Architect Sketch w legendadd
door
add
door add
door
add
door
reverse
door swing
remove
door & ll
add
door
remove
doors & ll
reverse
door swing
SEQUENCE OF OPERATIONS:
Maze of 3 spaces ( Rabbit Hole
and Submerged) with doors
locked in direction of maze In
opposite direction of maze doors
shall be unlocked at all times to
allow for egress. Refer to code
report for additional require-
ments and or limitations.
NOTE:
- Drawings based on existing conditions documentation
provided by others.
- Device location by Moran Electrical Services, Salem MA.
- Do not scale drawings- Contractor shall conrm all exist -
ing conditions prior to execution of work and notify Owner
of any discrepancies.
- All existing to remain unless noted otherwise.
- Layout in eld and conrm location of new doors with
Owner prior start of work.
- Relocate existing and/or provide new doors that meet all
accessibility requirements.
- Provide in-ll partitions at removed doors. patch and
match nishes for clean and uniform appearance.
- Reverse door swings or modify as required for doors that
do not meet accessibility requirements (pull and push side
clearances).
- Refer to Owners Statement of Work and or directives for
additional project scope and requirements.
existing partitions, typ.
existing door, typ.
existing
plumb, typ.
existing case, typ.
existing
equipment, typ.
common building
HYSTERIA
SUBMERGEDROOM #1
RABBIT HOLE
ROOM #2 ROOM #3
207 Washington St. Salem MA, Twisted Escape Room LLC
10/16/18 scale 1/8” = 1’-0”
DEVICE KEY:
SMOKE DETECTOR
HEAT DETECTOR
(135 DEG. F )
STROBE ONLY
PULL STATION
HORN AND STROBE
MINI HORN
EMERGENCY LIGHT
COMBO EMERGENCY
LIGHT & EXIT SIGN
EXIT SIGN
EXIT
S
H
M
SS
S
S
S
S
S
S
S
S
S
S
H
HH
H
F
F
FEXIT
EXIT
EXIT
EXIT
EXITEXITEXITEXITEXITEXITEXITEXITMS
S S
EXIT