UTS Job 23418 Report 111 Soil Inspection Report 12-13-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-13-2019Soil Inspection Report
Report No.111
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Partly cloudy 20-40°
TIME:7:00 AM
CONTACT:Pat Madden of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum
Roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Pavement sub grade prep continued within proposed parking and roadway areas located at the North
side of building 1. The fill was expanded to the south to insure adequate compaction along the edge of
pavement. The material used as pavement base is 1.5" reprocessed material from the Caruso Pit in
Revere, MA. Efforts this date focused on fine grading and compaction efforts. Grading was performed
using the bulldozer and grader. The surface of the gravel base was compacted utilizing the IR 10 ton
drum roller exhibiting stable/firm conditions. Grading efforts were delayed due to the presence of
overnight frost accumulation. Grading and compaction of pavement base remained incomplete on this date.
Installation of drainage utilities was performed @ the north side of building 1 to accommodate the
limits of paving operations. 12" diameter HDPE piping was installed from previously installed DMH 15
toward proposed CB 15. The piping was bedded and covered in ¾" crushed stone. The area was filled using
1.5" reprocessed material from the Carusso Pit in Revere, MA. Compaction was performed using the ½ ton
plate compactor exhibiting stable/firm conditions.
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-13-2019Soil Inspection Report
Report No.111
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Pat Madden
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
Fulcrum Associates Bob Levesque
DSF Advisors Thomas Mazza
UTS Jill Crabtree
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-13-2019
Report No.111
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment