Loading...
UTS Job 23418 Report 60 Compressive Strength Report - Concrete 11-19-2019-Page 1 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-19-2019Compressive Strength Report - Concrete Report No.60 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. Maclellan ALL FIELD TESTS DONE ACCORDING TO ASTM:C-172 C-31 C-143 C-1064 C-39 C-1231ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM: CLASS CONCRETE:3000# 3/4"*No. Of Sets:1 10CUBIC YARDS: SET 1 LOCATION:Building 2, slab on grade, column line F at 5.5 Total Unit Lab Size Area Date Date Age Load Load Fracture No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)Type Q613 4.00 x 8.00 12.57 Good 11/19/19 11/26/19 7 38,000 3,020 3 Q614 4.00 x 8.00 12.57 Good 11/19/19 12/03/19 14 52,500 4,180 3 Q615 4 x 8 12.57 Good 11/19/19 12/17/19 28 Q616 4 x 8 12.57 Good 11/19/19 12/17/19 28 Q617 4 x 8 12.57 Good 11/19/19 12/17/19 28 Slump (in.)7 1/4 Air Temp. (F.)41 Conc Temp (F)66 Truck No.209 Ticket No.089111 Time 9:45 Unit Wt lbs/cu ft Air Content (%) GENERAL REMARKS:*MRWR; Cylinders received on 11/22/2019. Inspector Premium Travel Name Time Hours Time M. Chace No REVIEWED BY:Bryan M. Crabtree FRACTURE TYPES Type 1 Type 2 Type 3 Type 4 Type5 Type 6 Reasonably well-formed Well-formed cone on Columner vertical Diagonal fracture Side fractures at top Similar to Type 5 cones on both ends,one end, vertical cracks cracking through with no cracking or bottom (occur but end of less than 1 in.running through caps,both ends, no through ends; tap commonly with cylinder is [25 mm] of cracking no well-defined cone well-formed cones with hammer to unbonded caps)pointed throught caps on other end distinguish from Type 1 Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information. Page 2 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-19-2019Compressive Strength Report - Concrete Report No.60 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. Maclellan cc:Fulcrum Associates Pat Madden Fulcrum Associates Brad Scott Fulcrum Associates Darrin Standish DMS Design Sid Silveira DMS Design Dan Skolski City of Salem Steve Cummings Veitas & Veitas Linas Dabrila DSF Group Paul Bowie DSF Group Benjamin Greene Fulcrum Group Patricia Dwyer UTS Matt Chace DSF Flint Salem LLC Dimitri Kourtis Fulcrum Associates Bob Levesque DSF Advisors Thomas Mazza Page 3 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-19-2019Compressive Strength Report - Concrete Report No.60 Distribution Copy Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MA Contractor Fulcrum Associates Concrete Co.J.G. Maclellan FIELD SUMMARY REPORT Total Pour:Building 2, slab on grade - package room/lobby elevator Method of Placement:Pump Chute Discharge Bucket OtherX Other:Buggy Vibrator OtherMethod of Concrete Consolidation:X Other:Hand tools and power screed Cylinder Fabrication Location:Truck Discharge Chute End of Pump HoseX Cylinder Storage:Curing Box Thermal Blanket Hay/Straw Trailer FieldX Other Placement Protection:Thermal Blankets Heat NoneX Other Slump Specification (in.)4-6 Number of slumps out of specification reported to (1) 7 1/4, truck 209 If rejected Approved by Remarks:The superintendent was notified of truck times. UTS of Massachusetts, Inc. Page 4 5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax) Report Date 11-19-2019 Report No.60 Job Number 23418 Project Halstead Salem Station, 72 Flint Street Salem, MAAttachment