Loading...
B-20-193 S/O PERMIT Commonwealth of Massachusetts e City of Salem Cw, 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy Permit No. B-20-193 PERMIT TOFEE PAID: $70.00 BUILD DATE ISSUED: 2/21/2020 This certifies that SWEAZY AUSTIN T SWEAZY MARISSA R has permission to erect, alter, or demolish a building 24 CHANDLER ROAD Map/Lot: 300006-0 as follows: Repair/Replace REMOVE AND REPLACE EXISTING BASEMENT FLOOR AND WALLS DUE TO WATER DAMAGE Contractor Name: DBA: . Contractor License No: / 7 2/21/2020 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. H IC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. °r„, Commonwealth of Massachusetts 4 u, City of Salemlirq 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595)5641 AC Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT 6,,,,,,,,, - r Excavation PERMIT TO BE POSTED IN THE WINDOW "*.• Footing INSPECTION RECORD Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final •; Plumbing/Gas Rough:Plumbing /7 /� c r . Rough:Gas Final u Electrical Service Rough Final IIIFire Department Preliminary Final itil Health Department Preliminary Final I