Loading...
UTS Job 23418 Report 111 Soil Inspection Report 12-13-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-13-2019Soil Inspection Report Report No.111 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy 20-40° TIME:7:00 AM CONTACT:Pat Madden of Fulcrum Associates PURPOSE:Observe earthwork construction EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum Roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: This report follows a site visit to observe/test the earthwork for: Footing trench excavation. Pavement sub grade prep continued within proposed parking and roadway areas located at the North side of building 1. The fill was expanded to the south to insure adequate compaction along the edge of pavement. The material used as pavement base is 1.5" reprocessed material from the Caruso Pit in Revere, MA. Efforts this date focused on fine grading and compaction efforts. Grading was performed using the bulldozer and grader. The surface of the gravel base was compacted utilizing the IR 10 ton drum roller exhibiting stable/firm conditions. Grading efforts were delayed due to the presence of overnight frost accumulation. Grading and compaction of pavement base remained incomplete on this date. Installation of drainage utilities was performed @ the north side of building 1 to accommodate the limits of paving operations. 12" diameter HDPE piping was installed from previously installed DMH 15 toward proposed CB 15. The piping was bedded and covered in ¾" crushed stone. The area was filled using 1.5" reprocessed material from the Carusso Pit in Revere, MA. Compaction was performed using the ½ ton plate compactor exhibiting stable/firm conditions. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-13-2019Soil Inspection Report Report No.111 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS Jill Crabtree UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-13-2019 Report No.111 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment