Loading...
Forest River Pool site section 1 plan PROPOSED SLOPE LINE i COASTAL BEACH LIMIT OF COASTAL ' EXISTING POOL � � DECK TO BE REMOVED TO BE RESTORED BEACH RESTORATION i r L' EXISTING EXISTING SALT MARSH EXISTING LEDGE BEYOND COASTAL BEACH EX.MHW 8.77' � l ~ --- ------------ -.------------.--- -- --_-__-------_ -_- l� r NFILL �_-------- �— • — — '— � STACKED COIR LOG EXISTING POOL PORTION OF EXISTING POOL STRUCTURE TO REMAIN STRUCTURE TO BE REMOVED Notes: 1. Elevations Refer to City of Salem Datum 2. City of Salem Datum is Equal to NAVD88 60'-6" 23'-0" + 3.5 PATHWAY COASTAL BANK PLANTING HIGH MARSH PLANTIN 1 SITE SECTION 1 002 SCALE: 1/16"= 1'-0" 32' Forest River Pool Replacement Salem, Massachusetts bhc I I� Site Section 1