Loading...
NEW HOME, ROUTING SLIP, C/O, S/O B-19-997 ,t cA.J CITY OF SALEM ROUTING SLIP New Construction Certificate of Occupancy LOCATION DATE ASSESS S DATE O fr!6 if' 93 shington St. CITY CLERK9LL.SA,vvoikODATE / / /Zn 93 Washington St. PUBLIC SERVICES , DATE / / /62 7 Z 6 120 Washington St. WATER ( DATE ///G, 120 Washington St. CROSS CONNECTION ( DATE / Po 1 7_0 5 Jefferson Ave /�� PLANNING ki„,vt��J %'�/ / l ATE 120 Washington St. CONSERVATION I t,/ ,_I '' I ATE \ I kc 120 Washington St ELECTRICAL � i �/ DATE /1/2e 26 48 Lafayette St "' rFIRE PREVE ION fp DATE OSz° 1 29 Fort Avenue % z HEALTH \ DATE dks.ri 120 Washington St.' BUILDING INSPECTOR DATE 120 Washington St. ° °`T?� \; Commonwealth of Massachusetts *rz de yP VCity of Salem t ' 120 Washington St.3rd Floor Salem,MA 01970(978)745-9595 x5641 Return card to Building Division for Certificate of Occupancy Permit No. B-19-997 P E R M I T TO B U I L D FEE PAID: $1,183.00 DATE ISSUED' 9/10/2019 This certifies that MA RE HOLDINGS, LLC has permission to erect, alter, or demolish a building 22 CEDARCREST AVENUE Map/Lot: 210048-0 as follows: Other Building Permit NEW CONSTRUCTION MODULAR HOME Contractor Name: MICHAEL MOSKO DBA: STORM DEVELOPMENT Contractor License No: CS-110947 fi iJy` =�� 9/10/2019 Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund' (as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Jftvw'"c=""""��,, Commonwealth of Massachusetts (/ ' City of Salem 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 in„nt;Dow Return card to Building Division for Certificate of Occupancy Structure CITY OF SALEM BUILDING PERMIT 4Nt07D^`T,�� Excavation PERMIT TO BE POSTED IN THE WINDOW G Footing INSPECTION RECORD `A1111 Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final Plumbing/Gas Rough:Plumbing Rough:Gas Final/r; 7/47) Electrical Service Rough Final � ��/)�'�'/J Fire Department Preliminary )ie Final 1 f/ _ /�a +�( / Health Department Preliminary Final Certificate Number: B-19-997 Permit Number: B-19-997 Commonwealth of Massachusetts City of Salem This is to Certify that the Devel Land Building located at Building Type 22 CEDARCREST AVENUE in the City of Salem Address Town/City Name IS HEREBY GRANTED A PERMANENT CERTIFICATE OF OCCUPANCY Single Family Home This Permit is granted in conformity with the Statutes and Ordinances relating thereto, and expires Not Applicable unless sooner suspended or revoked. Expiration Date Issued On: Tuesday, January 28, 2020 Home Energy Rating Certificate Rating Date: 2020-01-214 Final Report rt Registry ID: 033675591 p Ekotrope ID: wdk03zbv HERS® Index Score: nnual Savin S Home: 5 Your home's HERS score is a relative perfor Cedarcrest Ave 22 score. The lower the number, the more ener Salem, MA 01970 efficient the home. To learn more, visit lative to,an average U.S. home wvvw.hersindex.com Builder: MA RE Holdings LLC Your Home's Estimated Energy Use: This home meets or exceeds the Use [MBtu] Annual Cost criteria of the following: Heating 40.0 $774 2015 International Energy Conservation Code Cooling 0.0 SO Hot Water 8.2 $155 Lights/Appliances 17.5 $822 Service Charges $190 Generation (e.g. Solar) 0.0 $0 HERS Index Home Feature mary: $1,941 Rating Completed by: ? Mw•En•r[V Home Type: Single family detached Energy Rater:Ian Rex Model: N/A RESNET ID:1454792 Ex 5f,ng I „o Community: N/A Homes I „o Conditioned Floor Area: 1,997 ft2 Rating Company:Ace Energy Services, Inc. 120 Number of Bedrooms: 3 168 Walton Rd, Unit 26 Seabrook, NH 03874 Reference 100 Primary Heating System: Furnace•Natural Gas•96.5 AFUE Home - go Primary Cooling System: N_A 978-233-1433 IIII eo Primary Water Heating: Water Heater•Natural Gas•0.96 Energy Factor MI 70 House Tightness: 868 CFM50(2.92 ACH50) Rating Provider:Building Efficiency Resources ,„ ,7. 4 III "° - 5fl Ventilation: 48.0 CFM•5.5 Watts PO Box 1769 Brevard,NC 28712 Z 3 Pino Duct Leakage to 60 CFM 25Pa(3/100 s.f.) 800-399-9620 �3 .. le � to Outside: a... • :U Above Grade Walls: R-21 Zero Energy 19 Ceiling: Attic, R-49 Home o Window Type: U-Value:0.29, SHGC:0.32 l ""`""s' Foundation Walls: N/A IECC 2015 Label 22 Cedarcrest Ave Ekotrope RATER -Version: 3.1.1.2340 HERS® Index Score: 50 Ceiling:R-49 Above Grade Walls: R-21 Foundation Walls: N/A Exposed Floor: R-30 Slab: null Infiltration: 868 CFM50 (2.92 ACH50) Duct Insulation: R-6 Duct Lkg to Outdoors: 60 CFM @ 25Pa (3/ 100 s.f.) U-Value: 0.29, SHGC: 0.32 Door: R-9 Heating: Furnace • Natural Gas • 96.5 AFUE Cooling: N_A Hot Water: Water Heater• Natural Gas • 0.96 Energy Factor Signature: t0: " °'T Commonwealth of Massachusetts r, City of Salem Y`4., 'L. it, #. is s 120 Washington St.3rd Floor Salem.MA 01970(978)745-9595 x5641 ‘,, ire Return card to Building Division for Certificate of Occupancy Permit No. B-18-1274 P E R M i T TO B U I L D FEE PAID: $198.00 DATE ISSUED: 11/21/2018 This certifies that CAMP LION OF LYNN MASS INC c/o SPECTRASITE-MA0032 has permission to erect, alter, or demolish a building 488-REAR HIGHLAND AVENUE Map/Lot: 30139-0 f as follows: Other Building Permit REMOVE & REPLACE THREE (3) ANTENNAS & ADD THREE (3) ADDITIONAL ANTENNAS WITH CORRESPONDING RRHS & THREE (3) FIBER LINES @ CAMP LION ON 2 CAIN ROAD LYNN. Note: Sprint requested a change of contractors from Kenneth Zink to Theodore Bartlett & an extension of 6 months (02/21/2019) Contractor Name. THEODORE BARTLETT DBA: SQUAN CONSTRUCTION SERVICES Contractor License No: CS-109155 6:17-41...itA4.4.,- 11/21/2018 i Building Official Date This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official 1 may grant one or more extensions not to exceed six months each upon written request. All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted. All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes. This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the work until the completion of the same. The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit. HIC #: 'Persons contracting with unregistered contractors do not have access to the guaranty fund'(as set forth in MGL c.142A). Restrictions: Building plans are to be available on site. All Permit Cards are the property of the PROPERTY OWNER. Commonwealth of Massachusetts City of Salem „ 120 Washington St.3rd Floor Salem.MA 01970(978)745-9595 x5641 - r � Return card to Building Division for Certificate of Occupancy ' Structure , ' CITY OF SALEM BUILDING PERMIT PERMIT TO BE POSTED IN THE WINDOW Excavation Footing INSPECTION RECORD Foundation Framing Mechanical Insulation INSPECTION: BY DATE Chimney/Smoke Chamber Final iJ, g., 20 ems' Plumbing/Gas Rough:Plumbing Rough:Gas Final Electrical Service Rough Final Fire Department Preliminary Final Health Department Preliminary i Final