UTS Job 23418 Report 104 Soil Inspection Report 11-22-2019 Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-22-2019Soil Inspection Report Report No.104 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates WEATHER:Cloudy, moderate wind, showers, 40's TIME:7:00 AM CONTACT:Pat Madden of Fulcrum PURPOSE:To observe earthwork construction and perform field density testing EQUIPMENT:Deere 450C, 380G, 75G & 992E excavator; Wacker DPU 6555 & 200Lb. plate compactors, Cat 980 & 950 loaders and Ingersoll Rand pro pac 110 seried 10 ton drum roller TEST METHOD:Sand Cone Nuclear Densometer TITLE:Inspector Staff Engineer EngineerX OBSERVATIONS: Backfilling was performed for site lighting utilities along the west side of building 1. The conduit was bedded in clean imported sand. The shallow trench was backfilled placing a single lift of the select gravel generated during excavation generally consisting of F-C gravel and sand, trace silt. The surface of the backfill material was compacted utilizing the Wacker 1/2 ton plate compactor exhibiting stable/firm conditions. Formwork was performed for the duct bank located at the North side of buildings 1 & 2. The power supply conduits were separated from the low voltage conduits and encased in concrete. Low voltage utilities within landscape areas were bedded in clean imported sand. No backfilling was performed on this date. Drainage utility installation was performed near the North river adjacent to the Southeast corner of building 2. DMH 7 and DMH 8 were installed on this date and connected to previously installed STC 4800. The structures were set atop an approximately 12" thick base of 3/4" crushed stone. Existing timber piles were encountered below the structures and remained in place. The structures were connected using 24" diameter HDPE. The piping was bedded and covered in 3/4" crushed stone. Backfilling operations were not witnessed. Inspector Premium Travel Name Time Hours Time M. Chace No 8.00 1 Hr(s) Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-22-2019Soil Inspection Report Report No.104 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates REVIEWED BY:Chuck Fraser Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza UTS of Massachusetts, Inc. Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-22-2019 Report No.104 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment