Loading...
UTS Job 23418 Report 112 Soil Inspection Report 12-16-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-16-2019Soil Inspection Report Report No.112 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Partly cloudy, upper 20's-40's TIME:7:00 AM CONTACT:Pat Madden of Fulcrum PURPOSE:To observe earthwork construction and perform field density testing EQUIPMENT:Deere 450C, 380G, 75G & 992E excavators; Wacker DPU 6555 & 200Lb. plate compactors, CAT 980 & 950 loaders and Ingersoll Rand pro pac 110 series 10 ton drum roller. TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX Maximum Field Test Percent Dry Dry Percent Elevation No.Moisture Density Density Compaction Location (Feet) 1 7.4 129.2 125.7 97.3 Pavement base at N. of build#1 Pavement base 2 8.2 129.2 128.3 99.3 Pavement base at N. of build#1 Pavement base 3 7.3 129.2 131.4 101.7 Pavement base at N. of build#1 Pavement base 4 7.7 129.2 124.7 96.5 Pavement base at N. of build#1 Pavement base 5 9.1 129.2 126.4 97.8 Pavement base at N. of build#1 Pavement base 6 8.6 129.2 128.3 99.3 Pavement base at N. of build#1 Pavement base 7 7.6 129.2 131.3 101.6 Pavement base at N. of build#1 Pavement base 8 7.6 129.2 125.6 97.2 Pavement base at N. of build#1 Pavement base OBSERVATIONS: Pavement subgrade prep continued within proposed parking and roadway areas located at the North side of building 1. The fill was expanded to the South to insure adequate compaction along the edge of pavement. The material used as pavement base is 1.5" reprocessed material from the Carusso pit in Revere, MA. Efforts this date focused on fine grading and compaction efforts. Grading was performed using the bulldozer and grader. The surface of the gravel base was compacted utilizing the IR 10 ton drum roller exhibiting stable/firm conditions. The pavement base course material used at the Mason street entrance is 3/4" dense graded gravel consisting of F gravel and sand, trace silt. The dense grade gravel was used over the in place reprocessed material base to shim to required elevation. Grading efforts were delayed due to the presence of overnight frost accumulation. Eight compaction tests were performed on the pavement base by Troxler method. All tests exceeded 95% compaction of the modified proctor. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-16-2019Soil Inspection Report Report No.112 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS Jill Crabtree UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 12-16-2019 Report No.112 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment