S/O B-19-1341 UNIT 309 w` `'i.b Uommonwealth of Massachusetts n:,
iiiiro City of Salem ff120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 ? ' �1 Q
a AVE Return card to Building Division for Certificate of Occupancy
Permit No. B-19-1341
PERMIT TO BUILD FEE PAID: $110.00
DATE ISSUED: 11/27/2019
This certifies that SALEM HIGHLAND REALTY TRUST BENDETSON RICHARD
has permission to erect, alter, or demolish a building 84 HIGHLAND AVENUE Map/Lot: 140150-0
as follows: Other Building Permit OFFICE RENOVATIONS TO UNIT 309 PER PLAN SUBMITTED
Contractor Name: JAMES FELDHUSEN
DBA: PIVOTAL BUILDERS, INC
Contractor License No: CS-084672
11/27/2019
,g, ,_.1,7‹ —
iri(1,,,„ . ' 4,-,.....
Building Of If vial f Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC #: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
{ ,:,ON°�IT' ,�� ; Commonwealth of Massachusetts
7�k4 ___ f City of Salem
Wil
s 120 Washington St.3rd Floor Salem.MA 01970(978)745-9595 x5641
BMW!`. ,3'
Return card to Building Division for Certificate of Occupancy
Structure �o�n�=,,
CITY OF SALEM BUILDING PERMIT
PERMIT TO BE POSTED IN THE WINDOW • ,
Excavation ';
Footing
INSPECTION RECORD �'MIa -
Foundation !� (�
Framing l y^I
f {Z 11 •. 1 U
Cali' (��
Mechanical �4
n
Insulation j z t (cl Vdc v SPECTION: BY DATE
Chimney/Smoke�C7hamber /
Final ( ? C /, h. *
4" Plumbing/Gas
d
Rough: Plumbing
Rough:Gas
Final
ij Electrical
Service
Rough // �-7�� 3 ICI
rJ� / // //2 .zin Lid
Final
Fire Department
Preliminary
Finale i J 6�e/�
f �J 4�
4,4 Health Department
Preliminary
Final
r