Loading...
UTS Job 23418 Report 4 Compressive Strength Report - Grout 11-04-2019 (002)-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-04-2019Compressive Strength Report - Grout Report No.4 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.On-site ALL FIELD TESTS DONE ACCORDING TO ASTM:C-476 C-1019 C-1064 C-143 C-39 C-617ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS GROUT:3000# Fine No. Of Sets:1 CUBIC YARDS: SET 1 LOCATION:Walls; Building 1, Stair 2, 2nd Lift, Course 7-12 Total Unit Lab Size Area Date Date Age Load Load No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.) K890 3 x 3 x 6 9.00 Good 11/04/2019 11/11/2019 7 17,000 1,890 K891 3 x 3 x 6 9.00 Good 11/04/2019 12/02/2019 28 29,000 3,220 K892 3 x 3 x 6 9.00 Good 11/04/2019 12/02/2019 28 28,000 3,110 K893 3 x 3 x 6 9.00 Good 11/04/2019 12/02/2019 28 30,000 3,330 Slump (in.) Air Temp (F.) Grout Temp (F.) Truck No. Ticket No. Time GENERAL REMARKS: Inspector Premium Travel Name Time Hours Time M. Chace No REVIEWED BY:Bryan M. Crabtree Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza