C/O & B/P'S @ U13-15 SOLAR SALON c°.,D/7,,,4 Commonwealth of Massachusetts
n t , City of Salem '
a � la
ya ^` �t 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-19-782 TO B JILD
PERMIT
DATE ISSUED: 7/25/2019
This certifies that HIGHLAND OFFICE,LLC C/O ROCKETT MANAGEMENT CO,
has permission to erect, alter, or demolish a building 400 HIGHLAND AVENUE Map/Lot: 30005-0
as follows: Other Building Permit IN SUITES 13-15: TENANT BUILD OUT OF A SOLA SALON, NO DEMO
NEEDED.
Contractor Name: JANSEN J. GEHRING
DBA: BANYAN CONSTRUCTION SERVICES, INC
Contractor License No: 112767
7/25/2019
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
H IC#: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
sl =NY'1,--'-1. Commonwealth of Massachusetts
A City of Salem ��C
qf.
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641 T��
Return card to Building Division for Certificate of Occupancy "
Structure CITY OF SALEM BUILDING PERMIT „v�` ,,s
PERMIT TO BE POSTED IN THE WINDOW { ,
Excavation G
.c=
Footing
INSPECTION RECORD =`
Foundation
Framing Jo '/(e)` J,
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber ® G ((,� ( �
Final i n _3 0 C .I-L I 1 ! V' (/ �✓� a� ✓ .
e 34 Plumbing/Gas
Rough: Plumbing/Obi bi)t /,�i
Rough:Gas
Final\a, 0
iij , ig -, ` rf
Electrical
Service Rough / / 9/" / ,j
i
Final
Fire D ment
Preliminary
Fina ` -` f? 2'./ /1
,, Health Department
Preliminary
Final
Commonwealth of Massachusetts
,� City of Salem
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595>5641
Return card to Building Division for Certificate of Occupancy
Permit No. B-19-1329 PERMIT TO BUILD
FEE PAID: $0.00
DATE ISSUED: 11/26/2019
This certifies that HIGHLAND OFFICE,LLC C/O ROCKETT MANAGEMENT CO,
has permission to erect, alter, or demolish a building 400 HIGHLAND AVENUE Map/Lot: 30005-0
as follows: Other Building Permit INSTALL SIGN PERMIT PER PLAN SUBMITTED FOR SOLA SALONS
Contractor Name:
DBA:
Contractor License No: (44
11/26/2019
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public nspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided in this permit.
HIC#: "Persons contracting with unregistered contractors do not have access to the gum anty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
v:�co.,..,- I
,a Commonwealth of Massachusetts :_
yV,iii
��J City Of Salem t
°` - i.
120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x 5641 -`
-is----LAURI D-
Return card to Building Division for Certificate of Occupnncy
Structure CITY OF SALEM BUILDING PERMIT DIT,
PERMIT TO BE POSTED IN THE WINDOW i °3
Excavation yl' F II /
yy. -
,
' ..:-),','
Footing INSPECTION RECORD "' '
Foundation
Framing
Mechanical
Insulation INSPECTIO'1: BY DATE
Chimney/Smoke Chamber
Final 1 2. 3o,/2 —� —
Plumbing/Gas
Rough: Plumbing
Rough:Gas
Final
thi Electrical
Service
Rough
Final
Fire Department
Preliminary
Final
44 Health Department
Preliminary
Final
I
I
y„ti�`°N°`T�-4•
)mmonwealth of Massachusetts
E City of Salem v '
,�
0>f,,,'- 0- .cr 120 Washington St.3rd Floor Salem.MA 01970(978)745-9595 x5641
MINK:Doti
Return card to Building Division for Certificate of Occupancy
Permit No. B-19-909
PERMIT
TO BUILD
FEE PAID: $275.00 •DATE ISSUED: 8/22/2019
This certifies that HIGHLAND OFFICE,LLC C/O ROCKETT MANAGEMENT CO,
has permission to erect, alter, or demolish a building 400 HIGHLAND AVENUE Map/Lot: 30005-0
as follows: Sheet Metal REMODEL BUILDING AND CONNECT 3 HVAC UNITS
Contractor Name: MAHDI ARACHICHE •
DBA: SOUMADEL HVAC LLC
Contractor License No: 13874
r./4,,,I.,--0- 8/22/2019
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
HIC #: "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
k
.:..�b
' tj/z.g
‘10 fij
4
,\,.....___„,,.
. .0.0,..0.
,,,,,__
hUNE 9`
ar Structure ( _1 a LEM BUIL ih !MIT V~` '~,
b
PERMIT TO BE POSTED IN THE .rINDOW
Excavation :
Footing INSPECTION RECORD ``°.
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final
/42 ,30 / 9
6 7
Plumbing/Gas
Rough: Plumbing
Rough:Gas
Final
LiElectrical
Service
Rough/� ,J�j� i/� /��
Final (` //
41iiiFire Department
Preliminary
Final
_ ) Health Department
Preliminary
Final
c" Commonwealth of Massachusetts ,
•� .• o City of Salem
., ,..
A a 120 Washington St,3rd Floor Salem,MA 01970(978)745-9595 x5641
Return card to Building Division for Certificate of Occupancy
Permit No. 8-19-503 PERMIT TO B U I L D
FEE PAID: $165.00
DATE ISSUED: 5/15/2019
This certifies that HIGHLAND OFFICE,LLC C/O ROCKETT MANAGEMENT CO,
has permission to erect, alter, or demolish a building 400 HIGHLAND AVENUE Map/Lot: 30005-0
as follows: Other Building Permit IN SUITE 13-15:
REMOVE EXISTING INTERIOR WALLS. (GAS &WATER SERVICE TO REMAIN.
Contractor Name: T. Michael Rockett
DBA: VILLAGE CONSTRUCTION
Contractor License No: CS-054710
(4.„..,,,t,e4-,
5/15/2019
Building Official Date
This permit shall be deemed abandoned and invalid unless the work authorized by this permit is commenced within six months after issuance.The Building Official
may grant one or more extensions not to exceed six months each upon written request.
All work authorized by this permit shall conform to the approved application and the approved construction documents for which this permit has been granted.
All construction,alterations and changes of use of any building and structures shall be in compliance with the local zoning by-laws and codes.
This permit shall be displayed in a location clearly visible from access street or road and shall be maintained open for public inspection for the entire duration of the
work until the completion of the same.
The Certificate of Occupancy will not be issued until all applicable signatures by the Building and Fire Officials are provided on this permit.
H I C#: 114654 "Persons contracting with unregistered contractors do not have access to the guaranty fund"(as set forth in MGL c.142A).
Restrictions:
Building plans are to be available on site.
All Permit Cards are the property of the PROPERTY OWNER.
A.szsioNn r,,, `,a sachusetts
—,, —
1 °: 4A,
City o Saiem
li
.As�`�°- 120 Washington St,3rd Floor Salem.MA 01970(978)745-9595 x5641
C M A DO
Return card to Building Division for Certificate of Occupancy
{ • Structure CITY OF SALEM BUILDING PERMIT �� ` ,, :b
" ' PERMIT TO BE POSTED IN THE WINDOW ,,. - \'
Excavation '� ,
Footing INSPECTION RECORD
Foundation
Framing
Mechanical
Insulation INSPECTION: BY DATE
Chimney/Smoke Chamber
Final
Plumbing/Gas
Rough: Plumbing
Rough:Gas
Final/2, 30 _ J Q
iii Electrical
Service
Rough
Final
h,
U Fire Department
Preliminary
1
Final
j{ Health Department
Preliminary
Final