15 Cabot St FP 12.02.19Notes:
RESIDENTIAL AUTOMATIC PUMP
/ (GT-15, 1% HP) AND TANK
ARRANGEMENT (NFPA 13D,
INCLUDES PRESSURE SWITCH, FLOW
SWITCH AND PRESSURE GAUGE)
* PUMP SHALL BE WIRED TO A
NORMAL 240 V CIRCUIT AND SHALL
NOT SIT DIRECTLY ON THE FLOOR
PER NFPA 13D
12
13'-7 3/4"
0
•
•
BASEMENT PLAN
PROVIDE 21/2" SINGLE -INLET FIRE DEPARTMENT
CONNECTION (TYPE AND FINAL LOCATION TO BE
VERIFIED WITH BOSTON FIRE DEPARTMENT PRIOR
TO INSTALLATION). PROVIDE 2-1/2" CHECK VALVE
WITH BALL DRIP LOCATED IN COMMON AREA.
INFILL WALL
INFILL WALL
INFILL WALL
FIRST FLOOR PLAN
REV:
JASON CATALFO
KAHAN
FIRE PROTECTION
NO. 483
12/02/2019
DESCRIPTION:
BY:
DATE:
STATUS: CONSTRUCTION ISSUE
PLS Rp INC
CLIENT:
ENGINEER:
PLS INC
23 SAGAMORE LN
BOXFORD, MA
01921
SITE: 15 CABOT ST
SALEM, MA 01970
TITLE:
FIRE PROTECTION DETAILS
BASE -1ST
SCALE AT Al:
1/4"= 1'-0"
DATE:
12/02/19
DRAWN:
JK
CHECKED:
JK
PROJECT NO:
FP 1
DRAWING NO:
2019-CABOT
REVISION:
1