Forest River Pool site section 3 plan a
COASTAL BEACH
TO BE RESTORED
RAIN GARDEN PROPOSED SLOPE LINE _ EXISTING LIMIT OF COASTAL EXISTING SALT MARSH
COASTAL BEACH BEACH RESTORATION ' l— EXISTING LEDGE BEYOND
— ElEV.15 0— — — — —
�� EX.MHW 8.7T
ELEV.10'0" - - - - -- -- - - -
— E-EV.5 a'— — — — — — — — — — ——
I
— — — — — — — — — STACKED COIR LOG
121-0" 511-2" _ PORTION OF EXISTING POOL
5-811 WN SEE 6 COASTAL BANK PLANTING STRUCTURE TO BE REMOVED
PATHWAY / Notes:
1. Elevations Refer to City of Salem Datum
2. City of Salem Datum is Equal to NAVD88
+ 3.5
3 SITE SECTION 3
004 SCALE: 1/16"= T-0"
0 8' 16, 32'
Forest River Pool Replacement Salem, Massachusetts
thaSite Section 3