORDANCE WITH THE
LATEST APPLICABLE CODES AND REGULATION .
3.TO THE BEST OF OWNER'S KNOWLEDGE THERE ARE NO
HAZARDOUS MATERIALS , HOWEVER GIVEN THE AGE OF THE
BUILDING CANNOT GUARANTEED THAT NONE ARE PRESENT.
CONTRACTOR SHALL BE DILIGENT IN IDENTIFYING ANY
SUSPECT MATERIALS AND SHALL NOTIFY OWNER IF ANY ARE
ENCOUNTERED . CONTRACTOR SHALL COOPERATE WITH
OWNER IN COORDINATING ALL ABATEMENT, REMOVAL AND
DISPOSAL OF ANY HAZARDOUS MATERIALS .
DEMOLITION GENERAL NOTES
REMOVE EXISTING WINDOWS , ASSOCIATED HARDWARE , FRAME
AND TRIMS IN THEIR ENTIRETY.
12
REMOVE EXISTING MEMBRANE ROOFING , FLASHING ,
EQUIPMENT CURBS , INSULATION AND COPPER BASE , CAP AND
PARAPET WALL FLASHING IN THEIR ENTIRETY.
13
RETAIN EXISTING
4. CONTRACTOR SHALL BE DILIGENT IN CUTTING ,MODIFYING
OR REMOVAL OF ANY STRUCTURAL COMPONENT AND
PROVIDE ALL REQUIRED TEMPORARY SHORING/FRAMING TO
STABILIZE THE STRUCTURE AND AVOID ANY
SETTLEMENT OR DAMAGE .
5.THE ONWER WILL PROVIDE A SUREY OF EXISTING
CONDITIONS WITH REGARDS TO THE PRESENT OF
HAZARDOUS MATERIALS . IT IS INTENTION OF THIS
PROJECTED THAT ANY WORK ASSOCIATED WITH
HAZARDOUS MATERIALS (INCLUDING , BUT NOT LIMETED TO
ASBESTOS QUALIFIED CONSULTING/ABATEMENT WORK
(IDENTIFICATION , TESTING , THE OWNER'S CONSULTING
ABATEMENT FIRM).
REMOVE EXISTING STRUCTURES TO
ACCOMODATE NEW STAIRS , ELEVATOR
SHAFTS , AND FLOOR LEVEL CHANGES
14 REMOVE WINDOW SASH ASSEMBLY AT 221 ESSEX ST. WINDOWS
ONLY.
GENERAL AREA OF DEMOLITION WORK
SILL: 1'-7"
HEAD: 7' - 11"
SILL: 1'-7"
HEAD: 7' - 11"
SILL: 1'-7"
HEAD: 7' - 11"
SILL: 1'-7"
HEAD: 7' - 11"
SILL: 1'-7"
HEAD: 7' - 11"
SILL: 1'-7"
HEAD: 7' - 11"SILL: 1'-8"HEAD: 8' - 5"SILL: 1'-8"HEAD: 8' - 5"SILL: 1'-8"HEAD: 8' - 5"SILL: 1'-8"HEAD: 8' - 5"SILL: 1'-8"HEAD: 8' - 5"SILL: 1'-8"HEAD: 8' - 5"SILL: 1'-8"HEAD: 8' - 5"SILL: 1'-8"HEAD: 8' - 5"80'-8 3/4"44'-10 3/4"87'-0 1/2"DN
DN
UP
DN
UP
DNUP
REFER TO GENERAL
DEMOLITION NOTES/
LEGEND
AA
BB
CC
DD
EE
2.42.32.21.1 1.2
GG
1.3
A
B
C
D
E
F
2.1
FF
REMOVE EXISTING
FIRE ESCAPE
REMOVE EXISTING
FIRE ESCAPE
217-221 FOURTH FLOOR DEMOLITION PLAN
Scale: 3/16" = 1'-0"1
These drawings and specifications are the property and copyright of SOUSA design Architects and shall not be used in whole or in part, or shall be assigned to a third party without the express written permission of SOUSA design Architects .Contractor to verify all information and dimensions in the field prior to start of construction and is to notify SOUSA design Architects of any discrepancies
Revisions
Job #
Drawn by Ckd by
Date
SOUSA design
A r c h i t e c t s
81 Boylston St., 2nd Floor
Brookline , MA. 02445
617 . 879 . 9100
www.sousadesign .com
217-221 Essex Street
Salem, MA 01970
ISSUED FOR:
ALL DRAWINGS , SPECIFICATIONS AND
ARCHITECTURAL DESIGNS ARE THE
PROPERTY OF SOUSA DESIGN
ARCHITECTS AND SHALL NOT BE
REPRODUCED OR USED ON THIS OR
ANY OTHER PROJECT WITHOUT
WRITTEN CONSENT FROM THE
ARCHITECT.
THE CONTRACTOR SHALL CHECK AND
VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS ON SITE PRIOR TO
BEGINNING ANY WORK, REPORT ALL
DISCREPANCIES IN WRITING TO SOUSA
DESIGN ARCHITECTS BEFORE
PROCEEDING WITH THE WORK, AND
SHALL ACCEPT FULL RESPONSIBILITY
FOR SAME. DRAWINGS SHALL NOT BE
SCALED . ALL WORK SHALL BE CARRIED
OUT IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS , AND
TO THE SATISFACTION OF THE OWNER
AND THE ARCHITECT.
EACH CONTRACTOR SHALL SUBMIT TO
SOUSA DESIGN ARCHITECTS FOR
APPROVAL; SHOP DRAWINGS , SAMPLES ,
CUTS OF ALL THE ITEMS OF WORK
PRIOR TO THEIR INCLUSION IN THE
CONSTRUCTION . ALL ITEMS TO BE
INCLUDED SHALL BE APPROVED FOR
USE IN THE CITY OF SALEM AND SHALL
HAVE AN ASTM AND UL NUMBER WHEN
SUCH ITEMS REQUIRE THIS
DESIGNATION . EACH CONTRACTOR
SHALL CO-ORDINATE HIS WORK WITH
ALL OTHER CONTRACTORS .
THE QUALITY OF WORKMANSHIP AND
MATERIALS USED SHALL COMPLY WITH
ALL CITY OF SALEM AND MA STATE
BUILDING CODES . DRAWINGS SUBJECT
TO APPROVAL BY ALL GOVERNMENTAL
AGENCIES HAVING JURISDICTION ALL
NEW CONSTRUCTION TO COMPLY WITH
APPLICABLE HANDICAPPED
ACCESSIBILITY LAWS.
10.22.2019
SDA S.A.S.
PROGRESS SET
1863
FOURTH FLOOR
DEMO PLAN
D-1.4
REMOVE ALL EXISTING FLOOR MATERIALS DOWN TO EXISTING
HARD WOOD FLOOR OR IF UNSTABLE , DOWN TO SUB FLOOR .
1. GC shall coordinate scope of demolition with the
work shown on the plans .
2. GC shall confirm demolition scope with a field
visit prior to bid.
3. GC is responsible to identifying any hazardous
materials and abating in manner consistent with
current regulations .
DEMOLITION GENERAL NOTES
REMOVE EXISTING INTERIOR WALLS , COLUMN
ENCLOSURES , ACCESSORIES , DOORS , BRACKETS ,
BUILT-IN CASEWORK IN THEIR ENTIRETY. TYPICAL
ALL AREAS .
REMOVE ALL EXISTING SUSPENDED CEILINGS , GYP. BD.
CEILINGS , PLASTER CEILING AND GYP. BD. SOFFITS IN THEIR
ENTIRETY.
DEMOLITION SCOPE NOTES LEGEND
INTERIOR BASEBOARD HEATING , RADIATOR & ASSOCIATED
PIPING TO BE REMOVED IN THEIR ENTIRETY.
REMOVE ABANDON INTERIOR EXISTING AIR HANDLERS , DUCTS
AND ASSOCIATED PLUMBING AND ELECTRICAL IN THEIR
ENTIRETY.
REMOVE EXISTING DOORS , ASSOCIATED HARDWARE , FRAME
AND TRIMS IN THEIR ENTIRETY.
REMOVE EXISTING INTERIOR LATH/PLASTER FINISHES
BACK TO EXISTING STUDS OR MASONRY WALL
REMOVE EXISTING ABANDON SANITARY PIPE AND VENT IN
THEIR ENTIRETY.
01
02
03
04
05
06
09
10
11
REMOVED ABANDON EXISTING BOILER AND ASSOCIATED PIPING
IN THEIR ENTIRETY.
07
08
REMOVED ABANDON INTERIOR EXISTING PLUMBING FIXTURES
IN THEIR ENTIRETY.
REMOVE ALL ABANDON LIGHT FIXTURES , DUCTWORK , VENTS ,
AIR CONDITIONERS IN THEIR ENTIRETY.
1.THE CONTRACTOR SHALL MAINTAIN POWER TO EXISTING
EXIST SIGNS , FIRE ALARM DEVICES , EMERGENCY LIGHTS , CO
DETECTORS FIRE PROTECTIONS , STANDING PIPES AND
SECURITY ALARM DURING DEMOLITON AND CONSTRUCTION .
2. EXISTING STRUCTURAL COMPONENTS TO REMAIN , COLUMNS ,
BEARING WALLS , BEAMS , FLOOR FRAMING AND ROOF
FRAMING .
3. CONTRACTOR SHALL CAREFULLY COORDINATE DEMO WITH
PROPOSED NEW FRAMING AND PROVIDE TEMPORARY
STRUCTURAL SHORING AND / OR OTHER MEANS OF
STABLIZING THE EXISTING STRUCTURE .
GENERAL NOTES
DEMOLITION LEGEND
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
1.THE CONTRACTOR SHALL VISUALLY INSPECT THE SITE TO
DETERMINE THE CONDITIONS OF EXISTING CONSTRUCTION
AND FAMILIARIZETHEMSELVES WITH THE PROPOSED WORK .
THE CONTRACTOR SHALLREVIEW ALL EXISTING ORIGINAL
BUILDING DRAWINGS AS PROVIDE BY BY THE GC.
2.DISCONNECTION OF UTILITIES AND UTILITY LINES TO BE
ABANDONED SHALL BE DISCONNECTED , REMOVED AS
REQUIRED AND/OR CAPPED OFF ACCORDANCE WITH THE
LATEST APPLICABLE CODES AND REGULATION .
3.TO THE BEST OF OWNER'S KNOWLEDGE THERE ARE NO
HAZARDOUS MATERIALS , HOWEVER GIVEN THE AGE OF THE
BUILDING CANNOT GUARANTEED THAT NONE ARE PRESENT.
CONTRACTOR SHALL BE DILIGENT IN IDENTIFYING ANY
SUSPECT MATERIALS AND SHALL NOTIFY OWNER IF ANY ARE
ENCOUNTERED . CONTRACTOR SHALL COOPERATE WITH
OWNER IN COORDINATING ALL ABATEMENT, REMOVAL AND
DISPOSAL OF ANY HAZARDOUS MATERIALS .
DEMOLITION GENERAL NOTES
REMOVE EXISTING WINDOWS , ASSOCIATED HARDWARE , FRAME
AND TRIMS IN THEIR ENTIRETY.
12
REMOVE EXISTING MEMBRANE ROOFING , FLASHING ,
EQUIPMENT CURBS , INSULATION AND COPPER BASE , CAP AND
PARAPET WALL FLASHING IN THEIR ENTIRETY.
13
RETAIN EXISTING
4. CONTRACTOR SHALL BE DILIGENT IN CUTTING ,MODIFYING
OR REMOVAL OF ANY STRUCTURAL COMPONENT AND
PROVIDE ALL REQUIRED TEMPORARY SHORING/FRAMING TO
STABILIZE THE STRUCTURE AND AVOID ANY
SETTLEMENT OR DAMAGE .
5.THE ONWER WILL PROVIDE A SUREY OF EXISTING
CONDITIONS WITH REGARDS TO THE PRESENT OF
HAZARDOUS MATERIALS . IT IS INTENTION OF THIS
PROJECTED THAT ANY WORK ASSOCIATED WITH
HAZARDOUS MATERIALS (INCLUDING , BUT NOT LIMETED TO
ASBESTOS QUALIFIED CONSULTING/ABATEMENT WORK
(IDENTIFICATION , TESTING , THE OWNER'S CONSULTING
ABATEMENT FIRM).
REMOVE EXISTING STRUCTURES TO
ACCOMODATE NEW STAIRS , ELEVATOR
SHAFTS , AND FLOOR LEVEL CHANGES
14 REMOVE WINDOW SASH ASSEMBLY AT 221 ESSEX ST. WINDOWS
ONLY.
GENERAL AREA OF DEMOLITION WORK
These drawings and specifications are the property and copyright of SOUSA design Architects and shall not be used in whole or in part, or shall be assigned to a third party without the express written permission of SOUSA design Architects .Contractor to verify all information and dimensions in the field prior to start of construction and is to notify SOUSA design Architects of any discrepancies
Revisions
Job #
Drawn by Ckd by
Date
SOUSA design
A r c h i t e c t s
81 Boylston St., 2nd Floor
Brookline , MA. 02445
617 . 879 . 9100
www.sousadesign .com
217-221 Essex Street
Salem, MA 01970
ISSUED FOR:
ALL DRAWINGS , SPECIFICATIONS AND
ARCHITECTURAL DESIGNS ARE THE
PROPERTY OF SOUSA DESIGN
ARCHITECTS AND SHALL NOT BE
REPRODUCED OR USED ON THIS OR
ANY OTHER PROJECT WITHOUT
WRITTEN CONSENT FROM THE
ARCHITECT.
THE CONTRACTOR SHALL CHECK AND
VERIFY ALL DIMENSIONS AND EXISTING
CONDITIONS ON SITE PRIOR TO
BEGINNING ANY WORK, REPORT ALL
DISCREPANCIES IN WRITING TO SOUSA
DESIGN ARCHITECTS BEFORE
PROCEEDING WITH THE WORK, AND
SHALL ACCEPT FULL RESPONSIBILITY
FOR SAME. DRAWINGS SHALL NOT BE
SCALED . ALL WORK SHALL BE CARRIED
OUT IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS , AND
TO THE SATISFACTION OF THE OWNER
AND THE ARCHITECT.
EACH CONTRACTOR SHALL SUBMIT TO
SOUSA DESIGN ARCHITECTS FOR
APPROVAL; SHOP DRAWINGS , SAMPLES ,
CUTS OF ALL THE ITEMS OF WORK
PRIOR TO THEIR INCLUSION IN THE
CONSTRUCTION . ALL ITEMS TO BE
INCLUDED SHALL BE APPROVED FOR
USE IN THE CITY OF SALEM AND SHALL
HAVE AN ASTM AND UL NUMBER WHEN
SUCH ITEMS REQUIRE THIS
DESIGNATION . EACH CONTRACTOR
SHALL CO-ORDINATE HIS WORK WITH
ALL OTHER CONTRACTORS .
THE QUALITY OF WORKMANSHIP AND
MATERIALS USED SHALL COMPLY WITH
ALL CITY OF SALEM AND MA STATE
BUILDING CODES . DRAWINGS SUBJECT
TO APPROVAL BY ALL GOVERNMENTAL
AGENCIES HAVING JURISDICTION ALL
NEW CONSTRUCTION TO COMPLY WITH
APPLICABLE HANDICAPPED
ACCESSIBILITY LAWS.
10.22.2019
SDA S.A.S.
PROGRESS SET
1863
FIFTH FLOOR
DEMO PLAN
D-1.5217-221 FIFTH FLOOR DEMOLITION PLAN
Scale: 3/16" = 1'-0"1
UPSILL: 1'-4"HEAD: 7' - 10"SILL: 1'-4"HEAD: 7' - 10"SILL: 1'-4"HEAD: 7' - 10"SILL: 1'-4"HEAD: 7' - 10"SILL: 1'-4"HEAD: 7' - 10"SILL: 1'-4"HEAD: 7' - 10"SILL: 1'-4"HEAD: 7' - 10"SILL: 1'-4"HEAD: 7' - 10"SILL: 1'-4"
HEAD: 7' - 9"
SILL: 1'-4"
HEAD: 7' - 9"
SILL: 1'-4"
HEAD: 7' - 9"
SILL: 1'-4"
HEAD: 7' - 9"
47'-5 3/8"87'-3 3/4"44'-11 1/8"80'-9 1/8"REFER TO GENERAL
DEMOLITION NOTES/
LEGEND
1.1 1.2
A
B
C
D
E
F
1.3
REMOVE EXISTING
FIRE ESCAPE
REMOVE EXISTING
FIRE ESCAPE
REMOVE ALL EXISTING FLOOR MATERIALS DOWN TO EXISTING
HARD WOOD FLOOR OR IF UNSTABLE , DOWN TO SUB FLOOR .
1. GC shall coordinate scope of demolition with the
work shown on the plans .
2. GC shall confirm demolition scope with a field
visit prior to bid.
3. GC is responsible to identifying any hazardous
materials and abating in manner consistent with
current regulations .
DEMOLITION GENERAL NOTES
REMOVE EXISTING INTERIOR WALLS , COLUMN
ENCLOSURES , ACCESSORIES , DOORS , BRACKETS ,
BUILT-IN CASEWORK IN THEIR ENTIRETY. TYPICAL
ALL AREAS .
REMOVE ALL EXISTING SUSPENDED CEILINGS , GYP. BD.
CEILINGS , PLASTER CEILING AND GYP. BD. SOFFITS IN THEIR
ENTIRETY.
DEMOLITION SCOPE NOTES LEGEND
INTERIOR BASEBOARD HEATING , RADIATOR & ASSOCIATED
PIPING TO BE REMOVED IN THEIR ENTIRETY.
REMOVE ABANDON INTERIOR EXISTING AIR HANDLERS , DUCTS
AND ASSOCIATED PLUMBING AND ELECTRICAL IN THEIR
ENTIRETY.
REMOVE EXISTING DOORS , ASSOCIATED HARDWARE , FRAME
AND TRIMS IN THEIR ENTIRETY.
REMOVE EXISTING INTERIOR LATH/PLASTER FINISHES
BACK TO EXISTING STUDS OR MASONRY WALL
REMOVE EXISTING ABANDON SANITARY PIPE AND VENT IN
THEIR ENTIRETY.
01
02
03
04
05
06
09
10
11
REMOVED ABANDON EXISTING BOILER AND ASSOCIATED PIPING
IN THEIR ENTIRETY.
07
08
REMOVED ABANDON INTERIOR EXISTING PLUMBING FIXTURES
IN THEIR ENTIRETY.
REMOVE ALL ABANDON LIGHT FIXTURES , DUCTWORK , VENTS ,
AIR CONDITIONERS IN THEIR ENTIRETY.
1.THE CONTRACTOR SHALL MAINTAIN POWER TO EXISTING
EXIST SIGNS , FIRE ALARM DEVICES , EMERGENCY LIGHTS , CO
DETECTORS FIRE PROTECTIONS , STANDING PIPES AND
SECURITY ALARM DURING DEMOLITON AND CONSTRUCTION .
2. EXISTING STRUCTURAL COMPONENTS TO REMAIN , COLUMNS ,
BEARING WALLS , BEAMS , FLOOR FRAMING AND ROOF
FRAMING .
3. CONTRACTOR SHALL CAREFULLY COORDINATE DEMO WITH
PROPOSED NEW FRAMING AND PROVIDE TEMPORARY
STRUCTURAL SHORING AND / OR OTHER MEANS OF
STABLIZING THE EXISTING STRUCTURE .
GENERAL NOTES
DEMOLITION LEGEND
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
1.THE CONTRACTOR SHALL VISUALLY INSPECT THE SITE TO
DETERMINE THE CONDITIONS OF EXISTING CONSTRUCTION
AND FAMILIARIZETHEMSELVES WITH THE PROPOSED WORK .
THE CONTRACTOR SHALLREVIEW ALL EXISTING ORIGINAL
BUILDING DRAWINGS AS PROVIDE BY BY THE GC.
2.DISCONNECTION OF UTILITIES AND UTILITY LINES TO BE
ABANDONED SHALL BE DISCONNECTED , REMOVED AS
REQUIRED AND/OR CAPPED OFF ACCORDANCE WITH THE
LATEST APPLICABLE CODES AND REGULATION .
3.TO THE BEST OF OWNER'S KNOWLEDGE THERE ARE NO
HAZARDOUS MATERIALS , HOWEVER GIVEN THE AGE OF THE
BUILDING CANNOT GUARANTEED THAT NONE ARE PRESENT.
CONTRACTOR SHALL BE DILIGENT IN IDENTIFYING ANY
SUSPECT MATERIALS AND SHALL NOTIFY OWNER IF ANY ARE
ENCOUNTERED . CONTRACTOR SHALL COOPERATE WITH
OWNER IN COORDINATING ALL ABATEMENT, REMOVAL AND
DISPOSAL OF ANY HAZARDOUS MATERIALS .
DEMOLITION GENERAL NOTES
REMOVE EXISTING WINDOWS , ASSOCIATED HARDWARE , FRAME
AND TRIMS IN THEIR ENTIRETY.
12
REMOVE EXISTING MEMBRANE ROOFING , FLASHING ,
EQUIPMENT CURBS , INSULATION AND COPPER BASE , CAP AND
PARAPET WALL FLASHING IN THEIR ENTIRETY.
13
RETAIN EXISTING
4. CONTRACTOR SHALL BE DILIGENT IN CUTTING ,MODIFYING
OR REMOVAL OF ANY STRUCTURAL COMPONENT AND
PROVIDE ALL REQUIRED TEMPORARY SHORING/FRAMING TO
STABILIZE THE STRUCTURE AND AVOID ANY
SETTLEMENT OR DAMAGE .
5.THE ONWER WILL PROVIDE A SUREY OF EXISTING
CONDITIONS WITH REGARDS TO THE PRESENT OF
HAZARDOUS MATERIALS . IT IS INTENTION OF THIS
PROJECTED THAT ANY WORK ASSOCIATED WITH
HAZARDOUS MATERIALS (INCLUDING , BUT NOT LIMETED TO
ASBESTOS QUALIFIED CONSULTING/ABATEMENT WORK
(IDENTIFICATION , TESTING , THE OWNER'S CONSULTING
ABATEMENT FIRM).
REMOVE EXISTING STRUCTURES TO
ACCOMODATE NEW STAIRS , ELEVATOR
SHAFTS , AND FLOOR LEVEL CHANGES
14 REMOVE WINDOW SASH ASSEMBLY AT 221 ESSEX ST. WINDOWS
ONLY.
GENERAL AREA OF DEMOLITION WORK