A-4,'(('4510#8'07'61+.'661+.'6%75661+.'661+.'6%75661+.'661+.'6%75661+.'661+.'6%75661+.'661+.'6%75661+.'661+.'6%75661+.'661+.'6%75661+.'661+.'6%75612ABCDE(65.12'(65.12'(65.12'(65.12'(65.12'(65.12'(65.12'(65.12'A-4REVISIONS
Description
Drawn by
Designed by
Scale
Date
Job No.
Approved by
Checked by No.
Location
Project
DrawingSheet AS NOTED
April 18, 2018
2018_005
DR
DR,SL
JAS
JAS
SEGER ARCHITECTS, INC.
Date
1 Jefferson Ave, Salem, MA
1 Jefferson4-18-2018 - PROPOSAL(+456(.1142.#0