Loading...
UTS Job 23432 Report 4 Compressive Strength Report - Concrete 11-21-2019 (003)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-21-2019Compressive Strength Report - Concrete Report No.4 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction Concrete Co.J.G. MacLellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-231 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3500# 3/8"No. Of Sets:1 11CUBIC YARDS: SET 1 LOCATION:Handicap Ramp Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type R751 4.00 x 8.00 12.57 Good 11/21/19 11/28/19 7 32,500 2,590 3 R752 4.00 x 8.00 12.57 Good 11/21/19 12/05/19 14 57,500 4,570 2 R753 4.00 x 8.00 12.57 Good 11/21/19 12/19/19 28 72,500 5,770 1 R754 4.00 x 8.00 12.57 Good 11/21/19 12/19/19 28 61,000 4,850 3 R755 4.00 x 8.00 12.57 Good 11/21/19 12/19/19 28 65,000 5,170 4 Slump (in.)5 Air Temp. (F.)36 Conc Temp (F)70 Truck No.160 Ticket No.4870 Time 10:30 Unit Wt lbs/cu ft Air Content (%)5.9 GENERAL REMARKS:Cylinders received on 11/26/19. Inspector Premium Travel Name Time Hours Time Conner Welch No Min Day 1 Hr(s) REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-21-2019Compressive Strength Report - Concrete Report No.4 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction Concrete Co.J.G. MacLellan cc:Green Leaf Construction Chris Ruth Green Leaf Construction Dan Spinney City of Salem Steve Cummings Green Leaf Construction James Caponigro Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-21-2019Compressive Strength Report - Concrete Report No.4 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction Concrete Co.J.G. MacLellan FIELD SUMMARY REPORT Total Pour:Handicap Ramp Method of Placement:Pump Chute Discharge Bucket OtherX Other: Vibrator OtherMethod of Concrete Consolidation: Other: Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat None OtherX Slump Specification (in.)4-7 Number of slumps out of specification reported to If rejected Approved by Remarks: UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-21-2019 Report No.4 Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Attachment