The following observations are based on a periotic site visits by Michel Beheshti,of my staff.
Observation:
General areas:
The project's demolition is being done in two phases.
Phase I:
• All existing walls are removed.
• The appliances are in place.
• The electrical work above ceiling is complete and inspected.
• The electrical rough in-wall is complete and inspected.
• The patching and painting is complete.
• The new ceiling lights are installed.
• The new flooring is in place.
Phase II:
• Demolition is 95%complete.
• Some ACT ceiling grid are being installed.
• Some new walls are installed for the new layout.
• The main soffit is in place.
• The New lights are installed.
• Partial partition framing is going on..
Recommendations or Actions:
1-The Structural Engineer will be submitting independent reports.
2-The MEP,fire protection,civil reports are not part of this report.
Please do not hesitate to be in touch with this office should you have any further questions and or concerns.