C/O & S/O B-19-1006 NEW HOME Certificate Number: B-19-1006 Permit Number: B-19-1006
Commonwealth of Massachusetts
City of Salem
This is to Certify that the Pot Land Building located at
Building Type
50 OSBORNE HILL DRIVE in the City of Salem
Address Town/City Name
IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY
Single Family Home
This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and
expires Not Applicable unless sooner suspended or revoked.
Expiration Date
C/4/44Rit145t,
Issued On: Thursday, May 21, 2020
;%V°`T'.,� Commonwealth of Massachusetts,
{, t City of Salem y
k %P 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
0 9
Return card to Building Division for Certificate of Occupancy
Permit No. B-19-1006p
RIVII�' TO BuILDFEE PAID: $0.00
DATE ISSUED: 9/12/2019
This certifies that OSBORNE HILLS REALTY TRUST PAUL DIBIASE TR
has permission to erect, alter, or demolish a building 50 OSBORNE HILL DRIVE Map/Lot: 40046-0
as follows: Other Building Permit CONSTRUCT A NEW, SINGLE FAMILY DWELLING
Contractor Name: PAUL DIBIASE
DBA: DIBIASE CORPORATION
Contractor License No: CS-027147
r/Irft,1-flittd4"-* 9/12/2019
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-k ws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issi ed until all applicable signatures by the Building and Fire Officials are provided on his permit.
H IC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
{ t`°vntr,� ; Commonwealth of Massachusetts:
, City of Salem ', .
i
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x56
Return card to Building Division for Certificate of Occupa,:y
Structure 4°°"°'r,,.
r CITY OF SALEM BUILDING PERMIT
PERMIT TO BE POSTED IN TI-- E WINDOW , d
Excavation r}— 7 , n,-,
Footing _ 7 _ ,rU
INSPECTION RECOR)
Foundation a„...7.-.2 0 _
Framing
Mechanical
Insulation 3 ,S-p_c . INSPECTIO BY DATE
Chimney/Smoke Chamber
Final S 2/.2 ®� _
40,211) Plumbing/Gas
ass
Rough:Plumbin ✓t'
Rough:Gas3/� 42.0
Final //n /yl 4 /4
LI ` `7/(/(JEie cal C/
Service -- /J 7 _/ 1
�^7 � I
Rough
. 2/.2ej Final /7 o2,9
OaFire Department
Preliminary I
Final 13fr?0
Health Department
Preliminary
Final
1