UTS Job 23418 Report 5 Compressive Strength Report - Mortar 11-05-2019 (002) Page 1
5 Richardson Lane, Stoneham, MA 02180 781-438-7755 (Voice) 781-438-6216 (Fax)
Report Date 11-05-2019Compressive Strength Report - Mortar
Report No.5
Distribution Copy Job Number 23418
Project Halstead Salem Station, 72 Flint Street
Salem, MA
Contractor Fulcrum Associates
Concrete Co.Aggregate Industries
ALL FIELD TESTS DONE ACCORDING TO ASTM:C-1064 C-270
C-109ALL COMPRESSIVE STRENGTH TESTS DONE ACCORDING TO ASTM:
CLASS MORTAR:s-1800#No. Of Sets:1
SET 1 LOCATION:Building 1, Stair 2 course 10
Total Unit
Lab Size Area Date Date Age Load Load
No.(in.)(sq. in.)Condition Cast Tested Days (lbs.)(psi.)
L686 2 x 2 x 2 4.00 Good 11/05/2019 11/12/2019 7 4,000 1,000
L687 2 x 2 x 2 4.00 Good 11/05/2019 12/03/2019 28 12,500 3,130
L688 2 x 2 x 2 4.00 Good 11/05/2019 12/03/2019 28 13,000 3,250
L689 2 x 2 x 2 4.00 Good 11/05/2019 12/03/2019 28 14,000 3,500
Air Temp. (F.)53
Mortar Temp (F)60
Time 10:15
GENERAL REMARKS:
Inspector Premium Travel
Name Time Hours Time
M. Chace No
Bryan M. CrabtreeREVIEWED BY:
Our reports are available in PDF form via email. Please email us at reports@utsofmass.com for more information.
cc:Fulcrum Associates Pat Madden
Fulcrum Associates Brad Scott
Fulcrum Associates Darrin Standish
DMS Design Sid Silveira
DMS Design Dan Skolski
City of Salem Steve Cummings
Veitas & Veitas Linas Dabrila
DSF Group Paul Bowie
DSF Group Benjamin Greene
Fulcrum Group Patricia Dwyer
UTS Matt Chace
DSF Flint Salem LLC Dimitri Kourtis
Fulcrum Associates Bob Levesque
DSF Advisors Thomas Mazza