Loading...
UTS Job 22528 Report 31 Compressive Strength Report - Concrete 02-11-2020-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 02-11-2020Compressive Strength Report - Concrete Report No.31 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/8"No. Of Sets: 6 275CUBIC YARDS: SET 1 LOCATION:Slab on deck, slab 23, Southwest corner Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Q799 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 34,000 2,700 2 Q800 4 x 8 12.57 Good 02/11/20 02/25/20 14 Q801 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q802 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q803 4 x 8 12.57 Good 02/11/20 03/10/20 28 Slump (in.)8 Air Temp. (F.)37 Conc Temp (F)78 Truck No.242 Ticket No.168039 Time 5:05 Unit Wt lbs/cu ft Air Content (%) SET 2 LOCATION:Slab on deck, slab 23, West wall Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Q794 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 45,000 3,580 6 Q795 4 x 8 12.57 Good 02/11/20 02/25/20 14 Q796 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q797 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q798 4 x 8 12.57 Good 02/11/20 03/10/20 28 Slump (in.)7 1/4 Air Temp. (F.)37 Conc Temp (F)79 Truck No.231 Ticket No.168043 Time 5:45 Unit Wt lbs/cu ft Air Content (%) SET 3 LOCATION:Slab on deck, slab 23, Northwest Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Q874 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 37,500 2,980 6 Q875 4 x 8 12.57 Good 02/11/20 02/25/20 14 Q876 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q877 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q878 4 x 8 12.57 Good 02/11/20 03/10/20 28 Slump (in.)7 Air Temp. (F.)37 Conc Temp (F)78 Truck No.242 Ticket No.168048 Time 6:45 Unit Wt lbs/cu ft Air Content (%) SET 4 LOCATION:Slab on deck, slab 23, Southeast Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 02-11-2020Compressive Strength Report - Concrete Report No.31 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Q804 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 37,500 2,980 3 Q805 4 x 8 12.57 Good 02/11/20 02/25/20 14 Q806 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q807 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q808 4 x 8 12.57 Good 02/11/20 03/10/20 28 Slump (in.)7 1/2 Air Temp. (F.)37 Conc Temp (F)77 Truck No.231 Ticket No.168053 Time 7:25 Unit Wt lbs/cu ft Air Content (%) SET 5 LOCATION:Slab on deck, slab 23, Northeast Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Q824 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 35,000 2,780 6 Q825 4 x 8 12.57 Good 02/11/20 02/25/20 14 Q826 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q827 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q828 4 x 8 12.57 Good 02/11/20 03/10/20 28 Slump (in.)7 1/2 Air Temp. (F.)39 Conc Temp (F)79 Truck No.200 Ticket No.168060 Time 8:40 Unit Wt lbs/cu ft Air Content (%) SET 6 LOCATION:Slab on deck, slab 23, East Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Q809 4.00 x 8.00 12.57 Good 02/11/20 02/18/20 7 35,000 2,780 6 Q810 4 x 8 12.57 Good 02/11/20 02/25/20 14 Q811 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q812 4 x 8 12.57 Good 02/11/20 03/10/20 28 Q813 4 x 8 12.57 Good 02/11/20 03/10/20 28 Slump (in.)7 1/2 Air Temp. (F.)39 Conc Temp (F)78 Truck No.232 Ticket No.168068 Time 9:35 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:Cylinders received on 02/12/2020; early morning rate charged 4:30 AM to 7:00 AM. Inspector Premium Travel Name Time Hours Time Thomas Cunningham No Max Day .5 Hr(s) Mark Geraci No Max Day .5 Hr(s) REVIEWED BY:Bryan M. Crabtree Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 02-11-2020Compressive Strength Report - Concrete Report No.31 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Dodge Area, llc Ken McClure Opechee Construction Jeff Daigneault Opechee Construction Jason Blaise City of Salem Steve Cummings Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 02-11-2020Compressive Strength Report - Concrete Report No.31 Distribution Copy Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 Washington Contractor Opechee Construction Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Slab on deck, slab 23 Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation:X Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer Field X Other Inside building Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)6-8 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 5 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 02-11-2020 Report No.31 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment UTS of Massachusetts, Inc. Page 6 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 02-11-2020 Report No.31 Job Number 22528 Project 11 Dodge Street, Salem, MA Hampton Inn Salem & 231 WashingtonAttachment