Loading...
CONSTRUCTION OBSERV. #2, 12/04/2019 PITMAN & WARDLEy ASSOCIATES Architecture & Design 32 Church Street • Salem. MA • 978 744 8987 CONSTRUCTION OBSERVATION#2 December 4,2019,2019 Tom St.Pierre Inspectional Services Director City of Salem Inspectional Services Salem,Massachusetts 01970 Project: Tri City Sales 262 Highland Ave,Salem,MA Re: Construction Observation Dear Tom, The following observations are based on a periotic site visits by Michel Beheshti,of my staff. Observation: General areas: The project's demolition is being done in two phases. Phase I: • All existing walls are removed. • The appliances are in place. • The electrical work above ceiling is complete and inspected. • The electrical rough in-wall is complete and inspected. • The patching and painting is complete. • The new ceiling lights are installed. • The new flooring is in place. Phase II: • Demolition is 95%complete. • Some ACT ceiling grid are being installed. • Some new walls are installed for the new layout. • The main soffit is in place. • The New lights are installed. • Partial partition framing is going on.. Recommendations or Actions: 1-The Structural Engineer will be submitting independent reports. 2-The MEP,fire protection,civil reports are not part of this report. Please do not hesitate to be in touch with this office should you have any further questions and or concerns. Respectfully ay�*ADAge Peter F.Pitman,Architect No.8749 Massachusetts Registration No.8749 NOF