Loading...
UTS Job 23418 Report 9 C.M.U. Mortar Summary Report 12-19-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-19-2019C.M.U. Mortar Summary Report Report No.9 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Mortar Strength (psi.):O - 350 N - 750 X S - 1800 M - 2500 Other: On Site Mix:Pre-Mix (brand):Quickrete Spec Mix Masonry Cement (brand): Admixture(s):Type:Brand: Type:Brand: Pigment(s):Type:Brand:Dye Lot: Type:Brand:Dye Lot: Block Block Type:X Standard Glazed Split Faced Other: Block Size:4"6"X 8"10"12" Other: Horizontal Joint Reinforcement Wire Size (#):9 Gauge Type:Truss X Ladur Tri-Rod Hook and Eye Prefab "Ells"Prefab "Tees" Other: Spacing:8" o.c.X 16" o.c.24" o.c. Other: Wall Ties:Adjustable Trap Triangle Corrugated Other: Flashing Material: Location:Thruwall Base Sill Head Jamb Cap Other: Joints Type:Struck X Tooled Raked Other: GENERAL REMARKS:Total Wall Construction Bldg #2 Elevator Shaft Courses #4 - #8. The area of work was enclosed and heated to an ambient air temperature of 56 degrees. Inspector Premium Travel Name Time Hours Time M. Chace No Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-19-2019C.M.U. Mortar Summary Report Report No.9 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates REVIEWED BY:William P. Crabtree Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS Jill Crabtree