DARK STAR YOGA WINDOW SIGNS JAL Salem
RERedevelopment
Authority
Design Review Board Sign Recommendation
20 Central Street, Suite 108
Dark Star Yoga & Wellness: Window Signs
Meeting Date: December 18, 2019
Members Present: Paul Durand, Chair, David Jaquith, Catherine Miller, J. Michael Sullivan
Members Absent: Glenn Kennedy, Marc Perras, Helen Sides
Decision: At a regular meeting of the Design Review Board (DRB), upon a motion duly made
and seconded, it was unanimously voted to recommend approval of the sign proposal as
designed and conditioned herein.
Referenced Plans and Documents
1. Dark Star Yoga &Wellness Sign Proposal, prepared by Vinyl GraphicWorks, 30 Doaks
Lane, Marblehead, MA 01945, received 12/3/19.
2. Staff Comments dated 12/11/19.
Condition of Approval
1 Consistency with Design/Plans: Should the applicant determine that the approved sign
design may not be completed as detailed in the plans referenced herein, he/she/they
shall return to the DRB to review proposed modifications prior to making any changes in
the field.
Findings
1. The DRB reviewed the sign proposal and found that the proposed signage is consistent
with the standards and guidelines in the SRA Sign Manual and the City of Salem Sign
Ordinance regarding size, scale, and color choice that provides contrast to allow for
readability.
2. The size of the signs is modest with the text scaled for pedestrians; the signs do not
detract from or obscure the existing architectural features of the building.
Signature of the DRB
By the signature below, I certify that this recommendation accurately reflects the actions of the
Design Review Board.
Paul Durand Date
Chair
Penni#Humber
APPLI NY1 OIL FOR PERMIT TO ERECT A SIGN
I I
NOTE: BUILMW, PERMIT MUST BE DUTAINED BEFORG SIGN 15 ERECTED
Lucatinn rMelI ship and Detarl frAusl Beorroct, orrtPffvh , $rid LG9ible
-_= Salem,MWI 8;3G,Usalt7.
143#rre Folding Inspeerc,r:
Dike
The umersignod heretxy apples for a permit kO &vEred. n Athw _Repairs sign on tho Following dP°.cri buiW:Vs:
F+Jrban Renewal A a Entrance C,a idor
r-21— His[oric Diskf� None
_72;;;T2
-- ' �" � 1 flnor c �Y1 or%E3#U£ - r2�5 Y f - F i r-1�'+x i t ` J fk�br 5I
r phone 4 ffoar ? .•-
1 rx het rE LLI J4 �,,, . r,rn How M*rFf businesses ire 'on the Biding?
ffa corpamte tpp'y. nuym
orm soh_ r�leGy ,I t
F r7 k} 'g V O1 r rN BuiIdF,F g I linear feet
ti ,LiM
e No Appl�r�fS Space [if rnulli•C�naniL} r ,ek ,
5
Trt�phorrr} � p�f' •.�� r feet
art Owner wSign F f,trW o OUIEC_
•i DA _ Sign 2
❑ Right AngM to [3Uking L I Rig;hl,Angle 4o BUIiding o Right Angle to Budding
ri Frees StarKkN L,Free Siaroin9 uFfee Standing
n Awrto-tg Q Arrnog ❑Awmng
PcrM a(A-Frame) L3 POfl*IC V -Frame) o Portable A-Frwne?
Omer fspecff]) n Other(s ir) I a 0Ihef(sprxik)
Sign Uat--haI r Sign M;)tei iii s r igr�hl�kcriaf ]
I V1L G
Srpn Dirne !� Sign Lhmeftsions Sign DiiirrrrriEkns
Sign Aria +r S.gn Afeo _ Si n Area }}rr��
f _ +YL','�"i$Li fl .s - 'yfO r- 1Q 1 5 $ r F r l sq ft
Sign Height cif if ft standing) Sign Fi hk(rf free starrdinq) 1-16ghht(r#free st;3n0kV)
Estimaled Gasi of H04 Vkrk — - —
T�'� S�,area To E3e Removed'? Sign Ow
Surf _AQ ft } s . no t � •.
a{tight Angle to 1301aing -;q L4 D r no — f
*r•ree Spa x
r�irrg _ sq ft a y�S o rIo Sign�wf�e�s AUIh
D�ergs � O' o- 13M --
p�i�r� ❑tij�; ono
perly OwnFL-q -
Planning 8 Gmmunr7y Develoownt Depwrnerik Hrsbohual Carnmiswn
Building I n%*dx