Loading...
FINAL CONST CONTROL 12/5/19 & FLOW DESIGN Final Construction Control Document z f To be submitted at completion of construction by a Iigli! t 1 Registered Design Professional i for work per the 8th edition of the ,. eY Massachusetts State Building Code, 780 CMR, Section 107 Project Title: 116 Highland Ave Mixed Use Date: December 5, 2019 Permit No. Property Address: 116 Highland Avenue, Salem,MA 01960 Project: Check(x)one or both as applicable:New construction X Existing Construction Project description: The project done at 116 Highland Avenue included the interior renovation of the first floor and the second floor addition of three new dweling units.New rated partitions were added between each unit as well as non rated interior partitions. I Darguin Fortuna MA Registration Number: 951922 Expiration date: 08/31/2020,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans,computations and specifications concerning: XArchitectural Structural Mechanical Fire Protection Electrical Other:Describe for the above named project.I,or my designee,have performed the necessary professional services and was present at the construction site on a regular and periodic basis.To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar withthe progress and quality of the work and to determine if the work was performed in a manner consistentwith the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. Enter in the space to the right a"wet"or \��RED 4Re'��r electronic signature and seal: es Fo`b„ 4o), e Z 4 No.951922 T N LSALE t �S j.� .�l'` Phone number: 978-818-5109 Email: Dfortuna@flow-design-studio.com Building Official Use Only Building Official Name: Permit No.: Date: Version 06 11 2013 DesignFlew Field Report 01 Page 1 of 1 Date: September 03, 2019 Flow Job Number: 19027 Flow Job Name: 116 Highland Avenue Time: 11:00 am Temp: 80 Weather: Sunny Estimated%Complete: 50% Conformance With Schedule: Yes Present at Site: Darguin Fortuna - Flow Design Observations By: Marcos Severino - Flow Design Marcos Severino - Flow Design Observations: • Demolition is 100% complete in conformance with construction documents • Demolition of existing ceiling is 100% complete in conformance with construction documents • Plumbing rough in is 100% complete in conformance with construction documents • Electrical rough in is 100% complete in conformance with construction documents • Interior wood framing 100% complete in conformance with construction documents • Interior drywall is 10% complete • Plumbing fixture installation is 20% complete • Sprinkler head installation is 90% complete • Exterior window installation is 100% complete • Roof insulation is 100% complete I. it i 1 } { tea -, a;., _ r.., . :vile ,,,,,,,:„, fly. . .ft:11r, a Information/Action Required: None E Luw:'r DL':,:GN, IN(_.. 150 GROVE `14L . i1E 22f3 I ALL'.2, MA 01')70 IY/8 :'3 ')109 IsLur,w,)LJ G..A.,RLArEIC i,"0AIL.LoM