Loading...
15 Cabot St FP 12.02.19Notes: RESIDENTIAL AUTOMATIC PUMP / (GT-15, 1% HP) AND TANK ARRANGEMENT (NFPA 13D, INCLUDES PRESSURE SWITCH, FLOW SWITCH AND PRESSURE GAUGE) * PUMP SHALL BE WIRED TO A NORMAL 240 V CIRCUIT AND SHALL NOT SIT DIRECTLY ON THE FLOOR PER NFPA 13D 12 13'-7 3/4" 0 • • BASEMENT PLAN PROVIDE 21/2" SINGLE -INLET FIRE DEPARTMENT CONNECTION (TYPE AND FINAL LOCATION TO BE VERIFIED WITH BOSTON FIRE DEPARTMENT PRIOR TO INSTALLATION). PROVIDE 2-1/2" CHECK VALVE WITH BALL DRIP LOCATED IN COMMON AREA. INFILL WALL INFILL WALL INFILL WALL FIRST FLOOR PLAN REV: JASON CATALFO KAHAN FIRE PROTECTION NO. 483 12/02/2019 DESCRIPTION: BY: DATE: STATUS: CONSTRUCTION ISSUE PLS Rp INC CLIENT: ENGINEER: PLS INC 23 SAGAMORE LN BOXFORD, MA 01921 SITE: 15 CABOT ST SALEM, MA 01970 TITLE: FIRE PROTECTION DETAILS BASE -1ST SCALE AT Al: 1/4"= 1'-0" DATE: 12/02/19 DRAWN: JK CHECKED: JK PROJECT NO: FP 1 DRAWING NO: 2019-CABOT REVISION: 1