UTS Job 23299 Report 10 Compressive Strength Report - Concrete 01-09-2020-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-09-2020Compressive Strength Report - Concrete Report No.10 Distribution Copy Job Number 23299 Project North Building,136 Canal St.,Salem, MA Contractor Symes Associates Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:4000# 3/4"No. Of Sets:2 50CUBIC YARDS: SET 1 LOCATION:SOG; SW limits of concrete placement Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type E360 4.00 x 8.00 12.57 Good 01/09/20 01/16/20 7 34,000 2,700 3 E361 4.00 x 8.00 12.57 Good 01/09/20 01/23/20 14 52,500 4,180 2 E362 4 x 8 12.57 Good 01/09/20 02/06/20 28 E363 4 x 8 12.57 Good 01/09/20 02/06/20 28 E364 4 x 8 12.57 Good 01/09/20 02/06/20 28 Slump (in.)7 1/2 Air Temp. (F.)43 Conc Temp (F)61 Truck No.236 Ticket No.9494 Time 8:00 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:SOG; NW limits of concrete placement Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type E365 4.00 x 8.00 12.57 Good 01/09/20 01/16/20 7 42,000 3,340 3 E366 4.00 x 8.00 12.57 Good 01/09/20 01/23/20 14 60,000 4,770 3 E367 4 x 8 12.57 Good 01/09/20 02/06/20 28 E368 4 x 8 12.57 Good 01/09/20 02/06/20 28 E369 4 x 8 12.57 Good 01/09/20 02/06/20 28 Slump (in.)5 1/4 Air Temp. (F.)44 Conc Temp (F)67 Truck No.249 Ticket No.9493 Time 8:45 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:SOG; SE limits of concrete placement Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type E355 4.00 x 8.00 12.57 Good 01/09/20 01/16/20 7 32,500 2,590 3 E356 4.00 x 8.00 12.57 Good 01/09/20 01/23/20 14 49,000 3,900 5 E357 4 x 8 12.57 Good 01/09/20 02/06/20 28 E358 4 x 8 12.57 Good 01/09/20 02/06/20 28 E359 4 x 8 12.57 Good 01/09/20 02/06/20 28 Slump (in.)6 1/2 Air Temp. (F.)45 Conc Temp (F)70 Truck No.187 Ticket No.9500 Time 11:00 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 01/10/20. Inspector Premium Travel Name Time Hours Time M. Chace No Min Day 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-09-2020Compressive Strength Report - Concrete Report No.10 Distribution Copy Job Number 23299 Project North Building,136 Canal St.,Salem, MA Contractor Symes Associates Concrete Co.J.G. Maclellan REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Symes Associates, Inc. Mark Livesey Symes Associates, Inc. Accounts Payable Seger Architects Dan Ricciarelli McBrie, LLC Michael Perham, P.E. McBrie, LLC Bob Whitton City of Salem Steve Cummings Meninno Construction Tom Pascuccio Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-09-2020Compressive Strength Report - Concrete Report No.10 Distribution Copy Job Number 23299 Project North Building,136 Canal St.,Salem, MA Contractor Symes Associates Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:SOG; Southern 1/3 of Building Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other:Manual Hand Tools Cylinder Fabrication Location:Truck Discharge Chute End of Pump Hose Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field X Other In heated building Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4-6 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 01-09-2020 Report No.10 Job Number 23299 Project North Building,136 Canal St.,Salem, MA Attachment