Loading...
CONST. CONT DOC 07/07/2020 Initial Construction Control Document To be submitted with the building permit application by a ih Registered Design Professional for work per the 9t"edition of the Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Harbor Point Lofts& Apartments Date: July 7,2020 Property Address: 129 Lafayette Street and 20 Harbor Street, Salem, MA Project: Check(x)one or both as applicable: - New construction X Existing Construction Project description: Restoration and re-use of an existing rectory building for 13 residential units and 24 units in the existing school building. I John A. Seger , MA Registration Number: 30105 Expiration date: August 31,2020 , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning': X Architectural Structural Mechanical Fire Protection Electrical _ Other: for the above named project and that to the best of my knowledge, information,and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept, shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official,I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a`Final Construction Control Document'. (' tNo.301 MA tiny OF V.t Enter in the space to the right a"wet"or J electronic signature and seal: Phone number: 978-744-0208 Email: lohnaseger@segerarchitects.com Building Official Use Only Building Official Name: Permit No.: Date: Note I.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen. provide a description. Version 06 11 2013