UTS Job 23418 Report 107 Soil Inspection Report 12-09-2019 Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-09-2019Soil Inspection Report
Report No.107
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
WEATHER:Overcast/rain 30-40°
TIME:7:00 AM
CONTACT:Pat Madden of Fulcrum Associates
PURPOSE:Observe earthwork construction
EQUIPMENT:Deere 450C, 380G, 75G & 992E Excavator, Wacker DPU 6555 & 200Lb. Plate
Compactors, CAT 980 & 950 Loaders & IR Pro Pac 110 Series 10 ton Drum
Roller
TEST METHOD:Sand Cone Nuclear Densometer
TITLE:Inspector Staff Engineer EngineerX
OBSERVATIONS:
This report follows a site visit to observe/test the earthwork for: Footing trench excavation.
Pavement sub grade prep was performed within proposed parking and roadway areas located at the
North side of building 1. The existing common fill was cut down to the required depth (24" below F.G.
in heavy duty traffic areas and 18" in standard duty traffic areas. Cuts were performed utilizing the
Deere 380 and 75 excavators and deere bulldozer. The exposed sub grade bearing stratum is previously
placed onsite generated common fill (urban fill) generally consisting of F - C sand, some gravel little
silt with minor amounts of various debris such as wood, ash, glass, coal, cinders Etc. The exposed sub
grade appears stable and compact. The material used as pavement base is 1.5" reprocessed material from
the Caruso Pit in Revere, MA. A layer of bi axial geogrid was placed between the sub grade and pavement
base course material. The surface of the gravel base was compacted utilizing the IR 10 ton drum roller
exhibiting stable/firm conditions. Work in this area remained incomplete on this date.
Inspector Premium Travel
Name Time Hours Time
M. Chace No 8.00 1 Hr(s)
REVIEWED BY:Chuck Fraser
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
Page 2
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-09-2019Soil Inspection Report
Report No.107
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
cc:Fulcrum Associates Pat Madden
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
Fulcrum Associates Bob Levesque
DSF Advisors Thomas Mazza
UTS Jill Crabtree
UTS of Massachusetts, Inc. Page 3
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 12-09-2019
Report No.107
Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MAAttachment