Loading...
LTR TO PLANNING W REQUEST TO AMEND 11.30.17��AO ` r;: t 7 �"` ss C ' T. 11 kw Lcvn D NOV 30 2017 SERAFINI, DEPT. OF PLANNING & COMMUNITY DEVELOPMENT JOHN R. SERAFINI. SR. JOHN E. DARLING JOSEPH C. CORRENTI KRISTIN E. KOLICK DARLING & CORRENTI, LLP ATTORNEYS AT LAW 2017 NOV 30 ANII:-43 63 FEDERAL STREET SALEM, MASSACHUSETTS 01970 Ben Anderson, Chairman City of Salem Planning Board 120 Washington Street Salem, Massachusetts 01970 SAILEM. MASS November 30, 2017 Re: Proposed Amendments to Planning Board Decisions LAR Properties, LLC 1, 3 & 5 Harmony Grove Road and 60 & 64 Grove Street Dear Chair Anderson: TELEPHONE 978-744-0212 FACSIMILE 978-741-4683 On behalf of LAR Properties, LLC, owner under agreement of the property, enclosed for filing please find the following: 1. Nine (9) copies of letter prepared by Griffin Engineering Group, LLC dated November 30, 2017, outlining the amendments requested; 2. Nine (9) copies of letter prepared by Griffin Engineering Group, LLC dated April 13, 2016 regarding the Existing Building Inspction; 3. Four (4) full size and nine (9) 11 x 17 sets of Architectural Plans prepared by Khalsa Design, Inc. dated November 29, 2017 (Sheets A- 000, A-100, A-101, A-300 and A-301); and 4. Four (4) full size and nine (9) 11 x 17 sets of Site Plans prepared by Griffin Engineering Group, LLC dated December 20, 2011, revised through November 29, 2017 (Sheets C-3, C-3A, C-4A, C-5A and C- 11). November 30, 2017 Page Two Kindly place this matter on the Board's December 21, 2017 agenda. Respectfully submitted, LAR Properties, LLC ByAts Attorney / eph C. •rrenti JCC:dl Enclosures cc: client Griffin Groug d c° NOV 3 0 2017 November 30, 2017 DEPT. OF PLANNFNG & COMMUNITY DEVELOPMENT City of Salem Planning Board Attn: Mr. Tom Daniel, Director Dept. of Planning & Community Development 120 Washington Street, 3rd Floor Salem, MA 01970 Subject: 2017 NOV 30 AM IS: 43 CITY CLERK SALEM. MASS Proposed Amendments to Planning Board Decisions Grove Street Apartments 60 & 64 Grove Street and 1, 3, & 5 Harmony Grove Road Dear Board Members: On behalf of the Applicant, LAR Properties, LLC (LAR), this letter requests that the Planning Board amend its Site Plan Review, Planned Unit Development Special Permit and Flood Hazard District Special Permits for the subject project (reference: Planning Board decisions dated December 11, 2014). LAR is in the process of transferring ownership of the site from MRM Project Management, LLC. LAR is a well-known developer that owns and is redeveloping other multi -family properties close to the former Salem Oil & Grease Company site. LAR proposes to modify the City's 2014 approvals as they relate to the planned restoration of the two and three-story office buildings at 60 Grove Street. Instead of restoring the office buildings, LAR proposes demolition and construction of a smaller, two-story community building with associated walkways, patio, parking lot, landscaping and utilities. The need to demolish the existing buildings at 60 Grove Street became apparent in 2015 and 2016 when environmental remediation work was undertaken by MRM Project Management. The buildings are beyond repair and cannot be renovated as was first proposed approximately 6 years ago. There are so many structural, architectural and other deficiencies in the 100+ year -old buildings that renovation and reuse is impossible. Our attached inspection letter dated April 13, 2016, summarizes building deficiencies. Salvaging the office building was also made difficult by the Chapter 91 Waterways License for the parcel. The entire parcel is within filled tidelands, created in the late 1800's when the North River Canal was constructed, and therefore is subject to DEP Waterways jurisdiction. The Waterways license restricts first -floor building uses to defined "Facilities of Public Accommodation", which constrain many typical commercial building uses. Re-establishing Phone 978-927-5111 I Fax 978-927-5103 www.griffineng.com 495 Cabot Street 12nd Floor I Beverly, MA 01915 Salem Planning Board November 30, 2017 Re: 60 Grove Street Page 2 commercial uses of the first floor of the building in a manner consistent with the Chapter 91 license was pursued by MRM Project Management, but no parties were interested in the deficient buildings. The site and architectural plans associated with this request are listed below. The architectural plans were prepared by Khalsa Design of Somerville. Sheet Description C-3 C-3A C-4A C-5A C-11 A-000 A-100 A-101 A-300 A-301 Overall Site Plan Site Layout Plan Grading, Drainage and Erosion Control Utilities Plan 60 Grove Street Landscape Architectural Cover Sheet First & Second Floor Plan Roof Plan Front & Side Elevations Rear & Side Elevations Last Revised 11/29/17 11/29/17 11/29/17 11/29/17 Plan 11/29/17 11/29/17 11/29/17 11/29/17 11/29/17 11/29/17 Prepared By GEG, LLC GEG, LLC GEG, LLC GEG, LLC GEG, LLC Khalsa Design Khalsa Design Khalsa Design Khalsa Design Khalsa Design The proposed two-story building footprint is approximately 1,620 sq. ft. and will be of conventional wood -frame construction on a cast -in -place concrete foundation. The first floor is intended for community meetings and gatherings, uses that are compliant with the aforementioned Chapter 91 restrictions. The "Great Room" is approximately 600 sf in size and includes a small kitchenette so that food can be brought in. An approximately 580 sf patio will be suitable for outdoor gatherings. The second floor is approximately 850 sq. ft. and will be used as office space by LAR Properties. The building will have views of the North River Canal, and will be complemented by landscaping throughout the parcel. The reconstructed parking lot provides fifteen (15) vehicle spaces. A handicapped accessible space is provided adjacent to the building; two accessible building entrances are provided. The proposed site improvements will reduce the building footprint area on the parcel from approximately 8,600 square feet to 2,200 square feet (including the patio). Impervious areas on the parcel will be reduced by approximately 14,500 sq. ft. The site redevelopment work will significantly reduce the amount of stormwater runoff directed to the Grove Street drainage system and increase the Salem Planning Board November 30, 2017 Re: 60 Grove Street amount of flood storage capacity available on the parcel. Page 3 In September 2016 we wrote the Planning Board describing how the large and deteriorating buildings at the site, and their stringent reuse restrictions, had become counterproductive to Salem Oil & Grease Site redevelopment. Unused for over ten years, the existing buildings have become potential safety hazards and a neighborhood blight. Demolishing the buildings and constructing a modest, energy -efficient, accessible building with greater buffer distance to the canal, as LAR proposes, will create an attractive, publically-accessible meeting space and landscaped area along the canal, and will facilitate the Salem Oil & Grease Site redevelopment project. Thank you for your consideration of this request. We look forward to meeting with the Board in the near future to present our plans in more detail and respond to your comments. Should you have any questions or require additional information, please do not hesitate to contact the undersigned or Attorney Joseph Correnti (978-744-0212). Very truly yours, Grid Engineeripg Group, Robert H. Griffin, P.E Attachments: Plans as listed above Structural Assessment Letter dated April 13, 2016 Cc: PDF of all items sent to City by email. Attorney Joseph Correnti (w/ enclosures) LAR Properties, LLC Khalsa Design MRM Project Management, LLC (w/ enclosures) Griffin Engineering Group, LLC April 13, 2016 Mr. Michael Hubbard MRM Project Management PO Box 388 Beverly, MA 01915/ Subject: 60 Grove Street — Existing Building Inspection Dear Mr. Hubbard: As requested, the undersigned made a visual inspection of the subject building on April 13, 2016. The building is a two and three-story wood framed structure previously used for industrial and office uses. The building has been vacant for approximately ten years. The building contents have been almost completely removed; a few industrial components were apparent within the building. The building is not habitable and has been substantially damaged by weather, time, vandalism and decay. All building systems, such as electrical, heating, ventilating, and plumbing have been substantially damaged and are inoperative; their remaining portions are antiquated and inadequate. There are numerous roof leaks and damaged windows. Mold and moss were growing on the walls and floors in many locations. The wooden posts along the main interior bearing lines in the first floor are clearly not plumb. The second floor of the building has shifted away from the canal. The building design lacks adequate lateral restraint, even if it were new. Portions of the first floor have collapsed into the crawlspace below. Wood joists and beams have pulled away from main girder beams supporting the second floor so that wood tenons are partially exposed. Numerous second floor and roof joists are broken, rotten and sagging. Floor and roof sheathing has rotted through in many locations so that considerable care must be exercised simply walking through the building. Access to the crawl space was not available during our inspection, however through gaps in the first floor sheathing and from the building exterior we observed damaged brick and concrete supports and damaged stone masonry supports. Based on our inspection it is clear that the building is presently unsafe for any occupancy. Substantial reconstruction of the building would be required to make the building suitable for any use in a manner compliant with current building codes. The existing building layout and its means of access and egress would require substantial modification. The extent of required modifications and reconstruction are so comprehensive as to be impractical. Accordingly, we recommend that the building be demolished at the earliest opportunity. The building has already been red -tagged to warn emergency responders of the hazardous condition of the building. Suitable postings prohibiting Phone 978-927-5111 I Fax 978-927-5103 I www.griffineng.com 495 Cabot Street 12nd Floor I Bev ± ; MA 01915 Mr. Michael Hubbard MRM Project Management April 13, 2016 Page 2 entry to the building and continued efforts to secure the building from vagrants is recommended until the building is removed. Thank you for the opportunity to be of assistance. Should you have any questions or comments, or require additional information, please do not hesitate to contact the undersigned. Very truly yours, Griffin Engineers g Group, Robert H. Griffin, P.E. Cc: T. St. Pierre, Salem Director of Inspectional Services