Loading...
C/O & S/O B-19-1006 NEW HOME Certificate Number: B-19-1006 Permit Number: B-19-1006 Commonwealth of Massachusetts City of Salem This is to Certify that the Pot Land Building located at Building Type 50 OSBORNE HILL DRIVE in the City of Salem Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY Single Family Home This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and expires Not Applicable unless sooner suspended or revoked. Expiration Date C/4/44Rit145t, Issued On: Thursday, May 21, 2020 ;%V°`T'.,� Commonwealth of Massachusetts, {, t City of Salem y k %P 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 0 9 Return card to Building Division for Certificate of Occupancy Permit No. B-19-1006p RIVII�' TO BuILDFEE PAID: $0.00 DATE ISSUED: 9/12/2019 This certifies that OSBORNE HILLS REALTY TRUST PAUL DIBIASE TR has permission to erect, alter, or demolish a building 50 OSBORNE HILL DRIVE Map/Lot: 40046-0 as follows: Other Building Permit CONSTRUCT A NEW, SINGLE FAMILY DWELLING Contractor Name: PAUL DIBIASE DBA: DIBIASE CORPORATION Contractor License No: CS-027147 r/Irft,1-flittd4"-* 9/12/2019 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-k ws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issi ed until all applicable signatures by the Building and Fire Officials are provided on his permit. H IC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. { t`°vntr,� ; Commonwealth of Massachusetts: , City of Salem ', . i 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x56 Return card to Building Division for Certificate of Occupa,:y Structure 4°°"°'r,,. r CITY OF SALEM BUILDING PERMIT PERMIT TO BE POSTED IN TI-- E WINDOW , d Excavation r}— 7 , n,-, Footing _ 7 _ ,rU INSPECTION RECOR) Foundation a„...7.-.2 0 _ Framing Mechanical Insulation 3 ,S-p_c . INSPECTIO BY DATE Chimney/Smoke Chamber Final S 2/.2 ®� _ 40,211) Plumbing/Gas ass Rough:Plumbin ✓t' Rough:Gas3/� 42.0 Final //n /yl 4 /4 LI ` `7/(/(JEie cal C/ Service -- /J 7 _/ 1 �^7 � I Rough . 2/.2ej Final /7 o2,9 OaFire Department Preliminary I Final 13fr?0 Health Department Preliminary Final 1