Loading...
UTS Job 23432 Report 1 Asphalt Inspection Report 11-16-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-16-2019Asphalt Inspection Report Report No.1 Distribution Copy Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Contractor Green Leaf Construction WEATHER:Clear 30° TIME:6:30 AM CONTACT:Matt Burnett of Masterson TEST METHOD:X Field Nuclear Densometer OBSERVATIONS: Saturday premium rate. This report follows a site visit to observe bituminous paving operations. PAVING CONTRACTOR: Milinazzo PAVING EQUIPMENT: LB 8520 Paver, Sakai SW770 Paver, L230 Roller, Sakai 320 Roller, B100 Roller ASPHALT SUPPLIER: Aggregate, Peabody, MA DO SUBGRADE BASE CONDITIONS APPEAR DRY, STABLE, COMPACT and UNFROZEN? Yes. BITUMINOUS SPECIFIED COMPACTED PAVEMENT MIX DESIGN THICKNESS THICKNESS TONS LOCATION Binder Course 3/4" MA Dense 2 1/2" 2 1/2" 150 See Sketch Bituminous mix temperatures monitored at time of placement varied between 280 and 305 degrees Fahrenheit. Inspector Premium Travel Name Time Hours Time Derek Hunter Yes Max Day 1 Hr(s) REVIEWED BY:William P. Crabtree Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Green Leaf Construction Chris Ruth Green Leaf Construction Dan Spinney City of Salem Steve Cummings Green Leaf Construction James Caponigro UTS of Massachusetts, Inc. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-16-2019 Report No.1 Job Number 23432 Project FW Webb,295 Bridge St.,Salem, MA Attachment