Loading...
UTS Job 23418 Report 6 Compressive Strength Report - Grout 11-11-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-11-2019Compressive Strength Report - Grout Report No.6 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.Aggregate Industries ALL FIELD TESTS DONE ACCORDING TO ASTM:C-476 C-1019 C-1064 C-143 C-39 C-617ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS GROUT:3000# fine No. Of Sets:1 CUBIC YARDS: SET 1 LOCATION:Building 1, elevator shaft, Southwest wall, column line D at 4, courses 7-14 Total Unit Lab Size Area Date Date Age Load Load No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.) P956 3 x 3 x 6 9.00 Good 11/11/2019 11/20/2019 9 13,500 1,500 P957 3 x 3 x 6 9.00 Good 11/11/2019 12/09/2019 28 P958 3 x 3 x 6 9.00 Good 11/11/2019 12/09/2019 28 P959 3 x 3 x 6 9.00 Good 11/11/2019 12/09/2019 28 Slump (in.)6 1/2 Air Temp (F.)44 Grout Temp (F.)48 Truck No. Ticket No. Time 8:45 GENERAL REMARKS: Inspector Premium Travel Name Time Hours Time Parke Sickler Jr.No REVIEWED BY:Bryan M. Crabtree Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza