S/O B-18-357 62-UGA WHARF STREET �Pv' ` T.,.-4 E Commonwealth of Massachusetts _,
I.yTs '; T City of SalemEi
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
d,�. y,^PC.
'4%/.mini'.Do.
Return card to Building Division for Certificate of Occupancy
Permit No. B-18-357 PERMIT TO B U I L D
FEE PAID: $1,419.00
DATE ISSUED: 5/14/2018
This certifies that PICKERING WHARF COMPLEX, LLC ROCKETT MANAG &
has permission to erect, alter, or demolish a building on: 62-UGA WHARF STREET Map/Lot: 340408-803
as follows: Other Building Permit TENANT FIT OUT, 1ST FL COMMERCIAL SPACE. MIX OF
MERCANTILE USE & BUSINESS USE FOR CATERING KITCHEN & CLASSROOM FOR COOKING
CLASSES
Verbal given by T. St. Pierre to start project 05/02/2018
permit to follow within 30 days.
Contractor Name: CLAUDE DWAN
DBA: R C GRIFFIN INC -_
Contractor License No: CS-078163 r4,441"L":
5/14/2018
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building
Official may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of
the work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
„,,coNaz 4 Commo `• Mdssachusetts
qT1c,j) C wSalem I� ° 120 Washington St 3rlfloot''-len4 MA 01970(978)745-9595 x5641 ,. ram'
c'”'"E ,' Return card to Building Division for Certificate of Occupancy
Structure CITY OF SALEM BUILDING PERMIT M " =,,,,
PERMIT TO BE POSTED IN THE WINDOW `,' ,�
Excavation ;� 'c,.
Footing INSPECTION RECORD N.
• Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final ,_ 9„ 2 , p i_,�j
.," ( Plumbing/Gas414r
`Plumbing
Rough.Gas
Final to J /i
Q (� 10
Lai Electrical
Service
Rough /
//)>, I J " t- E ide, 1 r 4
:, .., ,, ,)
ire De r t � ) /� J
z.e.i-i,.:"
1110,
f c\��b - _ 13- /•
r• -Pi45 5 I J f2v,vV s'tc: ue- Kr ' L - C _
Prey china ' \ N ``I- t n�',A '�
J �i~17�✓
Firial \ i
Health Department J
zinew
Preliminary
di
I/C7
I ��
t