Loading...
B-18-1220 c°N>;T,a Commonwealth of Massacnuo„.._ F:Y `\eb City of Salem ,0� 1 �c 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Divis:on for Certificate of Occupancy Permit No. B-18-1220 PERMIT TO BUiLD FEE PAID: $1,650.00 DATE ISSUED: 11/13/2018 This certifies that CHEN YU YUN has permission to erect, alter, or demolish a building 155 BOSTON STREET Map/Lot: 160067-0 as follows: Other Building Permit UPDATED 01/28/2020 COMPLETE INSULATION, DRYWALL, AND FINISH WORK AFTER CONTRACTOR WAS REPLACED. Contractor Name: ALFREDO DEPINA DBA: DEFINA BUILT CONSTRUCTION LLC Contractor License No: CS-111007 Pi 11113/2018 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. --�•Wards are the property of the PROPERTY OWNER. 0 MT v/ Commonwealth of Massachusetts LI ` City of Ili SalemW. �sfc - ,ary 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy 17Structure CITY OF SALEM BUILDING PERMIT y°°"''� y Excavation PERMIT TO BE POSTED IN THE WINDOW . ` - Ai Footing INSPECTION RECORD ' Foundation Framing 3 )1` 5. Mechanical Insulation 3 - V.d-b j� l (.41, INSPECTION: BY DATE Chimney/Smoke Chamber lJG Final i'I /".cu F/10994 f�Ua/ ( - /,%�%Gi r X A -e 4{7/�iGy7) . 5 es Plumbing/Gas `� -P 41-7---Ki-e5 eveit ., -(1 jr'h -c -tiery— 5e- Rough:Plumbin i/ Rough:Ga - -CdrG� t40. -1 f, J , i/ ,,5 i � i l-ete "7-6 J• zd Final Q/j0 Z9g . 4/ai ij El rical Service Rough f / /,, -� 7 Final „iiii,L____ ire Department Preliminary Final IQ Health Department Preliminary Final